Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC H NO 399 OXELBERG DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | ₹12.7 L | L1 | Accepted-AOC AOC Awarded |
| 2 | L2₹12.7 LRejected-Finance H NO 264 1 WARD NO 03 DEULWADA PALIEM PERNEM GOA | ₹12.7 L | L2 | Rejected-Finance Rejected |
Tender Value
₹12.1 L
EMD Value
₹24,202
Closing Date
19 Jun 2026, 3:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti, Panaji - Goa
Construction of Sabha Mandap of Shree Ghagreshwar Devasthan at Colvale, V.P. Colvale in Colvale Z.P. Constituency. (Re-tender)
2026_ZP_29731_1
NGZP/02/2026-27/38/218/L11
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹24,202
6 Aug 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
19 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : (b) All types of ordinary rock including all types of laterite rock, blasting prohibated | 51.73 | cu.m | 639 | ₹33,055.47 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 25.14 | cu.m | 2,211 | ₹55,584.54 |
| 3 | Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: upto Plinth | 12.57 | cu.m | 6,325 | ₹79,505.25 |
| 4 | Refilling in plinth under floors, trenches including watering ramming consolidating, dressing, complete.-b) Moorum | 14.24 | cu.m | 245 | ₹3,488.8 |
| 5Centering and shuttering including strutting , proping etc. and removal of form for : | |||||
| 5.01 | (i)Foundations, Footings, Bases for columns | 8.32 | sq.m | 407 | ₹3,386.24 |
| 5.02 | (iii)Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan) | 48.38 | sq.m | 598 | ₹28,931.24 |
| 5.03 | (iv) Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth- FOR beams(0.23X0.5) | 48.41 | sq.m | 412 | ₹19,944.92 |
| 6 | Centering & shuttering including Strutting, Propping & removal of forms for sloping or battering surface (slabs, beams, louvers, etc) including folded plates | 55.29 | sq.m | 805 | ₹44,508.45 |
| 7REINFORCED CEMENT CONCRETE WORKS | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_30155.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].