Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Finance | -42.61% | ₹10.7 L | L1 | Admitted-Finance |
| 2 | L2₹11.1 LAdmitted-Finance | -40.52% | ₹11.1 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Technically irresponsive. |
Tender Value
₹18.6 L
EMD Value
₹37,280
Closing Date
12 Feb 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer, PHED, Division Nagaur
Work of Removal of Leakages, unlowering Lowering and maintenance of RWSS Peepasar Sewari Cheela
2026_PHCJA_534909_1
NIT No 55/2025-26 EE Nagaur
Open Tender
Civil Works - Water Works
365 days
Executive Engineer, PHED, Division Nagaur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer
₹37,280
Yes
23 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete, including cost of material components required to repair pump sets, starters, meters etc. of electric panel of tube wells, lowering and unlowering of pump sets complete in all respect, maintenance of log books & History sheet as directed by Engineer incharge for tube well per month (excluding repairing of pump sets) Tube wells 14 Nos. x12 = 168 Nos.
Running expenditure of pump houses which includes complete operation of pump motor, maintenance of log books as directed by Engineer incharge general up keeping of premises, security arrangements, Regular chemical dosing in CWR cleaning and desilting of SR/ CWR/ SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month (excluding repairing of pumping machinery etc.) for upto 50 HP = 1*12= 12 Nos. for Cheela Pump house (Single Shift)
for upto 50 HP = 1*12= 12 Nos. for Cheela (Single Shift)
2*12= 12 Nos. for Sewari & Peepasar Pump house (Two Shift)
Maintenance of pipe line irrespective of size & material which includes repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 Nos. residual chlorine samples during daily supply timings, inter connections and all works related to to pipe line network in existing distribution / rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil / hard soil including cutttop , WBM & CC top of road of any size at work site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T&P. Contractor with his own resources shall arrange dewatering. ICB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipe line network within the scope of work for per Km. pipe line per month jointing material shall be provided by the department pipe line AC/ PVC / HDPE/ DI
a) Size 63mm to 150mm dia (109.55 x 12 = 1314.60 Km.)
b) Size 160mm to 350mm dia (14.65x 12 = 175.80 Km.)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
55.pdf
Tender Documents • 3.98 MB
BOQ_953097.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid