Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.1 L+₹545.39 (0.51%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.1 L+₹1,855.41 (1.73%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹3,000
Closing Date
21 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O LAVATORY POINT MASJID SHAREEF SHEIKHPORA BLOCK QAZIGUND
2026_RDPR_315915_144
ENIT63of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,000
24 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by way of removing of dumped garbage cutting of trees /vegetation , and other obst. By labours (sub to actual). | - | No. | - | - |
| 0.0 | Earthwork in excavation by manual means in trenches for foundations et,disposed earth to be levelled and neatly dressed. | - | Cum | - | - |
| 0.0 | Providing and laying of stone soling tightly hand packed by tamping incl. all carriages. | - | cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates. | - | cum | - | - |
| 0.0 | Formwork incl. Centring ,strutting, propping etc. and removal of formwork (PCC). | - | Sqm | - | - |
| 0.0 | Formwork incl. Centring ,strutting, propping etc. and removal of formwork (RCC) | 1 | Sqm | - | - |
| 0.0 | Brick work with common burnt clay F.P.S.(non-modular) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 including Extra for brick work in superstructure above plinth level upto floor V level. | - | cum | - | - |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including use of vibrator -All work upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)- | - | cum | - | - |
| 0.0 | Reinforcement for RCC work including straightening, bending, cutting,placing in position and binding all complete, M S deformed bars. | - | Kg | 1 | - |
| 0.0 | 12 mm thick cement plaster in 1:6 mix of mortar | - | Sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1028456.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .