Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.4 L+₹73,468.13 (7.57%)Rejected-Finance GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.5 L+₹1.8 L (18.3%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹12.9 L
EMD Value
₹25,840
Closing Date
26 Oct 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ADGC ALIGARH
EE ADGC ALIGARH
RECONSTRUCTION OF OLD DAMAGED VRB OF LAHTOI DRAIN AT KM 37.920
2023_UPIDC_851926_1
5155 dt 07.10.2023
Open Tender
Civil Works
Item Rate
61 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹25,840
9 Jan 2024
18 Oct 2023
26 Oct 2023
18 Oct 2023
26 Oct 2023
18 Oct 2023
Amount
EARTH WORK IN MAKING AND REMOVING BANDHAS BACKFILLING DIRVERSION IN ORDINARY SOIL INCLUDING LIFT UP TO 1.50M AND LEAD UP TO 30M
LAYING OF HUME PIPE NP 3 TYPE 900MM DIA IN POSITION LABOUR ONLY INCLUDING ALL COST OF LABOUR AND T AND P ETC REQUIRED FOR PROPER COMPLETION OF WORK
DISMANTLING BRICKS OR STONE MASONARY IN LIME OR CEMENT INCLUDING STACKING OF DISMANTLED MATERIALS AS DIRECTED BY THE ENGINEER IN CHARGE WITHEN A DISTANCE OF 60 METER
DISMANTLING REINFORCED CEMTNT CONCRETE WORK INCLUDING STAGCKING OF DISMANTLED MATERIAls as directed
EARTH WORK IN EXCAVATION IN FOUNDATION IN ORDINARY SOIL INCLUDING LIFT UP TO 1.5M AND LEAD UP TO 30M
C C 1 3 6 CEMENT COARSE SAND STONE BALLAST 20MM TO 40 MM IN FOUNDATION INCLUDING COST OF MATERIAL LABOUR AND T AND P
Ist CLASS BRICK WORK IN 1 4 CM INCLUDING ALL COST OF MATERIAL LABOUR AND T AND P
CENTERING AND SHUTTERING FOR RCC WORKS INCLUDONG COST OF CENTERING AND SHUTTERING LABOUR MATERIAL ETC COMPLETE
STEEL RAINFORCEMENT INCLUDING BENDING BINDING CUTTING AND PLACING AT POSITION INCLUDING ALL COST OF MATERIAL LABOUR AND T AND P
SUPPLYING AND FIXING 75MM DIA PIPE OF 6 KG PER SQCM WORKING PRESSURE FOR SLAB INCLUDING ALL MATERIAL LABOUR AND T AND P
PROVIDING AND LAYING RCC 1 1.5 3 WITH CEMENT COARSE SAND AND 25MM TO 10 MM STONE GRIT INCLUDING COST OF ALL MATERIAL LABOUR AND T AND P ETC COMPLETE
PROVIDING AND LAYING WEARING COAT IN CEMENT CONCRETE M20 1 1.5 3 WITH CEMENT COARSE SAND AND 25MM TO 10 MM STONE GRIT INCLUDING COST OF ALL MATERIAL LABOUR AND T AND P ETC COMPLETE
STRUCKDEEP POINTING IN 1 2 ON BRICK MASONRY CEMENT COARSE SAND INCLUDING COST OF ALL MATERIAL LABOUR AND T AND P ETC COMPLETE
FINISHING WALLS WITH ACRYLIC SMOOTH EXTERIOR PAINT APEX OF APPOVED BRAND AND MANUFACTURE AND OF REQUIRED SHADE IN TWO COAT ON UNDACORATED WALL SURFACE TO GIVE EVEN SHADE OVER AT RATE 1.67 LTR PER 10 SQM INCLUDING PRIMING COAT OF EXTERIOR PRIMER APPLIED AT RATE KG PER 10 SQM INCLUDING COST OF ALL MATERRIAL LABOUR T AND P ETC REQUIRED FOR PROPER COMPLETIOM OF WORK
SUPPLY AND FIXING OF INFORMATION BOARD INCLUDING WRITING MATERIAL LABOUR ETC COMPLETION OF WORK
M/S KANHAIYA LAL CONTRACTOR
M/S RAKESH KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .