SUSHANT DESHPANDE
thyssenkrupp Industrial Solutions India Pvt Ltd Vikhroli Mumbai India
Supply of CENTRIFUGAL PUMPS FOR SLURRY APPLICATION for Numaligarh Refinery Limited
2022_NRL_666567_1
TK-1P25A-MP-RFQ-0007
Single
Mechanical Tools and Equipment
Supply
420 days
NUMALIGARH REFINERY LTD
NOT Applicable
5 documents required · 5 mandatory
₹0
Exempted
1 Jun 2022
4 Jan 2022
25 Feb 2022
4 Jan 2022
24 Feb 2022
25 Jan 2022
4 Jan 2022 - 18 Jan 2022
Amount
SUPPLY OF CENTRIFUGAL PUMPS FOR SLURRY APPLICATION Design, engineering, procurement, fabrication, inspection, testing and SUPPLY OF Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) -1 Lot with accessories, Commissioning Spares as per details given in MR and any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Total cost of supplies outside India in foreign currency above mentioned tag.
Total cost of supplies from India in INR above mentioned tag.
Transportation Charges for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) Route survey (if required)
Transportation of supplies outside India in foreign currency Upto Kolkata Port from FOB Port of Exit above mentioned tag.
Transportation cost of supplies from India in INR Upto NRL Site from FOT dispatch point above mentioned tag.
Charges for Mandatory Spares (List as per MR) for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B)
Charges for Mandatory Spares for supplies outside India in foreign currency above mentioned tag.
Charges for Mandatory Spares for supplies from India in INR above mentioned tag.
Charges for TPI as per Categorisation defined in the ITP attached to MR for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) TPI Scope will be as per steps indicated in ITP. Any item coming from outside India would be under TPI Scope irrespective of categorization plan attached with ITP.
Charges for TPI for supplies outside India in foreign currency above mentioned tag.
Charges for TPI for supplies from India in INR above mentioned tag.
Charges for Spare parts for two year operation (List as per MR) for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) (It will not be considered for price evaluation)
Charges for Spare parts for two year operation (List as per MR) for supplies outside India in foreign currency for above mentioned tag.
Charges for Spare parts for two year operation (List as per MR) for supplies from India in INR for above mentioned tag.
SUPPLY OF CENTRIFUGAL PUMPS FOR SLURRY APPLICATION Design, engineering, procurement, fabrication, inspection, testing and SUPPLY OF CLO Product Pumps (Tags 1P25-PA-2302 A/B) -1 Lot with accessories, Commissioning Spares as per details given in MR and any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Total cost of supplies outside India in foreign currency for above mentioend tag
Total cost of supplies from India in INR above mentioned tag.
Transportation Charges for CLO Product Pumps (Tags 1P25-PA-2302 A/B) Route survey (if required)
Transportation of supplies outside India in foreign currency Upto Kolkata Port from FOB Port of Exit for above mentioned tag.
Transportation cost of supplies from India in INR Upto NRL Site from FOT dispatch point for above mentioned tag.
Charges for Mandatory Spares (List as per MR) for CLO Product Pumps (Tags 1P25-PA-2302 A/B)
Charges for Mandatory Spares for supplies outside India in foreign currency for above mentioned tag.
Charges for Mandatory Spares for supplies from India in INR for above mentioned tag.
Charges for TPI as per Categorisation defined in the ITP attached to MR for CLO Product Pumps (Tags 1P25-PA-2302 A/B) TPI Scope will be as per steps indicated in ITP. Any item coming from outside India would be under TPI Scope irrespective of categorization plan attached with ITP.
Charges for TPI for supplies outside India in foreign currency for above mentioned tag.
Charges for TPI for supplies from India in INR for above mentioned tag.
Charges for Spare parts for two year operation (List as per MR) for CLO Product Pumps (Tags 1P25-PA-2302 A/B) (It will not be considered for price evaluation)
Charges for Spare parts for two year operation (List as per MR) for supplies outside India in foreign currency for above mentioned tag.
Charges for Spare parts for two year operation (List as per MR) for supplies from India in INR for above mentioned tag.
Charges for SITE Supervision of Erection / Installation and Testing for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) & CLO Product Pumps (Tags 1P25-PA-2302 A/B)
Per diem charges for upto 8 hours work on normal working days. (From outside India in foreign currency )
Per diem charges for upto 8 hours work on normal working days. (From India in INR)
Overtime rate / hour beyond normal 8 hours work on normal working days. (From outside India in foreign currency )
Overtime rate / hour beyond normal 8 hours work on normal working days. (From India in INR)
Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). (From outside India in foreign currency )
Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). (From India in INR)
Lumpsum Charges for Training as per requirement specified in MR for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) & CLO Product Pumps (Tags 1P25-PA-2302 A/B)
Lumpsum Charges for Training outside India in foreign currency for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) & CLO Product Pumps (Tags 1P25-PA-2302 A/B)
Lumpsum Charges for Training from India in INR for for Main Fractionator Bottom Pumps (Tags 1P25-PA-2301 A/B) & CLO Product Pumps (Tags 1P25-PA-2302 A/B)
Description of Work / Item(s)
Amount
BREAK-UP OF TOTAL MANDATORY SPARES PRICES Main Fractionator Bottom Pumps ( Tag No: 1P25-PA-2301 A/B) as per MR
BREAK-UP OF TOTAL MANDATORY SPARES PRICES For CLO Product Pumps ( Tag No: 1P25-PA-2302 A/B) as per MR
Description of Work / Item(s)
Amount
BREAK-UP OF TOTAL 2 YEARS OPERATIONAL SPARES PRICES For Main Fractionator Bottom Pumps ( Tag No: 1P25-PA-2301 A/B) as per MR
BREAK-UP OF TOTAL 2 YEARS OPERATIONAL SPARES PRICES For CLO Product Pumps ( Tag No: 1P25-PA-2302 A/B) as per MR
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .