Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89,887Accepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹1.0 L+₹12,158.20 (13.5%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | L3₹1.1 L+₹20,299.36 (22.6%)Rejected-AOC | L3 | Rejected-AOC Found 3rd Higher | |
| 4 | L4₹1.5 L+₹60,923.40 (67.8%)Rejected-AOC | L4 | Rejected-AOC Found 4th Highest |
Tender Value
₹1.1 L
EMD Value
₹1,500
Closing Date
24 Jul 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER, EDC, BANDA
INDIRA NAGAR, BANDA
Erection of 11 KV Line for Vill. Rauli Kalyanpur (Patauda Mod) under EDD, Banda
2020_DVVNL_454508_3
106/SE/EDCB/2019-20
Open Tender
Electrical Works
Item Rate
30 days
BANDA
AS PER ANNEXURED
2 documents required · 2 mandatory
₹1,180
DVVNL
₹1,500
O/O SE, EDC, BANDA
13 Jan 2022
18 Jul 2020
24 Jul 2020
18 Jul 2020
24 Jul 2020
18 Jul 2020
21 Jul 2020
Amount
The work of ERECTION of 11 KV Line & installation of metering systems on 8.5/11 Mtr. long PCC/ST Poles with ACSR Weasel Conductor/XLPE Cable for giving new connection to M/s. Jay Shriman Narayan Stone Crusher in Vill. RAULI-KALYANPUR (PATAUDA MOD) (NARAINI) fed from 33/11 KV SUB-STATION, BADAUSA at EDSD, BANDA (RURAL)/ATARRA under FULL DEPOSIT SCHEME YEAR 2019-20 as per Passed Package No. 09/BR/DEP./2019-20 under EDD, BANDA, detail of the work as given below :-
Safely cartage of 8.5 Mtr. long PCC poles from store centre to the work site through the Kachha Pacca road including the work of loading, unloading & dragging at the respective ends.
Safely cartage of 11 Mtr. long ST poles from store centre to the work site through the Kachha Pacca road including the work of loading, unloading & dragging at the respective ends.
Safely cartage of line material from store centre to the work site through the Kachha Pacca road including the work of loading, unloading & dragging at the respective ends.
Erection & grouting of Single Support Structure on 8.5 Mtr. long PCC poles, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection & grouting of Double Pole Structure on 8.5 Mtr. long PCC poles, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection & grouting of Single Support Structure on 11 Mtr. long ST poles, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material.
Earth of each support by earthing rod with complete fittings as per RESSPO schedule.
Cartage, erection & installation of 11 KV CT/PT Combined Unit, 3 Phase 4 Wire Static TVM 11 KV Meter, pilfer proof metering cubicle equipments etc. as per RESSPO manual.
Fixing of T-Off Channel with fitting of all accessories as per norms.
Cleaning of line roots by cutting of bushes and tree branches.
Laying, Sagging & Stringing of ACSR Weasel Conductor of all the 3 Phase with proper binding of conductor with insulator fixing of armour rod, jumpering & jointing of conductor (where necessary) as laid down in RESSPO schedule.
Digging of trench 600x600 deep for 11 kV XLPE Cable 3x120 mm2 protecting through first class brick layer arround the cable with sand filling, including safely transportation of cable to respective site of work.
Laying of 11 KV under ground XLPE Cable 3x120 mm2 with sand & bricks.
Digging of trench 600x600 deep for 11 kV XLPE Cable 3x185 mm2 protecting through first class brick layer arround the cable with sand filling, including safely transportation of cable to respective site of work.
Laying of 11 KV under ground XLPE Cable 3x185 mm2 with sand & bricks.
Fabrication of "V" type Cross arm, channel, angle etc. as per RESSPO Schedule, including the work of transportation of above material to concerning work site.
Guarding of 11 KV line at road/river crossing by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per direction of supervising engineer/RESSPO manual.
Filling & fixing of 11 KV XLPE cable jointing kit of indoor type of size 3x120 sq.mm.
Filling & fixing of 11 KV XLPE cable jointing kit of outdoor type of size 3x185 sq.mm.
VERMA ELECTRICAL AND CONSTRUCTION CO
M/s. CHATURVEDI CONSTRUCTION
ARVIZON POWER INFRATECH PVT LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .