Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹30.1 L
EMD Value
₹30,150
Closing Date
3 Nov 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO
BDO,KADAYANALLUR
Construction of 1,00,000 litre OHT at Kasitharmam Village in Kasitharmam Panchayat in Kadayanallur Panchayat union, Tenkasi District under MP LADS 2021-22, 2023-24
2023_RDTN_380352_1
BDOKNR/422/2022-A3
Open Tender
Civil Works
Item Rate
KADAYANALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹30,150
Yes
3 Nov 2023
19 Oct 2023
3 Nov 2023
19 Oct 2023
3 Nov 2023
19 Oct 2023
Amount
Construction of 1,00,000 litre OHT at Kasitharmam Village in Kasitharmam Panchayat in Kadayanallur Panchayat union
Earth work excavating and depositing on bank with initial lead of 10m and /initial lift of 2m in hard stiff clay, stiff black cotton, hardred earth, shales, murram, gravel, stoney earth and eartmixedwith small size boulders and hard gravelly soil SS
First depth of 2m
2nd depth of 1m
Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete
Cement concrete 1:4:8 (one cement, four sand, and eight course aggregate of 40mm size hard blue granite broken stone ) for levelling course including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc,
R.C.C. 1:1.5:2(M30) (one cement one and half sand and two 20mm &10mm HBG stone) for Floor slab floor beam &side wall excluding the cost of reinforcement, centering and shuttering but including the cost of mixing, placing, vibrating of concrete curing and finishing etc., complete as directed by the officers.
For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES
Below GL
Below & 3.30m ht from G.L
Above GL (+3.300 - +4.300m)
For Brace I
For Brace II
For Floor Beam and Bottm of Floor slab
CURVED SURFACE
For Side Wall, & Floor slab sides and Haunch
Above GL (+11.300 - +12.300m)
For Side Wall, Roof Slab sides
SQUARE COLUMN
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m )
For column ( 4.31m to 5.30m)
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.30m to 11.55m )
CENTRAL CIRCULAR COLUMN
Column above 0 to 3.3m
For column ( 3.31m to 4.30m )
For column ( 4.31m to 5.30m)
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
Providing MS Ladder & Hand rails arrangements in 60,000 Lits. Capacity OHT With 12.00m Staging Height.
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.
Supply & Delivery of following Pipes and specials for OHT connection
Supply of GI Pipes for OHT Connections 65 mm dia
65mm Ø GI Elbow
65mm Ø GI coupling
65mm Ø GI Flange Set
65mm Ø GM Gate valve
SUB ESTIMATE
Rain Water Harvesting Structure and Platform
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B.
For first depth of 2m
For Core wall
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Plastering with cm 1:5mix 12mm thick including all cost and conveyance and all labour charges etc., complete.
Collection and supply of 40mm HBG metal and filling in to the recharge pits including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials, watering, curing and compacting and all other incidental charges etc.,
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
INR Builders
stage.html
html • 0.02 MB
finance_453289.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .