Loading…
Loading…
Tender Value
₹3.9 Cr
EMD Value
₹7.7 L
Closing Date
24 Jul 2026, 11:00 am
Hubballi Division-Miscellaneous annual maintenance activites for Deshpande Nagar, Rail Nagar colony, New Vidyaranyanagar Colony, Devargudihal, Obalapur and all water supply system under SSE/W/WW/UBL in ADEN/UBL Section. (Special work-10/A)
13UBL26-27DT230626ITEM04
13UBL26-27DT230626ITEM04
Open
12 Months
Dharwad, Karnataka
₹0
₹7.7 L
29 Jun 2026
29 Jun 2026
10 Jul 2026
Item Breakup - B-SCH-B
"Maintenance , repair / replacement in Per each 624.00 respect of 1) Masonry works - brick work, Team/day concreting,grouting, plastering, pointing, flooring / dado work, Open drainage works, roof leakages etc. 2) Carpentry works - Wood work, doors & windows,cup boards, frames, shutters fittings & fastenings,rafters, reapers, wooden furnitures, roof sheeting etc.3) Plumbing works- Day to day maintenance and repair works in Plumbing related. By supplying multi skilled team. Each team of Multi skilled man comprises of 2 members of mason or carpenter or plumber or combination as per requirement with all Contractors tools, transportation, lead & lift,equipment's & scaffolding arrangements, safety equipment, maintenance of tools & other equipments etc. Material required for repair / replacement / other petty repair works will be supplied by the Railway at free of cost at work spot and as decided by Engineer in charge. The rate is for any one team of multi skilled members. Note: 1) Each member of team should report to SSE/Works - In charge on or before 9hrs on required working days as required by Railways 2) The Contractor should attend the maintenance, repair / replacement works with number of labour specified - one team of 2 nos for each category of work as directed by the Engineer in charge 3) A day to day register shall be maintained for this purpose and the same should be produced to the SSE/Works - In charge when ever required and produced the same for making payment 4) If any complaint / deficiency noticed in the working of the labourer, they should replaced with new person as per the direction of the Engineer in charge,. 5 ) Two times maintenance cost (per team / per day) will be imposed as penalty for the deficiency in working by the contractor's labour 6) The contractor should comply with existing laws and acts of Govt. of India and State Govt. Law and acts in engagement and working with labour 7) Mobile phone communication facility should be provided by the contractor to the each team for communication with departmental officials for instructions." Total 1378971.36
Item Breakup - D-SCH-D
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocumentlatestUpdatever6.1.pdf Tender Document
ATTACHMENT
IRGCCApril2022newasperACS.pdf
ATTACHMENT
JPOCirculardated22.05.2024.pdf
ATTACHMENT
NEFTFORM.pdf
ATTACHMENT
AnnexureVGCCcorrespondence.pdf
ATTACHMENT
ACSItoXI_compressed.pdf
ATTACHMENT
BGverificationletter_compressed.pdf
ATTACHMENT
TenderDocumentlatestUpdatever6.1.pdf
ATTACHMENT
Download all tender documents and submit your bid