Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹7,900
Closing Date
26 May 2022, 2:30 pmClosed
SE/SEDC/Salem
O/o.The Superintending Engineer, TANGEDCO, Kamaraj Nagar Colony, Udayapatty, Salem - 636014
Survey Supply Erection Testing and Replacement of 22 KV ACSR 7/2.59 mm by HT Aerial Bunched Cable of Size 3x50 1 x 50 Sq mm Bare Messenger in Iluppanatham 22 KV feeder for Segregation of Agl load in Puliankurichi Section Under RDSS Scheme
2022_EB_233221_1
SE/SEDC/WC.008/2022-23 DT.20.05.2022
Open Tender
Electrical Works
Works
180 days
Puliankurichi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,900
2 Jun 2022
20 May 2022
27 May 2022
20 May 2022
26 May 2022
21 May 2022
Amount
Supply of AB Cable & Accessories
Supply of 22 KV HT Aerial Bunched Cable of size 3x50 Sq.mm (Phase) + 1x50 Sq.mm Bare messenger (Inclusive of 5% Sag)
AB Cable Suspension Clamp Assembly including Pole Clamp
AB Cable Dead End Clamp / Anchor Clamp Assembly
End Termination Kits for AB Cable 3x50 Sq.mm
Straight Joint Kit for AB Cable 3x50 Sq.mm
Erection of AB Cable & Accessories
Erection of of 22 KV HT Aerial Bunched Cable of size 3x50 Sq.mm (Phase) + 1x50 Sq.mm Bare messenger (Inclusive of 5% Sag)
Erection of AB Cable Suspension Clamp Assembly including Pole Clamp
Erection of AB Cable Dead End Clamp / Anchor Clamp Assembly
Erection of End Termination Kits for AB Cable 3x50 Sq.mm
Erection of Straight Joint Kit for AB Cable 3x50 Sq.mm
EXCAVATION of POLE/STAY PIT
Excavation of pole pit upto 27" (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0mtr r Pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of poles.
RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
RCC poles/Metal poles above 8.0 mtr by using JCB or manual
Erection of stay set complete
FIXING OF CROSS ARMS:
LT 3 phase cross arms
Fixing of Aluminium Knob
FIXING OF INSULATORS
Fixing of HT pin Insulators 22 KV
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
Paving of Conductor, stringing etc., complete with ACSR/ AAAC for both HT/LT lines.
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
Concreting of poles:
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Earthing of Pole
Earthing of pole with coil earthing including burying looping and binding.
Painting
Numbering of pole with paint and with base painting.
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Transport of Materials Below 8 Kms (Plains)
Transport of Materials Above 8 Kms for Additional KM (Irrespective of Weight in Tonnage)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading of Poles upto 8.0 M/27'
Loading of poles above 8.0 M
Unloading of Poles upto 8.0 M/27
Unloading of Poles above 8.0 M
Loading of materials
Unloading of materials
Loading or unloading of Transformer upto 100 KVA
Erection of New Transformer all capacities (with jumpering)
DT/ DP erection
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Dismantling
Dismantling - LT Pin Insulator
Dismantling - LT Shackle
Dismantling -ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .