| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC rates are lowest accepted by cbo |
| 2 | L2₹2.3 CrRejected-AOC A P CHANDRE TAL RADHANAGARI DIST KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416221 | ₹2.3 Cr | L2 | Rejected-AOC rates are higher not approved by cbo |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Naresh H Gurbani L1 | Guru Construction L2 |
|---|---|---|---|---|---|
| 1.00BUILDING STRUCTURE | |||||
| 1.01 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Godown -420.07 Shed 47.25 | 467.32 | Cum | 244.26 ₹1.1 L | 244.26 ₹1.1 L |
| 1.02 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means Godown -168.58 Shed 168.58 | 168.58 | Cum | 267.86 ₹45,155.84 | 267.86 ₹45,155.84 |
| 1.03 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means Godown -168.58 Shed 168.58 | 168.58 | Cum | 368.16 ₹62,064.41 | 368.16 ₹62,064.41 |
| 1.04 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Godown -128.57 Shed 22.22 | 150.79 | Cum | 8,800.24 ₹13.3 L | 8,800.24 ₹13.3 L |
| 1.05 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Godown -0.91 Shed 0 | 0.91 | Cum | 9,597.24 ₹8,733.49 | 9,597.24 ₹8,733.49 |
| 1.06 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete.Godown -1 Shed | 1 | Cum | 7,221.95 ₹7,221.95 | 7,221.95 ₹7,221.95 |
| 1.07 | Providing and laying damp proof course 50 mm thick in M20 cement concrete layer and bitumen / using cement with waterproofing compound curing, formwork etc. complete.Godown -44.56 Shed 0 | 44.56 | Sqm | 1,740.2 ₹77,543.31 | 1,740.2 ₹77,543.31 |
| 1.08 | Providing and laying in situ /Ready Mix cement concrete M-20 of trap / granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, Steel centering formwork, laying/pumping cover blocks, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)Godown -112.49 Shed 11.97 | 124.46 | Cum | 9,445 ₹11.8 L | 9,445 ₹11.8 L |
| 1.09 | Providing and laying Cast in situ/Ready Mix cement concrete M-20 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete.(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Godown -36.86 Shed 11.88 | 48.74 | Cum | 17,326 ₹8.4 L | 17,326 ₹8.4 L |
Tender Value
₹2.3 Cr
Closing Date
30 Sept 2025, 11:00 amClosed
President of CBO
JAIPUR LANDE GUT NO 259 TQ KHAMGAON DIST BULDHANA
1 Construction of 1800 MT Capacity warehouse building with ancillary works 2 Constructin of Seed Processing unit shed 204.69 Sq Mt with Ancillary Work
2025_DOAWB_1214281_1
smart/agri/52/jaygajanan/2025
Open Tender
Civil Works
365 days
JAIPUR LANDE GUT NO 259 TQ KHAMGAON DIST BULDHANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Exempted
District Implementing unit Project Director Atma
27 Mar 2026
30 Aug 2025
1 Oct 2025
30 Aug 2025
30 Sept 2025
30 Aug 2025
16 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_2098293.xls
BOQ • 0.35 MB
tenderdocsjaygajanan.pdf
Tender Documents • 1.44 MB
Download all tender documents and submit your bid