| 1 | L1₹5.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S.N.DHATHRIKASH INFRAPROJECTS L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the existing FRC manhole removal and disposal including cost and conveyance of all materials to site and all other labour charges etc., complete as per standard specification | 75 | Nos | 235 ₹17,625 Lowest |
| 2.00 | Excavation for cutting open BT Road or Macadam Road surface for laying the Manhole Complete as per the method statement directed by Departmental officers. | 71.43 | M3 | 946 ₹67,577.42 Lowest |
| 3.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 24.84 | M3 | 109.8 ₹2,727.68 Lowest |
| 4.00 | Centering for sides and soffits of all RCC works concrete slab (or) plane surface including shutting upto 3m height etc., complete cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - with out strutting | 130.43 | M2 | 462.89 ₹60,374.74 Lowest |
| 5.00 | Barricading work (Where the lines are in narrow width of municipality area, busy streets like Market, Bus-stand and in the Highways etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia. and 1.80m height) vertical with horizontal poles in two rows, painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including supplying, delivery and fixing of GI sheet (0.90m x 0.8mm thick) in the horizontal poles and fixing 75mm dia. reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers. (SOR 25-26, Vol II, Pg.no. 233) | 1,060 | RM | 101.65 ₹1,07,749 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 26.08 | M3 | 6,703.35 ₹1,74,850.18 Lowest |
| 7.00 | Supply and delivery of 600mm dia extra heavy duty fiber reinforced concrete(FRCC) frame and cover as per the type HD-20 IS 12592/2002, part 1&2 including all cost of materials and labours including std specification etc complete. (SOR 25-26, Vol II, Page No. 92) | 45 | No | 2,900 ₹1,30,500 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
27 Aug 2026, 3:00 pmClosed
THE COMMISSIONER, ERODE CITY MUNICIPAL CORPORATION
246,MEENAKSHI SUNDARANAR SALAI,ERODE
Raising of UGSS FRC Manhole with cover in Urban Roads at ward no. 34,44,,45,46 and 51
2026_MAWS_691599_1
E1-1858-2026-04-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
60 days
ERODE CITY MUNICIPAL CORPOATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
27 Aug 2026
7 Aug 2026
27 Aug 2026
7 Aug 2026
27 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing FRC manhole removal and disposal including cost and conveyance of all materials to site and all other labour charges etc., complete as per standard specification | 75 | Nos | - | - |
| 2 | Excavation for cutting open BT Road or Macadam Road surface for laying the Manhole Complete as per the method statement directed by Departmental officers. | 71.43 | M3 | - | - |
| 3 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 24.84 | M3 | - | - |
| 4 | Centering for sides and soffits of all RCC works concrete slab (or) plane surface including shutting upto 3m height etc., complete cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - with out strutting | 130.43 | M2 | - | - |
| 5 | Barricading work (Where the lines are in narrow width of municipality area, busy streets like Market, Bus-stand and in the Highways etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia. and 1.80m height) vertical with horizontal poles in two rows, painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including supplying, delivery and fixing of GI sheet (0.90m x 0.8mm thick) in the horizontal poles and fixing 75mm dia. reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers. (SOR 25-26, Vol II, Pg.no. 233) | 1,060 | RM | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 26.08 | M3 | - | - |
| 7 | Supply and delivery of 600mm dia extra heavy duty fiber reinforced concrete(FRCC) frame and cover as per the type HD-20 IS 12592/2002, part 1&2 including all cost of materials and labours including std specification etc complete. (SOR 25-26, Vol II, Page No. 92) | 45 | No | - | - |
stage.html
html • 0.02 MB
finance_831559.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
4.pdf
Tender Documents • 0.46 MB
BOQ_831559.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .