| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-Finance | ₹9.9 L | L1 | Accepted-Finance Less Quoted |
| 2 | L2₹10.0 LAccepted-Finance | ₹10.0 L | L2 | Accepted-Finance Above Quoted |
| Sl No | Description | Qty | Unit | sundaresan L2 | S MANOHARAN L1 |
|---|---|---|---|---|---|
| 1.00Part I : Renovation of Two Class Room School Building (PUMS) in J.J Nagar at Sirukaveripakkam Panchayat Estimate Amount : 2.84 Lakhs | |||||
| 2.00 | Clean removal of cement plaster from walls and Celling including all charges etc complete | 67.61 | Sqm | 11 ₹743.71 | 9 ₹608.49 |
| 3.00 | Casurina Poles 8cm-10cm dia For Scaffolding | 123 | Sqm | 21 ₹2,583 | 19 ₹2,337 |
| 4.00 | Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly to site and all labour charges etc complete | 67.61 | Sqm | 160 ₹10,817.6 | 158 ₹10,682.38 |
| 5.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 67.61 | Sqm | 310 ₹20,959.1 | 308 ₹20,823.88 |
| 6.00 | Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealed PVC Plug point | 1 | Each | 1,196 ₹1,196 | 1,194 ₹1,194 |
| 7.00 | Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealed PVC light/ fan point (SD No.25) | 1 | Each | 2,431 ₹2,431 | 2,429 ₹2,429 |
| 8.00 | Supply and fixing of 1200mm sweep AC ceiling fan complete with stepped electronic regulator with 300mm down rod on the existing clamp SD 107 | 1 | Each | 2,402 ₹2,402 | 2,400 ₹2,400 |
| 9.00 | Supply and fixing of 4'-18W LED tube with fitting inclusive of all charges | 1 | Each | 407 ₹407 | 405 ₹405 |
| 10.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 120.95 | Sqm | 207 ₹25,036.65 | 205 ₹24,794.75 |
Tender Value
₹10.3 L
EMD Value
₹10,300
Closing Date
25 Feb 2026, 3:00 pmClosed
Block Development Officer BP Kancheepuram
Block Development Office Kancheepuram
Renovation of School and Anganwadi Buildings 7 Works in Sirukaveripakkam Panchayat at Kancheepura Union Under Rural Building Maintenance Policy / 2025-26 PKG No.TNKPM 28/2025-26 Est Amt . 10.30 Lakhs
2026_RDTN_660901_1
RC.No. 229/2026/A7 28 Dt.16.02.2026
Open Tender
Civil Works - Others
90 days
Kancheepuram Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,300
15 May 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Part I : Renovation of Two Class Room School Building (PUMS) in J.J Nagar at Sirukaveripakkam Panchayat Estimate Amount : 2.84 Lakhs
Clean removal of cement plaster from walls and Celling including all charges etc complete
Casurina Poles 8cm-10cm dia For Scaffolding
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly to site and all labour charges etc complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealed PVC Plug point
Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealed PVC light/ fan point (SD No.25)
Supply and fixing of 1200mm sweep AC ceiling fan complete with stepped electronic regulator with 300mm down rod on the existing clamp SD 107
Supply and fixing of 4'-18W LED tube with fitting inclusive of all charges
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Plastering with Cement Mortar 1:3, 10mm thick including cost and conveyance of all materials and labour charges etc., complete
Plastering with Cement Mortar 1:5, 12mm thick including cost and conveyance of all materials and labour charges etc., complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats of block board using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Providing reflector tile for top of roof including all other charges etc complete
Part II : Renovation of Two Class Room School Building (PUMS) in Sirukaveripakkam Village at Sirukaveripakkam Panchayat Estimate Amount : 0.59 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Part III : Renovation of Three Class Room School Building (PUMS) in Sirukaveripakkam Panchayat Estimate Amount : 4.35 Lakhs
Clean removal of cement plaster from walls and Celling including all charges etc complete
Casurina Poles 8cm-10cm dia For Scaffolding
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly to site and all labour charges etc complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealed PVC light/ fan point (SD No.25)
Supply and fixing of 1200mm sweep AC ceiling fan complete with stepped electronic regulator with 300mm down rod on the existing clamp SD 107
Supply and fixing of 4'-18W LED tube with fitting inclusive of all charges
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats of block board using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Providing reflector tile for top of roof including all other charges etc complete
Part IV : Renovation of Two Class Room School Building (PUMS) 1 in Sirukaveripakkam at Sirukaveripakkam Panchayat.(Ceiling Putty) Estimate Amount : 0.59 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Part V : Renovation of Three Class Room School Building (PUMS) in Sirukaveripakkam at Sirukaveripakkam Panchayat.(Ceiling Putty) Estimate Amount : 0.89 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Part VI : Renovation of Two Class Room School Building (PUMS) 1 in J.J Nagar at Sirukaveripakkam Panchayat.(Ceiling Putty) Estimate Amount : 0.59 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Part VII : Renovation of Anganwadi Building in Damal Old Colony at Damal Panchayat Estimate Amount : 0.45 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Schedule.pdf
Tender Documents • 0.65 MB
BOQ_793031.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid