| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹92.7 Laccepted-aoc | accepted-aoc |
Tender Value
₹88.3 L
EMD Value
₹1.8 L
Closing Date
29 Apr 2026, 9:30 pmClosed
Minor Irrigation Department
ALWYN AGERA
Construction of retaining wall near Bellippady Sri Sakaleshwara Panchalingeshwara Mahadeva temple in Puttur taluk of Dakshina Kannada district.
MI/2026-27/FP/WORK_INDENT11668
MI/2026-27/FP/WORK_INDENT11668
Open
Flood Protection Works
Two Tender Document System(Two Cover)
Minor Irrigation Division Mangalore
7 documents required · 7 mandatory
Contractor Registration Certificate
3.2 (c) Executed in any one financial year the minimum quantities of work, Earthwork in both excavation and embankment (combined quantities) : 696.00 Cum, Cement concrete (including RCC and PSC) : 812.00 Cum, Steel works for RCC : 5.70 MT
3.2 (a)To qualify for award of this contract each tenderer in his name should have in the last five years period..2021-22 to 2025-26 (a) achieved in atleast two financial years an average annual financial turnover ( in all classes of civil engineering construction works only) of Rupees 88.33 lakhs (usually not less than the estimated cost under this contract )
3.2 (b)Satisfactory completion (at least 90% of the contract value) as a prime contractor at least one similar work such as Construction of concrete retaining wall work of value not less than Rs. 44.17 Lakhs.
Availability of Project Engineer And Organization Chart
Details of Ongoing Works
Details of works already Tendered for
3.3(b)liquid assets and /or availability of credit facilities of not less than Rs. 26.50 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. for works costing upto Rs.100.00 lakhs)
Affidavit
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
₹2,210
₹1.8 L
29 Apr 2026
21 Apr 2026
30 Apr 2026
28 Apr 2026
Format for 3.2 (b)
SI.No Name of Work Estimated cost Tendered cost Cost of work executed Cost of work to be executed Date of agreement Stipulated period of completion Scheduled date of completion
Divisional Officer
Note:- The statement showing the value of existing commitments and On - Going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the employer in charge, not below the rank of an Executive Engineer or equivalent.
Programme of work
Name of work: Construction of retaining wall near Bellippady Sri Sakaleshwara Panchalingeshwara Mahadeva temple in Puttur taluk of Dakshina Kannada district.
MI/2026-27/FP/WORK_INDENT11668
SNo Item Name Unit Estimate Quantity Rate Amount 1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month 11th Month Total Amount
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-In all kinds of soils Depth upto 3 m, complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 209.60 114.24 23,944.70 150.00 17,136.00 59.60 6,808.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23,944.70
2 Earth work excavation for Foundation by mechanical means In all kinds of soil & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-In all kinds of soils Depth upto 3 m, (Under water situation) .complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 209.60 118.88 24,917.25 120.00 14,265.60 50.00 5,944.00 39.60 4,707.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24,917.25
3 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 31.44 6,707.68 210,889.46 0.00 11.00 73,784.48 11.00 73,784.48 9.44 63,320.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 210,889.46
4 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 982.50 7,664.16 7,530,037.20 0.00 110.00 843,057.60 110.00 843,057.60 110.00 843,057.60 110.00 843,057.60 110.00 843,057.60 110.00 843,057.60 110.00 843,057.60 110.00 843,057.60 102.50 785,576.40 0.00 7,530,037.20
5 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification- All other type of structures. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. tonne 7.08 89,621.28 634,787.53 0.00 0.78 69,904.60 0.78 69,904.60 0.78 69,904.60 0.80 71,697.02 0.80 71,697.02 0.80 71,697.02 0.78 69,904.60 0.78 69,904.60 0.78 70,173.46 0.00 634,787.53
6 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 62.88 1,431.36 90,003.92 0.00 21.00 30,058.56 21.00 30,058.56 20.88 29,886.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90,003.92
7 Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 450.31 508.48 228,973.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 150.00 76,272.00 300.31 152,701.63 228,973.63
8 Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. m 237.60 377.44 89,679.74 0.00 0.00 0.00 80.00 30,195.20 0.00 80.00 30,195.20 0.00 77.60 29,289.34 0.00 0.00 0.00 89,679.74
EW/embankment 869.51 696.00 Cum
Cement concrete 1013.94 812.00 Cum
Steel 7.08 5.70 MT
WORK DONE CERTIFICATE
Name of the Department
Name of Division
1 Name of work :
2 Estimated Cost :
3 Agreement No. :
4 Name of Contractor :
5 Tendered cost :
6 Date of work order :
7 Stipulated period of completion :
8 Intended date of Complition :
9 Final Date of completion, (For completed work) :
10 Revised amount of work (including claims/extra/arbitration amount,if any) :
11 Cost of work executed :
12 Balance cost of work :
13 Whether final bill is paid :
14 Reasons for non completion of work in schedule period of completion :
15 Whether any penalties fine/stop notice/compensation/liquidated damage imposed/Imposed & canceled :
a) Earth Excavation :
b) Embankment :
c) Providing & laying M-15 :
d) Providing & laying M-10 :
f) Rubber & Earth Filling :
g) Providing & laying M-20
16 Remarks of the Engineer performance of the Contractor working style quality consciousness tendency of claims :
Divisional Officer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Star rate GO.pdf
Others - Star rate GO • 2.13 MB
11668_kw-3_bid document.doc
Tender Document • 2.01 MB
Format for 3 2b.xls
Others - Format for 3 2b • 0.01 MB
Labour GO.docx
Others - Labour GO • 0.98 MB
Insurance surety Bond format.pdf
Others - Insurance surety Bond format • 0.43 MB
LOC format.pdf
Others - LOC format • 0.35 MB
E Payment.doc
Others - E Payment • 0.22 MB
General specifications.pdf
Instructions to Tenderers • 0.57 MB
11668_programme_of_work.xlsx
Others - Program of work • 0.20 MB
Royalty GO.pdf
Others - Royalty GO • 0.06 MB
Work done format.xls
Others - Work done format • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .