Tender Value
₹19.1 L
EMD Value
₹38,500
Closing Date
23 Jun 2026, 3:00 pm
S.E. (EHT-C) Circle Bhopal
F-3 Administrative Complex Building MPPTCL Bijli Nagar Colony Govindpura Bhopal
Construction of RCC Protection wall around cable termination monopoles at different sites in modification shifting work of 132 KV Lines for Bhopal Metro
2026_MPPTC_512545_1
TS-68/471
Open Tender
Civil Works - Others
90 days
Bhopal
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹38,500
3 Jun 2026
3 Jun 2026
25 Jun 2026
3 Jun 2026
23 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan)..... etc complete | 120 | Cum. | 147 | ₹17,640 | SOR 2.6 |
| 2 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan)… etc Ordinary rock | 50 | Cum. | 287 | ₹14,350 | SOR2.7.1 |
| 3 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over
areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan)… etc Hard rock (blasting prohibited) | 50 | Cum. | 828 | ₹41,400 | SOR2.7.3 |
| 4 | Filling available excavated earth(excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in
depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 60 | Cum. | 95 | ₹5,700 | SOR 2.24 |
| 5 | Transportation By Mechanical Transport including loading, unloading and stacking. Earth 1 KM | 100 | Cum. | 139.47 | ₹13,947 | SOR 1.1.2 |
| 6 | Providing and laying in position cement concrete
of specified grade excluding the cost of centering
and shuttering - All work upto plinth level :With 40mm nominal size graded stone aggregate.M-7.5 Nominal Mix -1 Cement : 4 sand : 8
graded stone aggregate | 6 | Cum. | 3,474 | ₹20,844 | SOR 4.1.2.3 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete (nominal / design mix with 20mm nominal size graded stone aggregate).. etcM-20 Grade Concrete | 46 | Cum. | 6,153 | ₹2,83,038 | SOR 5.1.1 |
| 8 | Centering and shuttering including strutting,
propping etc. and removal of form work for :Upto plinth: Foundations, footings, bases for
columns, plinth beams, curtain walls, columns
below plinth. | 15 | Sqm. | 169 | ₹2,535 | SOR 4.3.1 |
| 9 | Centering and shuttering in cluding strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for concrete upto plinth level | 160 | Sqm. | 190.6 | ₹30,496 | SOR 5.9.1 |
| 10 | Centering and shuttering in cluding
strutting, propping etc. and removal of form
for:Lintels, beams, girders, bressumers and
cantilevers | 45 | Sqm. | 356 | ₹16,020 | SOR 5.9.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
Tendernotice_2.pdf
PDF • 0.75 MB
section2.pdf
Tender Documents • 1.14 MB
Section1.pdf
Tender Documents • 1.30 MB
Instructions.pdf
Other Document • 0.02 MB
BOQ_617344.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid