Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹32.6 LSame as L1Accepted-Finance | ₹32.6 LSame as L1 | L2 | Accepted-Finance L2 agreed to execute the work at L1 rate as per OPWD code vide his Lt. No. Nil dated 27.05.2026 |
| 2 | L3₹37.5 L+₹4.9 L (14.9%)Accepted-Finance BEHERA | NA | NA | 121004 | ₹37.5 L+₹4.9 L (14.9%) | L3 | Accepted-Finance Financial Bid verified |
| 3 | L3₹37.5 L+₹4.9 L (14.9%)Accepted-Finance | ₹37.5 L+₹4.9 L (14.9%) | L3 | Accepted-Finance Financial Bid verified |
| 4 | L3₹37.5 L+₹4.9 L (14.9%)Accepted-Finance AT DUNDULI PO JKPUR DIST RAYAGADA | RAYAGADA | ODISHA | ₹37.5 L+₹4.9 L (14.9%) | L3 | Accepted-Finance Financial Bid verified |
| 5 | L3₹37.5 L+₹4.9 L (14.9%)Accepted-Finance | ₹37.5 L+₹4.9 L (14.9%) | L3 | Accepted-Finance Financial Bid verified |
Tender Value
₹37.5 L
EMD Value
₹37,500
Closing Date
16 Apr 2026, 5:00 pmClosed
S.E, M.I Division, Rayagada
O/o S.E, M.I Division, Rayagada
Construction of Canal lining of Main Canal from RD2437m to 2957m(Tail) and Branch Canal from RD 1280m to 1805m of Puhundi MIP in Kasipur Block of Rayagada District under MIPSP Scheme for the Year 2026-27
2026_CEMIB_127858_9
SEMIDRGD-01/2026-27
National Competitive Bid
Civil Works - Others
Percentage
120 days
Rayagada
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹37,500
Yes
7 Sept 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
7 Apr 2026 - 16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungle and uprooting stumps and small bushes and trees of below 1 M girth on pre-measurement and depositing the debrises clear of worksite with all lead and lift complete in all respect as directed by the Engineer-in-charge. | - | 1 Sqm | 0.8 | - |
| 2 | Earth work in excavation for foundation to proper profile in all kinds of soil with all leads and lifts including dressing and levelling the bed to proper slope and level making it fit for laying concrete including depositing the excavated materials clear of work site with all leads and lifts including dewatering from foundation if necessary complete in all respect as directed by the Engineer-in-Charge etc. | - | 1 Cum | - | - |
| 3 | Filling foundation and plinth with good quality sand in canal bed with all leads and lifts including watering and ramming and compaction with cost, carriage, royalty, EMF, DMF, additional charges etc. complete in all respect as per the direction of the Engineer-in-charge . | - | 1 Cum | 0.72 | - |
| 4 | Providing rigid shuttering with box type steel shuttering plates with keys for immediate construction joints in rafts of weirs, barrages and dam blocks including cost of all materials and labours,T&P, conveyance, royalty and taxes required for the work etc. complete in all respect as directed by Engineer-In-Charge. | - | 1 Sqm | - | - |
| 5 | Supplying, straightening, cutting, bending, binding and tying the HYSD bars and placing in position as reinforcement and anchoring including lapping where necessary including cost of HYSD bars & binding wire with all leads, lifts from bending yard to placement point including cost, conveyance, labour, T&P & all taxes required for this item etc. complete in all respect as directed by the Engineer-in-charge. | - | 1 Qntl | - | - |
| 6 | Cement concrete M15 grade with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer with all leads & lifts including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty,EMF, DMF, additional charge and other taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-in-charge. | - | 1 Cum | - | - |
| 7 | Reinforcement Cement concrete in (M 20) with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty,EMF, DMF, additional charge and other taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-in-charge. | - | 1 Cum | - | - |
| 8 | Providing weep holes in Brick masonary/ plain/Reinforced conscrete abutment, wing wall with 100mm dia AC pipe through the full width of the structure with slope of 1 V:20H including cost, conveyance, Rayalty with Labour, T & P and other taxes of all materials etc complete in all respect as directed by the Engineer in charge. | - | 1 RM | - | - |
| 9 | Filling in foundation and plinth with excavated earth including watering and ramming etc. complete including cost, conveyance, royalty and other taxes of all materials with supply of all labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in-charge. | - | 1 Cum | - | - |
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
finance_587124.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
DTCN01.pdf
Tender Documents • 4.91 MB
BOQ_587124.xls
BOQ • 0.26 MB
TCN01.PDF
Additional Documents • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .