Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
11 Dec 2023, 3:00 pmClosed
PR & CC
Supply, Transportation and Installation of SMART PYLONS
2300008058-HD-09050
5100008058
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
11 Dec 2023
17 Nov 2023
11 Dec 2023
11 Dec 2023
18 Nov 2023 - 1 Dec 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | FAB AND SPLY OF SMART | FAB AND SPLY OF SMART — SIGN, FABRICATION, TESTING, PACKING AND SUPPLYOF SMART PYLONS. MS FRAMES, ALUMINIUM COMPOSITEMATERIAL (ACM) CLADDING, ELECTRICAL VINYL, PET-G FORMING,LED LIGHTING AND IT'SCABLING WITHREQUIRED POWER DRIVERS ETC. ALL SHALL BE AS PERENCLOSED DRAWINGS / PECIFICATIONS. ACM WILL BECLADDED ON MS FRAMEWORK. DRAWINGS ENCLOSED WITHTENDER ARE INDICATIVE. DETAILED FABRICATION /SHOP FLO DRAWINGS SHALL BE DEVELOPED BY VENDORAND SUBMITTED TO HPCL FOR APPROVAL INCL.THEDETAILED DESIGN OF LED LIGHTING MODULE AND FIXI ARRANGEMENT AS PER THE SPECIFICATIONS PROVIDED INLED DATA SHEETS. SCOPE INCLUDES FABRICATION OFPROTOTYPE OF SMART PYLON BASIS CL APPROVEDDRAWINGS / SPECIFICATIONS, IMPROVEMENTS /ALTERATIONS / CORRECTIONS AS PER INSTRUCTIONS& OFFERING FINISHED PROTO PE FOR APPROVAL.PROTO TYPE APPROVAL SHALL BE OBTAINED FROM HPCLBEFORE MASS PRODUCTION. RATE INCLUDES ALLMATERIALS, MOULDS, ANC LARIES, TAXES / CESS /DUTIES / LEVIES ETC. NO ESCALATION /DE-ESCALATION SHALL BE PERMITTED FOR ANY REASONWHATSOEVER DURING PUR ASE ORDER VALIDITY PERIOD.THIRD PARTY INSPECTION (TPI) TO BE ARRANGED &PAID BY HPCL. COST OF TPI NOT TO BE INCLUDED INOFFE PRICE. ALL PYLONS SHALL BE INSPECTED BY TPIAGENCY BASIS APPROVED QAP (QUALITY ASSURANCEPLAN). SUPPLY AND FABRICATION OF PRICE DI LAYSYSTEM (LED DISPLAY MODULE) WITH REMOTE RATEUPDATION MODULE FOR SMART PYLON (FOR DISPLAYINGALL PRODUCT LINES ON ONE SIDE OF MART PYLON).LED PRICE DISPLAY SHALL BE PAID EXTRA. THEFOUNDATION SHALL BE CASTED BY HPCL. HOWEVER,VENDOR HAS TO SUPPLY AND DEL ER WELL IN ADVANCETEMPLATES AND FOUNDATION BOLTS WITHIN 7 DAYS FROMDATE OF ADVICE FOR PYLONS TO THE DESIGNATEDOUTLETS. | - | Each |
| 2 | TRANSPT OF SMART PYLON -- TNLP-CVR PURCHASE PLANT | TRANSPT OF SMART PYLON -- TNLP-CVR PURCHASE PLANT — CKING, LOADING, TRANSPORTATION, UNLOADING ANDSTACKING OF SMART PYLON & ANCILLARIES ATDESGINATED RETAIL OUTLETS INCL. INSURAN . | - | Each |
| 3 | INSTLN AND COMMNG SMART TNLP-CVR PURCHASE PLANT | INSTLN AND COMMNG SMART TNLP-CVR PURCHASE PLANT — ECTING, INSTALLATION AND COMMISSIONING OFPYLONS / ANCILLARIES / INCLUDING LED PRICEDISPLAY SYSTEM. RATE INCLUDES HOISTING,LAUN ING, TOOLS, TACKLES, MACHINERY, JIGS,SCAFFOLDING, FRAMEWORK ETC. ALL NEEDED FORERECTION. CARE SHALL BE TAKEN NOT TO DISTURBOUT T OPERATION AND TO ENSURE NO DAMAGE TO THEPYLON OR OUTLET FACILITIES. ALL SAFETY MEASURESSHALL BE TAKEN WHILE ERECTION. THE FOUN TIONSHALL BE CASTED BY HPCL. SCOPE INCLUDES UNPACKING. | - | Each |
| 4 | CONST FOUNDATION SMART | CONST FOUNDATION SMART — OVIDING FOUNDATION FOR SMART PYLON AT ADVISEDRETAIL OUTLETS. VENDOR TO CAST THE FOUNDATION ASPER THE DRAWING ATTACHED AND ALSO T SUPPLY THEFOUNDATION BOLTS. THIRD PARTY INSPECTION (TPI) OFBOLTS TO BE ARRANGED & PAID BY HPCL. COST OFTPI NOT TO BE INCLU D IN OFFER. THE FOUNDATIONTO BE CASTED WELL IN ADVANCE BEFORE INSTALLATIONOF PYLON. | - | Each |
| 5 | SUPPLY,LED PRC DSPLY | SUPPLY,LED PRC DSPLY | - | Each |
| 6 | SUPPLY,LED PRC DSPLY | SUPPLY,LED PRC DSPLY | - | Each |
| 1 | FAB AND SPLY OF SMART | FAB AND SPLY OF SMART — SIGN, FABRICATION, TESTING, PACKING AND SUPPLYOF SMART PYLONS. MS FRAMES, ALUMINIUM COMPOSITEMATERIAL (ACM) CLADDING, ELECTRICAL VINYL, PET-G FORMING,LED LIGHTING AND IT'SCABLING WITHREQUIRED POWER DRIVERS ETC. ALL SHALL BE AS PERENCLOSED DRAWINGS / PECIFICATIONS. ACM WILL BECLADDED ON MS FRAMEWORK. DRAWINGS ENCLOSED WITHTENDER ARE INDICATIVE. DETAILED FABRICATION /SHOP FLO DRAWINGS SHALL BE DEVELOPED BY VENDORAND SUBMITTED TO HPCL FOR APPROVAL INCL.THEDETAILED DESIGN OF LED LIGHTING MODULE AND FIXI ARRANGEMENT AS PER THE SPECIFICATIONS PROVIDED INLED DATA SHEETS. SCOPE INCLUDES FABRICATION OFPROTOTYPE OF SMART PYLON BASIS CL APPROVEDDRAWINGS / SPECIFICATIONS, IMPROVEMENTS /ALTERATIONS / CORRECTIONS AS PER INSTRUCTIONS& OFFERING FINISHED PROTO PE FOR APPROVAL.PROTO TYPE APPROVAL SHALL BE OBTAINED FROM HPCLBEFORE MASS PRODUCTION. RATE INCLUDES ALLMATERIALS, MOULDS, ANC LARIES, TAXES / CESS /DUTIES / LEVIES ETC. NO ESCALATION /DE-ESCALATION SHALL BE PERMITTED FOR ANY REASONWHATSOEVER DURING PUR ASE ORDER VALIDITY PERIOD.THIRD PARTY INSPECTION (TPI) TO BE ARRANGED &PAID BY HPCL. COST OF TPI NOT TO BE INCLUDED INOFFE PRICE. ALL PYLONS SHALL BE INSPECTED BY TPIAGENCY BASIS APPROVED QAP (QUALITY ASSURANCEPLAN). SUPPLY AND FABRICATION OF PRICE DI LAYSYSTEM (LED DISPLAY MODULE) WITH REMOTE RATEUPDATION MODULE FOR SMART PYLON (FOR DISPLAYINGALL PRODUCT LINES ON ONE SIDE OF MART PYLON).LED PRICE DISPLAY SHALL BE PAID EXTRA. THEFOUNDATION SHALL BE CASTED BY HPCL. HOWEVER,VENDOR HAS TO SUPPLY AND DEL ER WELL IN ADVANCETEMPLATES AND FOUNDATION BOLTS WITHIN 7 DAYS FROMDATE OF ADVICE FOR PYLONS TO THE DESIGNATEDOUTLETS. | - | Each |
| 2 | TRANSPT OF SMART PYLON -- KLLP-CVR PURCHASE PLANT | TRANSPT OF SMART PYLON -- KLLP-CVR PURCHASE PLANT — CKING, LOADING, TRANSPORTATION, UNLOADING ANDSTACKING OF SMART PYLON & ANCILLARIES ATDESGINATED RETAIL OUTLETS INCL. INSURAN . | - | Each |
| 3 | INSTLN AND COMMNG SMART KLLP-CVR PURCHASE PLANT | INSTLN AND COMMNG SMART KLLP-CVR PURCHASE PLANT — ECTING, INSTALLATION AND COMMISSIONING OFPYLONS / ANCILLARIES / INCLUDING LED PRICEDISPLAY SYSTEM. RATE INCLUDES HOISTING,LAUN ING, TOOLS, TACKLES, MACHINERY, JIGS,SCAFFOLDING, FRAMEWORK ETC. ALL NEEDED FORERECTION. CARE SHALL BE TAKEN NOT TO DISTURBOUT T OPERATION AND TO ENSURE NO DAMAGE TO THEPYLON OR OUTLET FACILITIES. ALL SAFETY MEASURESSHALL BE TAKEN WHILE ERECTION. THE FOUN TIONSHALL BE CASTED BY HPCL. SCOPE INCLUDES UNPACKING. | - | Each |
| 4 | CONST FOUNDATION SMART | CONST FOUNDATION SMART — OVIDING FOUNDATION FOR SMART PYLON AT ADVISEDRETAIL OUTLETS. VENDOR TO CAST THE FOUNDATION ASPER THE DRAWING ATTACHED AND ALSO T SUPPLY THEFOUNDATION BOLTS. THIRD PARTY INSPECTION (TPI) OFBOLTS TO BE ARRANGED & PAID BY HPCL. COST OFTPI NOT TO BE INCLU D IN OFFER. THE FOUNDATIONTO BE CASTED WELL IN ADVANCE BEFORE INSTALLATIONOF PYLON. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2300008058-HD-09050.pdf
TENDER_DOCUMENT • 23.01 MB
Download all tender documents and submit your bid