Loading…
Loading…
Tender Value
₹9.0 Cr
EMD Value
₹17.9 L
Closing Date
31 Aug 2026, 3:00 pm3d left
Yashpal Meena
MD PSCL
4th floor, ICCC Building, SSP Campus gandhi maidan
Yashpal Meena
MD PSCL
Selection of Agency for the Supply, Installation, Testing & Commissioning of Electric Vehicles with AI based solution for Civic-Services Surveillance & Monitoring (Nagar Netra).
137754
08/MD/PSCL/2026-27
Open Tender
IT-Related-works
Bihar
• Name of the Bidder
• Address of the Bidder
• Type of Firm/Company/Organization
(Partnership/Private/Public/PSU/Govt.)
• Contact details (Mobile & Email Id)
• GSTIN Number
• PAN number
IT-Related-works
ITEM RATE
L1
3
20 documents required · 20 mandatory
₹11,800
Processing Fee: 11800
₹17.9 L
PATNA SMART CITY LIMITED 4th Floor Patna Smart City Building, SSP Office, North of Gandhi Maidan
10 Aug 2026
10 Aug 2026
1 Sept 2026
10 Aug 2026
31 Aug 2026
10 Aug 2026
17 Aug 2026
Patna Smart City Ltd.
Contact Details/Email
Patna Civic Services Monitoring Platform at ICCC, Smart City Patna
SL. No Item Unit Cost (Including GST) UoM Qty Total (Including GST) Remarks
A) Pilot Phase (3 months)
1 For AI-based detection, predictive alerts & civic service models for 03 use cases already developed a. Garbage b. Solid Waste c. Encroachment a. Unswept Roads b. Potholes on Roads c. Open Manholes d. Streetlight Malfunctions, etc. per use case 3 0
2 Manpower for development of 7 Use cases as per client requirement and ICCC Integration a. Unswept Roads b. Potholes on Roads c. Open Manholes d. Streetlight Malfunctions, etc. Months 3 0 Project Manager -1 Data Labeling and Preparation -2 AI/ML Developer-4 Data Scientist - 2 QA- 1 ICCC Integration Cost
3 Cameras and GPS module with complete set-up (Outdoor IP camera+GPS tracking for real-time data capture with memory card + Wifi set- up with automated video upload capability from Camera memory + Camera mount with Anti-Tampering &Anti-Theft Design Features) Nos. 3 0 Includes the installation and commissioning cost
4 Product Application License, Mobile Apps, Dashboards & related Integrations Lumsum 1 0 Software License, Product Application, Contractor mobile app, Admin Mobile app, ICCC integration
5 Additional GPU Server requirement Nos. 4 0 Includes the configuration & Deployment cost and one time warranty for 3 yrs
6 Training & Capacity Building Lumsum 1 0 Workshops & Sessions for min 20 officials
7 E-Scooters & Connected Hardware with Branding Nos. 3 0 for field patrolling & verification by ground team
8 Drivers Salary (3 months ) Nos. 3 0
9 ICCC Setup Nos. 3 0 Workstation, Monitor and furniture, Tables , Chairs etc.
10 ICCC Supervisor +Coordinator Cost Months 3 0 One Supervisor, two coordinator
A)Total Cost for Pilot Phase 0
B) Complete Deployment Phase (2 months)
11 Manpower for development of 7 Use cases as per client requirement and ICCC Integration a. Unswept Roads b. Potholes on Roads c.Open Manholes d.Streetlight Malfunctions, etc e.Garbage f. Solid Waste g. Encroachment Months 2 0 Project Manager -1 Data Labeling and Preparation -2 AI/ML Developer-4 Data Scientist - 2 QA- 1 ICCC Integration Cost
12 Camaras and GPS module with complete set-up (Outdoor IP camera + GPS tracking for real-time data capture with memory card + Wifi set-up with automated video upload capability from Camera memory + Camera mount with Anti-Tampering & Anti-Theft Design Features) Nos. 16 0 Includes the installation and commissioning cost
13 E- Scooters & Connected hardware with Bradning Nos. 16 0 For field patrolling & verification by ground team
14 Drivers Salary (2 months ) Nos. 19 0 Earlier 3 Vehicle driver included
15 ICCC Supervisor + Coordinator Cost Months 2 0
B) Total cost for Completed Deployment Phase 0
(A+B) Total Capex cost for Pilot + Deployment Phase(3+2 Months) 0 #DIV/0! Capex %
C) O&M Phase (3 Years)
16 AMC of Cameras and GPS module for 19 vehicle Yrs 3 0
17 AMC of Product Application, Mobile Apps, Dashboard, anlaytics & AI Models Yrs 3 0 Support & Maintenance Team: 1 Application Support +1 AI/ML Engine + 1 QA
18 AMC of GPU Server Yrs 3 0
19 AMC of ICCC Hardware Yrs 3 0
20 E- Scooters Serving Yrs 2 0
21 Drivers Salary (19 Driver ) Months 36 0
22 ICCC Supervisor + Coordinator Yrs 3 0
23 Electricity Bill for 19 Scooties, RS. 10 per unit cost in urban & 1000 unit per month, charging & It's infrastructure provided by the SI and space provided for these infrastructure by Patna Nagar Nigam Yrs 3 0
24 Infrastructure cost for charging stations for 19 scooties with AMC Yrs 3 0
C) Total Opex Cost for a period of 3 years 0 #DIV/0! Opex %
(A+B+C ) Total Project cost (Capex + Opex) for a period of 3 years Including GST 0
**Please fill the yellow part only
**Please fill the BOQ so that Capex must be 51% of Total Project Cost and Opex must be 49% of Total Project cost **Please check Capex % & Opex % as per above
Patna Smart City Ltd.
Contact Details/Email
Patna Civic Services Monitoring Platform at ICCC, Smart City Patna
SL. No Item Unit Cost (Including GST) UoM Qty Total (Including GST) Remarks
A) Pilot Phase (3 months)
1 For AI-based detection, predictive alerts & civic service models for 03 use cases already developed a. Garbage b. Solid Waste c. Encroachment a. Unswept Roads b. Potholes on Roads c. Open Manholes d. Streetlight Malfunctions, etc. per use case 3 0
2 Manpower for development of 7 Use cases as per client requirement and ICCC Integration a. Unswept Roads b. Potholes on Roads c. Open Manholes d. Streetlight Malfunctions, etc. Months 3 0 Project Manager -1 Data Labeling and Preparation -2 AI/ML Developer-4 Data Scientist - 2 QA- 1 ICCC Integration Cost
3 Cameras and GPS module with complete set-up (Outdoor IP camera+GPS tracking for real-time data capture with memory card + Wifi set- up with automated video upload capability from Camera memory + Camera mount with Anti-Tampering &Anti-Theft Design Features) Nos. 3 0 Includes the installation and commissioning cost
4 Product Application License, Mobile Apps, Dashboards & related Integrations Lumsum 1 0 Software License, Product Application, Contractor mobile app, Admin Mobile app, ICCC integration
5 Additional GPU Server requirement Nos. 4 0 Includes the configuration & Deployment cost and one time warranty for 3 yrs
6 Training & Capacity Building Lumsum 1 0 Workshops & Sessions for min 20 officials
7 E-Scooters & Connected Hardware with Branding Nos. 3 0 for field patrolling & verification by ground team
8 Drivers Salary (3 months ) Nos. 3 0
9 ICCC Setup Nos. 3 0 Workstation, Monitor and furniture, Tables , Chairs etc.
10 ICCC Supervisor +Coordinator Cost Months 3 0 One Supervisor, two coordinator
A)Total Cost for Pilot Phase 0
B) Complete Deployment Phase (2 months)
11 Manpower for development of 7 Use cases as per client requirement and ICCC Integration a. Unswept Roads b. Potholes on Roads c.Open Manholes d.Streetlight Malfunctions, etc e.Garbage f. Solid Waste g. Encroachment Months 2 0 Project Manager -1 Data Labeling and Preparation -2 AI/ML Developer-4 Data Scientist - 2 QA- 1 ICCC Integration Cost
12 Camaras and GPS module with complete set-up (Outdoor IP camera + GPS tracking for real-time data capture with memory card + Wifi set-up with automated video upload capability from Camera memory + Camera mount with Anti-Tampering & Anti-Theft Design Features) Nos. 16 0 Includes the installation and commissioning cost
13 E- Scooters & Connected hardware with Bradning Nos. 16 0 For field patrolling & verification by ground team
14 Drivers Salary (2 months ) Nos. 19 0 Earlier 3 Vehicle driver included
15 ICCC Supervisor + Coordinator Cost Months 2 0
B) Total cost for Completed Deployment Phase 0
(A+B) Total Capex cost for Pilot + Deployment Phase(3+2 Months) 0 #DIV/0! Capex %
C) O&M Phase (3 Years)
16 AMC of Cameras and GPS module for 19 vehicle Yrs 3 0
17 AMC of Product Application, Mobile Apps, Dashboard, anlaytics & AI Models Yrs 3 0 Support & Maintenance Team: 1 Application Support +1 AI/ML Engine + 1 QA
18 AMC of GPU Server Yrs 3 0
19 AMC of ICCC Hardware Yrs 3 0
20 E- Scooters Serving Yrs 2 0
21 Drivers Salary (19 Driver ) Months 36 0
22 ICCC Supervisor + Coordinator Yrs 3 0
23 Electricity Bill for 19 Scooties, RS. 10 per unit cost in urban & 1000 unit per month, charging & It's infrastructure provided by the SI and space provided for these infrastructure by Patna Nagar Nigam Yrs 3 0
24 Infrastructure cost for charging stations for 19 scooties with AMC Yrs 3 0
C) Total Opex Cost for a period of 3 years 0 #DIV/0! Opex %
(A+B+C ) Total Project cost (Capex + Opex) for a period of 3 years Including GST 0
**Please fill the yellow part only
**Please fill the BOQ so that Capex must be 51% of Total Project Cost and Opex must be 49% of Total Project cost **Please check Capex % & Opex % as per above
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
RFP Nager Netra.pdf
NIT • 1.17 MB
BOQ of Nagar netra.xlsx
NIT • 0.01 MB
RFP Nager Netra-2.pdf
NIT • 1.17 MB
BOQ of Nagar netra-2.xlsx
NIT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].