Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.2 L+₹6,976.77 (0.85%)Admitted-Fee/PreQual/Technical/Finance E B OFFICE B 636 301 | NAMAKKAL | TAMIL NADU | 636301 | ₹8.2 L+₹6,976.77 (0.85%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BALAMURUGAN ENTERPRISES L1 | K Mani L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 21.6 | m3 | 4,969.91 ₹1,07,350.06 | 3,900 ₹84,240 Lowest |
| 2.00 | 2. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 2,000 | m3 | 125.59 ₹2,51,180 | 125 ₹2,50,000 Lowest |
| 3.00 | 3. Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork
including diesel, oil and labour charges etc., complete. | 40 | hrs | 953.54 ₹38,141.6 Lowest | 1,200 ₹48,000 |
| 4.00 | 4. Refixing cut stone slab RCC Cover slab lift as per the direction of departmental officers etc. completed. | 19.8 | m3 | 649.12 ₹12,852.58 | 511 ₹10,117.8 Lowest |
| 5.00 | 5. Supplingand fabricating and placing in position MS (or)R.T.S. bar for reinforcement toallRCCworksasper the design given including cost of steel and binding wire also in all floors. | 6 | qtl | 9,351.31 ₹56,107.86 | 7,849 ₹47,094 Lowest |
| 6.00 | 6. Manufacturing, supplying and fixing Precas Reinforced Cement 100mm thick slab (using 20mm HBGS Jelly) Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges,casting of slab, finishing,curingandfixinginposition in all floor setc.,complete complying with standard specification and as directed. | 108 | m2 | 999.99 ₹1,07,998.92 | 130 ₹14,040 Lowest |
| 7.00 | 7.RemovalofExcavatedExcessEarthawayfromthesiteto5K.Mincluding loading and transportation charges etc, complete as per standard specification. For 1M3 | 2,394.8 | m3 | 101.92 ₹2,44,078.02 Lowest | 155 ₹3,71,194 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
18 Aug 2026, 3:00 pmClosed
Assistant Commissioner, Central Zone,Coimbatore Co
The Assisstant Commissioner, Coimbatore City Municipal Corporation, Central Zone, Hosur road, Coimbatore 641 018.
Desilting of existing Strom Water Drain at Ward Areas in ward no 65 Central Zone
2026_MAWS_690297_15
e2/2026-CZ
Open Tender
Civil Works
Works
90 days
Central Zone, Coimbatore Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
19 Aug 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 21.6 | m3 | - | - |
| 2 | 2. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 2,000 | m3 | - | - |
| 3 | 3. Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork
including diesel, oil and labour charges etc., complete. | 40 | hrs | - | - |
| 4 | 4. Refixing cut stone slab RCC Cover slab lift as per the direction of departmental officers etc. completed. | 19.8 | m3 | - | - |
| 5 | 5. Supplingand fabricating and placing in position MS (or)R.T.S. bar for reinforcement toallRCCworksasper the design given including cost of steel and binding wire also in all floors. | 6 | qtl | - | - |
| 6 | 6. Manufacturing, supplying and fixing Precas Reinforced Cement 100mm thick slab (using 20mm HBGS Jelly) Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges,casting of slab, finishing,curingandfixinginposition in all floor setc.,complete complying with standard specification and as directed. | 108 | m2 | - | - |
| 7 | 7.RemovalofExcavatedExcessEarthawayfromthesiteto5K.Mincluding loading and transportation charges etc, complete as per standard specification. For 1M3 | 2,394.8 | m3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_829856.xls
BOQ • 0.32 MB
ITB.pdf
Additional Documents • 0.05 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .