EE (SDW) VII
NSTP Coronation Pillar Delhi 110009
Renovation of Standard make APFC Panel installed at Bharola SPS
2023_DJB_234915_3
NIT No 20 (2022-23)
Open Tender
Miscellaneous Works
Works
15 days
NSTP Coronation Pillar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Online
₹6,400
28 Jan 2023
16 Jan 2023
23 Jan 2023
16 Jan 2023
23 Jan 2023
16 Jan 2023
Checking of capacitors and other components of capacitors panel and dismantling of old damaged components of APFC panels i.e. capacitors, MCB, contactors, APFC relay, indicating lights and their power & control wiring connections with main bus bar and incoming & outgoing circuits etc. as required.
Supply of heavy duty capacitors of various capacities rated at 440V , 3 phase, 50 Hz Ac complete with terminal cover and discharge device- make STANDARD
Banking of capacitors of various capacities with multi-strand copper wires & lugs /aluminum bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank
Supply of microprocessor based APFC relay with digital display of power factor and other parameters -make Standard
Control wiring of APFC relay with multi-stand copper wires, lugs, tapes etc. As required at site
Supply of capacitor duty contactors for capacitors rating 25 KVAr- make L&T/Schneider/GE/Havell's
Supply of Triple pole MCB 63 A rating -make L&T/Havell's, Schneider
Power wiring of contactors and MCBs for incoming and outgoing circuits with multi-strand copper wires, lugs, tapes etc. As required at site
Supply & fixing of LED type indication lights of various colors as required at site-make FTC/Technik
Installation of capacitor banks including termination with existing cables, gland and lugs earthing of capacitor banks as required at site.
Fixing of all above components in the APFC panel with suitable fabrication work to accommodate new items in the existing feeders for alignment of components and ease of termination complete with hardware etc. as required at site.
Testing & commissioning of complete capacitor installation including following: 01. Dusting of complete panel 02. Meggering of complete capacitor installation using 500V megger 03. Continuity test for checking continuity of all circuits 04. Alignment of doors 05. Tightening of all nuts and bolts. 06. Cleaning of all contact points and joints 07. Setting of APFC relay for target power factor
Comprehensive maintenance of APFC panel after expiry of 6 months guarantee period by regular visits of our Engineer and replacement of defective parts within AMC period to maintain power factor at 0.98
bhawani electrical system
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .