| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC VILL P O KANUPAT P S UDAYNARAYANPUR DIST HOWRAH PIN CODE 711412 | HOWRAH | WEST BENGAL | 711412 | L1 | Accepted-AOC L1 | |
| 2 | L2₹45.3 L+₹4.7 L (11.5%)Rejected-Finance GCC2 9CP ADARSHA NAGAR KOLKATA WEST BENGAL 700107 | KOLKATA | KOLKATA | WEST BENGAL | 700107 | L2 | Rejected-Finance L2 | |
| 3 | L3₹64.3 L+₹23.7 L (58.3%)Rejected-Finance 21 4 21 3 CENTRAL PARK JADAVPUR KOLKATA 700 032 | KOLKATA | KOLKATA | WEST BENGAL | 700032 | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
9 Feb 2022, 2:00 pmClosed
MD, WBMSCL
Swasthya Bhawan, GN-29, GN Block, Sector V, Bidhannagar, Kolkata, West Bengal 700091
DSIC Operation and Maintenance of Medical Gas Pipeline System at Tufanganj SDH of West Bengal for 5 years
2022_WBMSC_360930_1
WBMSCL/NIT-13/2022, Dated -14.01.2022
Open Tender
MECHANICAL
Item Rate
30 days
Tufanganj SDH
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹50,000
17 Jun 2022
18 Jan 2022
10 Feb 2022
18 Jan 2022
9 Feb 2022
18 Jan 2022
Amount
OXYGEN SYSTEM
2 x 10 size main manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc. as required for the complete manifold system
2 x 5 size manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc. as required for the complete manifold system
Fully automatic control panel for Oxygen with automatic changeover facilities from running bank to reserve bank of cylinders and vice- versa. Non Return Valve, Isolation Valve, Safety Relief Valve, etc. as required for the complete system
Surface/panel/pendant mounted front loading double lock Oxygen outlets with matching Adapters (BS type) as per standards
Oxygen Flowmeter & Humidifier Bottle with matching Adapter: Back Pressure Compensated Flow meter within a range of 0-15 LPM where 0-5 LPM should be with expanded scale. Humidifier bottle should be made of unbreakable polycarbonate materials and autoclavable at 121 degree Centigrade (to be supplied along with required low pressure tubing and face mask)
Distribution of Copper Pipe
12 mm OD x 0.7 mm thick copper pipe
15 mm OD x 0.9 mm thick copper pipe
22 mm OD x 0.9 mm thick copper pipe
28 mm OD x 0.9 mm thick copper pipe
42 mm OD x 1.2 mm thick copper pipe
Isolation Valve
Isolation Valve 15 mm
Isolation Valve 22 mm
Isolation Valve 28 mm
Isolation Valve 42 mm
Area Valve Service Unit
1 gas valve box configuration with size 15 O2
Medical Gas Digital Area Alarm System as per standards
1 service alarm configuration for O2
Turnkey - for both Civil & Electrical work wherever necessary
Operation & Comprehensive Maintenance charges
Operation & Comprehensive Maintenance charges for the 1st Year
Operation & Comprehensive Maintenance charges for the 2nd Year
Operation & Comprehensive Maintenance charges for the 3rd Year
Operation & Comprehensive Maintenance charges for the 4th Year
Operation & Comprehensive Maintenance charges for the 5th Year
ovaron infrastructure & mep services
B.S.MEDICAL INTERNATIONAL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .