| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-AOC | 1 | Accepted-AOC - | |
| 2 | 2₹3.7 L+₹461.45 (0.12%)Rejected-Finance | 2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | L BOOPATHY CONTRACTOR L1 | D SAKTHIVEL L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavating and depositing on bank with in inintial lead & lift for all loose soil, sub soil, black cotton soil, murram gravelly soil, hard re earth, shales, except hadr rock requiring blasting, etc., Complete as per SS 20 B. for foundation. | 38 | M3 | 224.1 ₹8,515.8 Lowest | 234 ₹8,892 |
| 2.00 | Cement Concrete 1:4:8 ( One Cement Four sand and Eight aggregate ) using 40 mm ISS HBG metal, including cost and conveyance of materials to site, labour charges for mixing, laying, finishing, compacting, curing etc.complete. | 4.5 | M3 | 4,895.3 ₹22,028.85 Lowest | 4,900 ₹22,050 |
| 3.00 | Brickwork in cement mortar 1:5 ( one cement and five sand ) mix using well burned new country bricks, including cost and conveyance of all materials to site, labour charges for mixing, laying, finishing, symaltaneously pointing with same morter, watering etc.complete.. | 16 | M3 | 6,286.5 ₹1,00,584 Lowest | 6,300 ₹1,00,800 |
| 4.00 | Plastering in Cement Mortor 1:5 Mix (one cement, five sand) 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 49 | M2 | 493.5 ₹24,181.5 Lowest | 498 ₹24,402 |
| 5.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 16 | M2 | 637 ₹10,192 Lowest | 650 ₹10,400 |
| 6.00 | Reinforcement Cement Concrete 1:1/2:3 (One cement, One & Half sand, Three aggregate ) using 20 mm guage machine broken hard broken granite stone jelly for all RCC including cost conveyance and all labour charges etc. complete | 2.5 | M3 | 8,414.5 ₹21,036.25 | 6,450 ₹16,125 Lowest |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 250 | Kg | 88.8 ₹22,200 Lowest | 92 ₹23,000 |
| 8.00 | Ceiling Plastering in Cement Mortor 1:3 Mix (one cement, Three sand) 10mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 11.5 | M2 | 283.5 ₹3,260.25 Lowest | 290 ₹3,335 |
| 9.00 | Plastering in Cement Mortor 1:5 Mix (one cement, five sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 38 | M2 | 246 ₹9,348 Lowest | 250 ₹9,500 |
| 10.00 | Providing Wooden Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug. | 9 | nos | 2,850 ₹25,650 Lowest | 2,950 ₹26,550 |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
23 Dec 2025, 3:00 pmClosed
EXECUTIVE OFFICER
NAMAGIRIPETTAI TOWN PANCHAYAT
Retrofitting of Community Toilet at Ward.10 Kongalamman Kovil Road in Namagiripettai Town Panchayat in Namakkal District.
2025_DTP_632589_1
SBM 2.0 - Renovation of Community Toilet 4.50 - Namagiripettai TP
Open Tender
Civil Works
Works
180 days
NAMAGIRIPETTAI TOWN PANCHAYAT
As Per Tender Notice
3 documents required · 3 mandatory
₹0
₹4,500
Yes
NAMAGIRIPETTAI TOWN PANCHAYAT
31 Jan 2026
16 Dec 2025
23 Dec 2025
16 Dec 2025
23 Dec 2025
16 Dec 2025
16 Dec 2025 - 16 Dec 2025
19 Dec 2025
Earthwork excavating and depositing on bank with in inintial lead & lift for all loose soil, sub soil, black cotton soil, murram gravelly soil, hard re earth, shales, except hadr rock requiring blasting, etc., Complete as per SS 20 B. for foundation.
Cement Concrete 1:4:8 ( One Cement Four sand and Eight aggregate ) using 40 mm ISS HBG metal, including cost and conveyance of materials to site, labour charges for mixing, laying, finishing, compacting, curing etc.complete.
Reinforcement Cement Concrete 1:1/2:3 (One cement, One & Half sand, Three aggregate ) using 20 mm guage machine broken hard broken granite stone jelly for all RCC including cost conveyance and all labour charges etc. complete
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Ceiling Plastering in Cement Mortor 1:3 Mix (one cement, Three sand) 10mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specifications.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tendernotice_2.pdf
PDF • 0.88 MB
BOQ_756804.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .