| 1 | 1₹17.6 LAccepted-AOC | ₹17.6 L | 1 | Accepted-AOC WORKORDER |
| 2 | 2₹17.6 LRejected-Finance | ₹17.6 L | 2 | Rejected-Finance L2 |
Tender Value
₹18.8 L
EMD Value
₹18,800
Closing Date
20 Jun 2025, 3:30 pmClosed
Block Development Officer (B.P), Tiruchengode
Block Development Office ,Tiruchengode
Construction of Single calss Room New School Building at Chithalandur PUES H/o Chithalandur in Tiruchengode Block at Namakkal District under CFSIDS - 2025 - 2026 TGD-02
2025_RDTN_568412_2
4474/2024/A2
Open Tender
Civil Works - Buildings
Item Rate
180 days
Tiruchengode
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,800
30 Jun 2025
13 Jun 2025
20 Jun 2025
13 Jun 2025
20 Jun 2025
13 Jun 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Refilling with excavated earth as per standard specifications etc complete
Cement Concrete in 1 : 4: 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Cement Concrete in 1 : 2: 4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Brick work in cement mortar 1:5 mix using Fly ash bricks 230 x 110 x 70mm and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Centering below Ground level
Above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and applying of Two coats of Putty of 3mm thick over the exposed surface of ceiling finishing the joints smoothy with grinding machine and the surface including all charges
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc.,
Providing granolethic floor finish ISS metal to 25mm thick including cost and conveyance of all materials to site
Weathering coarse with Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for 10 cum
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Black Board Paint Two Coats with Approved Cement Paint over Cement Plastered surface including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm. - NEW WORK
Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete
Supply of steel doors and windows including cost and convyance and all charges etc complete.etc complete
Steel Door 1.20 X 2.40m
Window 1.20 X 1.60m
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary
Supply and Fixing rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,
Eletrical Work
Light & Fan Point SD.no.25
Supply&Fixing of Tube Light SD.no.88
CFL SD.no.80
Supply&Fixing of Street light SD No.94
Supply & Fixing of Fan SD.no.106
Power Plug Point SD.no.39
Service Connection SD.no.68
TNEB meter Board SD.no.125
25mm dia GI pipe (Class 'B') SD.no.70
Chappal Rack
Brick work in CM 1:5 mix using Fly Ash bricks bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
labour charges for fixing cuddapah slab 38 to 40mm for shelfs etc., all complete
Student Cupboard
Brick work in CM 1:5 mix using Fly Ash bricks bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Teacher Cupboard
Brick work in CM 1:5 mix using Fly Ash bricks bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary
Provision Lock & Key
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Modern Infrastructure (BID ID -1372725)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].