| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹44,500
Closing Date
14 Aug 2024, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP) MELUR
PANCHAYAT UNION OFFICE MELUR
Madurai District Construction of 100000 Ltr. Capacity OHT with 12 Mtr Staging for Kottanathampatti Village and Panchayats in Melur Block Under Nabard 2024-25 Pack06
2024_RDTN_472053_9
2085/2024/T3/Package01
Open Tender
Civil Works
Item Rate
180 days
Melur
Refer Tender document
3 documents required · 3 mandatory
₹0
₹44,500
14 Aug 2024
12 Aug 2024
14 Aug 2024
12 Aug 2024
14 Aug 2024
13 Aug 2024
Amount
NAME OF THE WORK : Construction of 100000 Ltr. Capacity OHT with 12 Mtr Staging for Kottanathampatti Village and Panchayat
Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil and except hard rock requiring blasting including shoring, strutting, bailing water wherever necessary and all other incidental charges etc., complete as directed by departmental officers as per S.S.20B -for 1 st depth
Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil and except hard rock requiring blasting including shoring, strutting, bailing water wherever necessary and all other incidental charges etc., complete as directed by departmental officers as per S.S.20B -for 2nd depth
Supplying and filling with good river sand from approved quarry layers not more than 15 cm including cost and conveyance of all materials and all labour charges for filling, watering & consolidation etc., complete as per standard specification 24 &25 NBC Part VI (S2) 8 28 V,VI S25
Plain Cement Concrete 1:4:8 mix, (one part of cement, four part of sand and eight part of aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete and other incidental charges etc., complete. as per standard specification 28 V,VI S25
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. as per standard specification 28 V,VI S25 (Beyond 0.20 m & up to 0.35 m below GL)
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. as per standard specification 28 V,VI S25 ( above GL10.35mtr )
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. etc., complete. as per standard specification 28 V,VI S25 (From 0 m to 4.50m above GL)
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. etc., complete. as per standard specification 28 V,VI S25 (From 4.50 m to 7.32 m above GL)
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. as per standard specification 28 V,VI S25 (From 7.32 m to 10.98 m above GL)
Supply and erection of steel centering, shuttering for soffits and sides including necessary support strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3mm for boarding laid over Silver Oak joists of size 10cmx6.5cm space at 10cm c/cand supported by Casurino Prop 10cm-13cm spaced at 75cm c/c etc., complete and as directed by Departmental Officers.
Steel centering for 0 to 3.30 m (Plane surface)
Steel centering plane surface 3.30 m to 4.30m
Steel centering plane surface 6.30 m to 7.30m
Steel centering square column 0 m to 3.30m Above GL
Steel centering square column 3.30 m to 4.30m
Steel centering square column 4.30 m to 5.30m
Steel centering square column 5.30 m to 6.30m
Steel centering square column 6.30 m to 7.30m
Steel centering square column 7.30 m to 8.30m
Steel centering square column 8.30 m to 9.30m
Steel centering square column 9.30 m above
Steel centering square column 10.30 m to 11.30m
Steel centering up to I Curved surface 10.30 m to 11.30m
Steel centering Round column 0 m to 3.30m
Steel centering Round column 3.30 m to 4.30m
Steel centering Round column 4.30 m to 5.30m
Steel centering Round column 5.30 m to 6.30m
Steel centering Round column 6.30 m to 7.30m
Steel centering Round column 7.30 m to 8.30m
Steel centering Round column 8.30 m to 9.30m
Steel centering Round column 9.30 m to 10.30m
Steel centering Round column 10.30 m to 11.30m
Supply and fabrication of steel using TMT rods for all Reinforced cement concrete works including cost and conveyance of all materials and all labour charges for cutting, bending and placing the rod in position and tying up the rods with binding wire and other incidental charges etc., complete. as per standard specification SS 86 & 86A V,VI, VII (S6) 7,3
Painting two coats with Emulsion paint of approved colour and quality including cost and conveyance of all materials and labour charges and other incidental charges to site etc., complete. as per standard specification
Refilling the foundation with excavated soil (other than sand) including cost and conveyance of all materials and labour charges to siteand other incidental charges etc., complete as per standard specification
Providing and fixing of RCC Hand rails in position of approved design for one metre height including cost and conveyance of all materials and labour charges to site etc., complete
Supply of following Heavy duty G.I. Pipe and specials conforming to IS 1239/Part I/90 of approved make including cost and conveyance of all materials and labour charges and other incidental charges to site etc., complete. as per standard specification
1) 80mm GI Pipe (Heavy duty)
2) 80mm GI Coupling (Heavy duty)
3) 80 mm GI Elbow (Heavy duty)
4) 80 mm GM Gate Valve (Heavy duty)
5) 80 mm GI Union (Heavy duty)
6) 80 mm GI H Nipple (Heavy duty)
7) 100 mm GI Pipe (Heavy duty)
8) 100 mm GI Coupling (Heavy duty)
9) 100 mm GI Elbow (Heavy duty)
10) 100 mm GM Gate Valve (Heavy duty)
11) 100 mm GI Union (Heavy duty)
12) 100 mm GI H Nipple (Heavy duty)
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Column upto G.L.
Column upto 4.50m from G.L.
Beyond 1.50 m & up to 4.50 m below GL
Upto 1.50 m below GL
Column upto 4.50m - 7.32 m from G.L.
Column upto 7.32m - 10.98m from G.L.
Column upto 10.98m-14.64 m from G.L.
Column upto 14.64m-18.30 m from G.L.
Column upto 18.30m-21.96 m from G.L.
Reinforced Cement Concrete 1:1.5:3 mix,(one part of cement, one and half part of sand and three part of aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete and other incidental charges to site etc., complete. as per standard specification 28 V,VI S25
Reinforced Cement Concrete 1:1.5:3 mix,(one part of cement, one and half part of sand and three part of aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete and other incidental charges to site etc., complete. as per standard specification 28 V,VI S25
Supply and erection of steel centering, shuttering for soffits and sides including necessary support strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3mm for boarding laid over Silver Oak joists of size 10cmx6.5cm space at 10cm c/cand supported by Casurino Prop 10cm-13cm spaced at 75cm c/c etc., complete and as directed by Departmental Officers.
Rectangular portion below G.L.
Column upto G.L.
Charges for mould for casting steps
Charges for mould for casting handrails
Charges for mould for casting jollyworks
Providing scaffolding for a length of 4m wide
Provision for Name board
Provision for Photograph charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M ABDUL MUTHALIF (BID ID -1108536)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .