| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.6 LAccepted-Finance | L1 | Accepted-Finance accept | |
| 2 | L2₹38.6 L+₹962.64 (0.02%)Accepted-Finance | L2 | Accepted-Finance accept |
Tender Value
₹38.6 L
EMD Value
₹2 L
Closing Date
9 Jul 2020, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Manager
MMIG B1and 2, Ramganga Vihar, Phase-1, Moradabad
CONSTRUCTION OF GOVT INTER COLLEGE AT MUBARAKPUR BLOCK MILAK DISTRICT RAMPUR
2020_UPPRC_489791_1
38 /PCL/PM/UNIT-21/MORADABAD/ 2020-21
Open Tender
Civil Works
Item Rate
180 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Project Manager UPPCL, Unit-21, Moradabad
₹2 L
Yes
Moradabad
9 Jul 2020
3 Jul 2020
9 Jul 2020
3 Jul 2020
9 Jul 2020
3 Jul 2020
6 Jul 2020
180 days
Amount
Supply of Labour for construction work- 3
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m.(5 fts.) and lead upto 30m.(100 fts.) & including filling. watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30 m.(100 fts.) from the foundation trenches.
Filling of carted earth.
Laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) excluding supply of all materials.including labour and T&P etc. required for proper completion of the work and curing complete. also including cost of from work in foundation but for under floor.
R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in raft foundation and footing excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and excluding supply of all materials, but including labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item
R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in columns excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also excluding supply of all materials, but including labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item
R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in lintels of doors and windows excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also excluding supply of all materials,but including labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item
R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 (M-20) in beams excluding supply of reinforcement and its binding but B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also excluding supply of all materials, but including labour and T & P etc.required for proper completion of the work. Binding wire cost being included in the item
First Class brick work in 1:6 cement and coarse sand of 2.25 fineness modulus) mortar in foundation & plinth excluding supply of all materials,but including labour, and T & P etc.required for proper completion of the work.
Class-150 brick work in super structure in 1:4 cement and coarse sand of 2.25 coarseness modulus mortar in super-structure. Above plinth level up to floor two level (up to two storey) including necessary cutting and molding of brick work as required and also including honey combed brick work in thickness of wall 12cms. Excluding of all material but including of labour T&P etc.
Providing & Laying brick coba 120mm thik laid with M-150 class brick bat coba 7.50 cm thick with gap of 15mm to each other, over 20mm thick base of cement morgar 1:4 cement and coarse sand mixed with wter proofing compound spreading cement slurry mixed with acrylic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top masged false square 30cm x 30cm and sixe wall parapet shall be mono lythic plaster wall upto 30cm higher and junction ans corner shall be rounded by brick ballast cement and coarse sand masonry coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including S/o all material, labour T&P etc complete for proper completion of work. First Floor
Supply and fixing of Kota Stone in flooring 20mm thick andjoint filled with 1:2 cement and coarse sand with approved colouring materials to be given an even shade with 12 mm base coat (bedding) of 1:2 cement & coarse sand morter and polished by hand or machine and finally finished with french manson polish or other approved polish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. 25mm thick.
GST extra as applicable
M/S RAJPAL SINGH CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .