Loading…
Loading…
Tender Value
₹16.3 L
EMD Value
₹32,500
Closing Date
2 Jun 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
HQ
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Part I Offer Letter, Part II General Instructions to tenderer and Tender Conditions & Annexures-Attached
Half-Yearly Shutdown, Maintenance, and Repair Works of Long Forging Machine (LFM) and Other Machineries in Axle Forge Shop (AFS).
RWF-M-OT-AFM-2026-27-12
RWF-M-OT-AFM-2026-27-12
Open
Works - General
12 Months
Bengaluru Urban, Karnataka
₹0
₹32,500
2 Jun 2026
11 May 2026
19 May 2026
4 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,86,602.14 | ||
| 1 Overhauling of Billet Cutting Machine 1.1 Clean the below chains, sprockets below torch bearings and plummer blocks, replace worn out/damaged plummer blocks and bearings. 1.2 Cut the damage portion of the conveyor guard, cut the required dimensions and weld on the cut portion of the conveyor guard. 1.3 Cleaning of Hydraulic power pack and its surrounding thoroughly and Fill the new Hydraulic Oil with servo system 32 1.4 The welding joints on the north side of the bloom loading unit shall be cut and removed. Using the EOT crane, the north-side stationary bed (bloom) & support billets shall be lifted & positioned at nominated place. A 20 mm thick plate shall be cut to dimensions of 2 m x 1 m (width x length) to fabricate a base plate. The fabricated 20 mm base plate shall be positioned and two support billets shall be installed vertically over the base plate to prevent sagging of the bloom loading unit, the stationary bed (bloom) shall be repositioned and welding shall be carried out at all joint, including the bed, support billets and base plate. Additional welding shall also be carried out at all identified cracked areas of the bloom loading unit.. 2 Overhauling of Turn Table 2.1 Strengthen the chain guard with proper hinges and locking arrangements, lock rods.Weld knurling lines over rollers 3 Overhauling of LFM conveyors 3.1 Dismantle top cover guard and plummer blocks(approx.44 nos). Clean all the chains, sprockets and plummer blocks, replace the damaged plummer blocks. 3.2 Overhauling of Descaling Unit: Dismantle the complete unit, service the rollers, replace the bearing for rollers. Replace the springs with new one and assemble back the unit. 4 Overhauling of Axle End Cutting Machine and complete Conveyor Unit. 4.1 Replace the below torch bearings of the rollers on both side of the roller shaft with new one (10 Nos). 4.2 Remove bend, Repair and strengthen the pulley holding base of bin transfer, replace the pulley if damaged, weld thoroghly. 5 Overhauling of band saw machine (big and small) 5.1 Inspect the inner brass bush, bearings, pipe lines, wheel pulley, gear box, hoses, coneyor rollers, chain, chain guard, plummer block and replace if worn out 5.2 Dismantel the hydraulic cylinders and shift the released cylinders to EMMS. Shift back the serviced from emms and assemble the unit onto the machine, turn on the hydraulic and check for leakages, arrest if any leakages noticed 5.3 Clean the hydraulic tank and assemble back, top up 32 grade oil in the tank. 6 Supervision charges (2 nos) | — | — | — | 3,86,602.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIOfferletter.pdf
ATTACHMENT
PartIIInstructionstoTenderers.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVBreakupofratesandschedule.pdf Part V Breakup of rates and schedul
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
Part VIII GCC doc
ATTACHMENT
PartVBreakupofratesandschedule.pdf
ATTACHMENT
GCC_April-2022_merged_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .