| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | ₹3.6 Cr | L1 | Accepted-AOC Being the lowest tenderer (L1) and reasonable |
| 2 | L2₹4.2 Cr+₹60.3 L (16.8%)Rejected-Finance | ₹4.2 Cr+₹60.3 L (16.8%) | L2 | Rejected-Finance Not being the lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not enlisted in one of the eligible category d(iv) |
Tender Value
Refer Docs
EMD Value
₹4.8 L
Closing Date
29 Jul 2021, 6:00 pmClosed
Cheif Engineer (Navy) Mumbai
HQ CE (Navy) Mumbai, 26 Assaye Building, Colaba, Mumbai - 400005
ADDITION AND ALTERATION OF EXISTING WATER SUPPLY DISTRIBUTION SYSTEM AT KARANJA
2020_MES_394067_2
87879/E8
Open Tender
Civil Works - Others
Item Rate
365 days
GE (P) (NW) Karanja
As per Tender documents
8 documents required · 8 mandatory
₹2,000
GE (NW) Karanja
₹4.8 L
Yes
22 Sept 2021
7 Apr 2021
31 Jul 2021
7 Apr 2021
29 Jul 2021
8 Jul 2021
Amount
T/D Mechanical Level Indicator and Sensor from OHT/UG Sump
T/D Discrete Electronic Level Indicator and Sensor from OHT/UG Sump
T/D Old unserviceable Single phase Preventer from Pump houses
T/D Old unserviceable sluice valve of size 50 mm dia
T/D Old unserviceable sluice valve of size 80mm dia
T/D Old unserviceable sluice valve of size 100mm dia
-ditto- as per item above but for 150mm dia
-ditto- as per item above but for 200mm dia
-ditto- as per item above but for 300mm dia
Supply, Installation, Testing and Commissioning of Operator/Client Stations with the following specifications (1) Intel 7th Gen Core i5, 16 GB DDR4 RAM, 2 TB SATA Hard Disk Drive, Window latest version / as per recommendation of the SCADA software manufacturer (2) 4 USB 2.0, 1 GB Ethernet, 1 HDMI, 1 VGA, (3)23 inch monitor, keyboard, mouse , anti virus software (4) MS Office Pro (5) New wired broad band internet connection along with static IP on the Personal computer including all expenses for communication, internet charges for 12 months after the certified date of completion. Make : Dell, HP, Lenovo
Supply, Installation, Testing and Commissioning of 65 inch LED monitor Power: AC 100 - 240 V~ (+/- 10 %), 50/60 H Resolution: UHD (3840 x 2160) Operating temperature: 0 - 40 deg centigrade Humidity: 10-80% Built in Speakers Ports: HDMI 2.0, USB 2.0 x 2 Make NEC, Samsung, Panasonic, LG.
Supply, Installation, Testing and Commissioning of Ethernet Switch 24 port GBPS layer 2 manageable switch Make Cisco, HP, Dlink
Supply, Installation, Testing and Commissioning of Firewall Router with minimum 2 WAN ports and 4 LAN ports 4 10/1000 RJ-45 ports, 2 10/1000 RJ-45 Internet port, Make Cisco, HP, Dlink
Supply, Installation, Testing and Commissioning of UPS 2KVA with suitable batteries for 1 hour back up, I/p Voltage 160-280V, I/P Frequency 46-55 Hz, O/p Voltage 220-230V, O/p frequency including suitable powders coated sheet metal rack for batteries, if required Make: Luminous/APC/Numeric
Supply, Installation, Testing and Commissioning of A4 size Mono chrome LaserJet Printer. Input Voltage: 110 to 127 VAC(+/- 10%) Connectivity: USB Speed: up to 14ppm (Black, A4) Make Canon, Epson, HP
Supply, Installation, Testing and Commissioning of SCADA Development using runtime license with unlimited tags to be installed and deployed on the computer under Sr. Item No.10 SCADA (SUPERISORY CONTROL AND DATA AQUISITION) software with a. Unlimited tags in Engineering control station including programming for graphical display for the monitoring/control of various Water supply Pump Houses. (a) Status of Level Sensors, Motorised Valves, (b) Energy Parameters of Pumps (c) Pressure Transmitters status, (d) Flowmeter Data etc. as per the requirement of Engineer in charge, b. Daily report generation, c. Alarm report generation, d. On line user defined trending, recipes, reports etc. in formats as required by the Engineer in charge. Make Rockwell Automation, Mitsubishi, GE Fanuc, Siemens
Supply, Installation, Testing and Commissioning of a suitable OPC server for unlimited tags with MODBUS TCP/equivalent driver having an IOT gateway to exchange data between the PLC based panels and the SCADA system Make: Kepware, Matrikon, Revolution Infosystems,
Supply, Installation, Testing and Commissioning of IOT Gateway to be able send the OPC data to a broker on the central server using the latest MQTT protocol working on a Publish Subscribe Model. The IOT gateway shall be able to support 5000 tags. Make Kepware , Matrikon, Revolution Infosystems,
Supply, Installation, Testing and Commissioning of MQTT broker at the central server to service publish and subscribe requests from the OPC server and the web clients Make : Hive, Mosquito, Eclipse, Revolution Infosystems, Kepware
Supply, Installation, Testing and Commissioning of Apps for Android Operating Systems along with the design and development of APIs at server side using JAVA / dotnet technologies to provide data to Android and IOS apps required development to fetch and display data like (a) Status of Level Sensors, Motorised Valves, Level Sensors (b) Energy Parameters of Pumps (c) Pressure Transducers (d) Flowmeter Data etc. as per the requirement of Engineer in charge With login and password facility and a minimum of 80 screens and having 25 concurrent licenses. Make Siemens, Rockwell Automation, Mitsubishi, GE Fanuc, Revolutions Infosystems
Supply, Installation, Testing and Commissioning of HTML Application connected to the SCADA server having the following features i) 25 client licenses ii) Monitoring Platform in boot strap to create representation of existing infrastructure iii) JavaScript code to subscribe and publish to the MQTT broker at the server iv) Parse the response and display the data using HTML,CSS, Bootstrap v) Create online graphical trends . vi) Create database and use the database to create historical trends, dashboards and reports
Supply, Installation, Testing and Commissioning of Google Earth Interface including the following a) Design and development of KML/KMZ files on Google earth platform clearly marking the locations of all the Pump houses, Buildings, tanks and outdoor valves etc., which shall be visible to only those who are authorised to view the KML files. b) Design and development of HTML code to display important parameters like Pump Type, Mtr, valve size, attach image etc. of each element c) Design and development of Web service in Dotnet/Java/Php at the main server to link to the Scada Database. d) Display the live status of elements by calling the web service through html code associated with each location. e) Authentication/sharing access to be granted by the admin of the system
Supply, Installation, Testing and Commissioning of Rack Mountable Web Smart Switch with 8 Ports and 2 SFP Port and following specifications i) Number of Ports 8 × 10/100/1000T Ports, 2 × Combo Ports (2 × 10/100/1000T-100/1000FX Ports) ii) Port Standards & Functions : 8 RJ-45 Auto-Negotiating 10/100/1000 ports (IEEE 802.3 Type 10BASE-T, IEEE 802.3u Type 100BASE-TX, IEEE 802.3ab Type 1000BASE-T) 2 SFP 100/1000 Mbps slots (IEEE 802.3u Type 100BASE-FX, IEEE 802.3z Type 1000BASE-X Supports a maximum of 8 autosensing 10/100/1000 ports plus 2 SFP 100/1000 slots. Fiber port LEDs; Copper port LEDs; Power LED. IEEE 802.1p/Q VLAN tagging. Spanning Tree Protocol : STP, RSTP, and MSTP Make : Siemens, Cisco, HP
Supply, Installation, Testing and Commissioning of Hot pluggable 1310 nm multimode/Single mode SFP (mini-GBIC) transceiver, supporting full duplex, Gigabit speeds on multimode/Single mode fiber for distances of up to 550m/550m/10km on 62.5µm/50µm/9µm respectively in a metal housing to reduce EMI and to increase durability Make : Dlink, Ubiquiti, Cisco, Siemens
Supply, Installation, Testing and Commissioning of Rack Mountable LIU with the following specifications (1) Rack Mountable 12 Port Unloaded LIU (a) Aluminum Base Material (b) Slim 1 U mounting height (c) Metal Shelf Aluminum 1.2 mm thick (d) Splice tray Aluminum 0.6mm (e) Winding Panel – Plastic (f) Cable Plug – Rubber for minimum 2 cable entries (g) Adaptor Panel Aluminum 1.5 mm thick (h) 2 fiber spools built in for 900 um tight buffered fiber storing (i) Capable of storing up to 3 mts of 900 um tight buffered fiber per adaptor Make : Dlink, Ubiquiti, Cisco
Supply, Installation, Testing and Commissioning of SC-LC Duplex SM Patch Cord 0.9 mm dia of suitable length (a) Size 0.9mm dia (b) Insertion Loss <=0.2 db, max 0.3 db (c) Return Loss PC>=45dB, UPC>=50dB, APC>=60dB (d) Connector Ferrule Ceramic (e) Apex Offset <50um (f) Fiber Height +-100nm (g) End Face Radius of Curvature 7mm<R<25mm (h) Repeatability <=0.2 dB 1,000 times mating cycles (i) Working Temp -40deg C to +85 deg C Make : Dlink, Ubiquiti, Cisco
Supply, Installation, Testing and Commissioning of SC Simplex Coupler/Adaptor (a) Insertion Loss <=0.2 dB for Zirconia Sleeve (b) Sleeve/Ferrule With drawl Force 2.0N to 5.9N Make : Dlink, Ubiquiti, Cisco
Supply, Installation, Testing and Commissioning of Adaptor Panel (a) 6 port adaptor Panel for SC Adaptors Make : Dlink, Ubiquiti, Cisco
Supply, Installation, Testing and Commissioning of SC-SM-Simplex Pigtail of suitable length (a) Insertion Loss <=0.2 db, max 0.3 db (b) Return Loss PC>=45dB, UPC>=50dB, APC>=60dB (c) Connector Ferrule Ceramic (d) Apex Offset <50um (e) Fiber Height +-100nm (f) End Face Radius of Curvature 7mm<R<25mm (g) Repeatability <=0.2 dB 1,000 times mating cycles (h) Working Temp -40deg C to +85 deg C Make : Dlink, Ubiquiti, Cisco
Supply, Installation, Testing and Commissioning of CAT6 UTP 24 AWG Patch Cord of 2m length, Plug 30U snag less Make : Dlink, Finolex
Supply, Installation, Testing and Commissioning of armored CAT 6 UTP cable on walls Make : D Link, Finolex, Polycab
Supply, Installation, Testing and Commissioning of OFC Cable to be pulled over head and duly fastened/attached to a PVC coated messenger wire / stay wire of gauge either with the required clamps of suitable size not more than 3 feet apart or with a web between the OFC and messenger wire along with endplates at both ends of the suspended cable i) 6F Single mode OFC suitable for outdoor networking applications (1) 6 Fibers type single mode, wavelength 1310, Attenuation 0.38/km (2) Outer jacket of HDPE sheath (3) Jelly Filled Core (4) Wrapped with Corrugated Steel Tape (5) Armored with a pair of Steel Wire for rigidity (6) Anti Termite and rodent repellent (7) Water Proof and moisture resistant Make Finolex, Dlink, Polycab
Supply, Installation, Testing and Commissioning of 6F Single mode OFC suitable for outdoor networking applications to be fixed on wall / laid in ground drawn through and including PLP ( Permanently Lubricant High density Polyethylene ) laying on PLB HDPE Duct with following specifications:- (a) Outside dia - 40mm + 0.4mm (b) Wall thickness - 3.5mm ( + 0.2mm / 0.00mm) (c) Thickness of permanent lubricant more than 0.4mm splicing and terminating as specified. (1) 6 Fibers type single mode, wavelength 1310, Attenuation 0.38/km (2) Outer jacket of HDPE sheath (3) Jelly Filled Core (4) Wrapped with Corrugated Steel Tape (5) Armored with a pair of Steel Wire for rigidity (6) Anti Termite and rodent repellent (7) Water Proof and moisture resistant Make Finolex, Dlink Make of HDPE duct: ANEK / APPOLO / SWASTIK
Supply, Installation, Testing and Commissioning of Email and SMS Utility. The Central Server shall have an Email and SMS Server which shall send out email and SMS to concerned officers in case of certain events or alarm conditions. It shall be user configurable on the following counts User Name and Password protected Connectivity to Database generated by the SCADA Configuration of Email Ids and Phone numbers of recipients Conditions like alarms and events to be user defined There shall be no limit to the number of recipients
Supply, Installation, Testing and Commissioning of Reporting Software with the following features The reporting software shall be User and Password protected It shall have an admin panel to configure the users, databases, tags and report types. The user shall be able to print reports which are configured by the administrator. The user shall be able to choose the time range for the reports The reports shall have the User logo, name of the user and the time and date when the report was fired. The report shall be available in crystal report and excel format
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 05 Nos. Pumps, 03 nos. vacuum pumps, 02 Nos. Ultrasonic level sensor, 04 Nos. Pressure transmitters, 05 Nos. priming motorised valves, 06 Nos. Magnetic Sensors, 19 Nos. Motorised valves (+02 Nos additional Provision)=21 Nos. Motorised valves and 01 No. Flow meter. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/L&T) (ii) 01 No. PLC with following specifications; a). 134 nos Digital inputs / Outputs and 10 Nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 no. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01 No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 10 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY)
Supply, Installation Testing & Commissioning of Outdoor type Programmable Logic Controller based Valve Automation and communication Panel suitable for control and monitoring of 02 Nos. Ultrasonic level sensors and 03 Nos. Motorised valves (+01 Nos additional Provision)=04 Nos. motorised valves. The panel should be of suitable size fabricated from 3.0 mm thick CRCA sheet and properly powder coated. The Panel should have the following features: (a) Water Level Sensing & Display (b) Automatic Operation of Motor Actuated Valves. The Panel should comprise the following items:- The PLC based Panel shall consist of the following sub systems (i) 01 no. PLC with following specifications; a. 18 nos Digital inputs / outputs and 02 Analogue inputs. (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b. 4 serial ports supporting open communication protocol Ethernet port access. c. Programming software based on IEC to facilitate building of custom built function blocks d. Expandable up to 192 DI / DOs (iii) 01 no. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (iv) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Valve Automation and communication Panel suitable for control and/or monitoring of 02 Nos. Pumps, 01 No Ultrasonic level sensor, 02 Nos. Pressure transmitters, 02 Nos. Priming motorised Valves, 02 Nos. air release Solenoid Valves, 05 Nos. Motorised valves (+01 Nos additional Provision)=06 Nos. motorised valves and 03 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated. The Panel should have the following features: a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps & valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/ SELEC/L&T) (ii) 01 No. PLC with following specifications; a). 46 nos. Digital inputs / outputs and 04 Nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 no. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01 No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 08 Nos Pumps.(+01 additional Provision) =09 Nos. Pumps, 02 Nos Vacuum Pumps.(+02 additional Provision) =04 nos. vacuum pumps, 04 Nos Ultrasonic level sensor (+03 additional Provision) = 07 No Ultrasonic level sensor, 08 Nos. Pressure transmitters .(+01 additional Provision) = 09 Nos. Pressure transmitters, 03 Nos. Priming motorised Valves (+01 additional Provision)=09 Nos. Priming motorised Valves and 15 Nos. Motorised valves (+17 Nos additional Provision)=32 Nos. motorised valves. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC /L&T) (ii) 01 with following specifications; a).156 Nos. Digital inputs / outputs and 12 Nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 no. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01 No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 10 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC) (viii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement (Make: SCHNEIDER / ESBEE)
Supply, Installation Testing & Commissioning of Outdoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 02 Nos. Pumps, 02 No Ultrasonic level sensor, 02 Nos. Pressure transmitters, 02 Nos. Priming motorised Valves, 02 Nos. Solenoid Valves, 08 Nos. Motorised valves (+07 Nos additional Provision) =15 valves and 03 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 3.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 04 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/L&T) (ii) 01 with following specifications; a). 104 inputs / outputs and 04 nos. analog inputs. (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC) (viii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement (Make: SCHNEIDER / ESBEE)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 02 Nos. Pumps, 01 No Ultrasonic level sensor, 02 Nos. Pressure transmitters, 02 Nos. Priming motorised Valves, 02 Nos. Solenoid Valves, 08 Nos. Motorised valves (+01 Nos additional Provision)=09 valves and 15 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 04 meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/L&T) (ii) 01 with following specifications; a) 70 inputs / outputs and 04 nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 04 Nos. Pumps, 02 No Ultrasonic level sensor, 04 Nos. Pressure transmitters, 04 Nos. Priming motorised Valves, 04 Nos. Solenoid Valves, 04 Nos. Motorised valves (+11 Nos additional Provision) = 15 valves and 30 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/L&T) (ii) 01 with following specifications; a). 142 inputs / outputs and 04 nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 02 Nos. Pumps, 01 No Ultrasonic level sensor, 02 Nos. Pressure transmitters, 02 Nos. Priming motorised Valves, 02 Nos. Solenoid Valves, 05 Nos. Motorised valves (+01 Nos additional Provision) = 06 Nos. motorised valves and 09 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/ L&T) (ii) 01 with following specifications; a). 54 inputs / outputs and 04 nos. analog inputs b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC) (viii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement (Make: SCHNEIDER / ESBEE)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 04 Nos. Pumps, 01 No Ultrasonic level sensor, 04 Nos. Pressure transmitters, 04 Nos. Priming motorised Valves, 04 Nos. Solenoid Valves, 07 Nos. Motorised valves (+01 Nos additional Provision) = 08 Nos. Motorised valves and 03 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/ L&T) (ii) 01 with following specifications; a). 102 inputs / outputs and 04 nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC) (viii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement (Make: SCHNEIDER / ESBEE)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 02 Nos. Pumps, 03 No Ultrasonic level sensor, 02 Nos. Pressure transmitters, 02 Nos. Priming motorised Valves, 02 Nos. Solenoid Valves, 05 Nos. Motorised valves (+07 Nos additional Provision) = 12 Nos. Motorised valves and 03 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/ L&T) (ii) 01 with following specifications; a). 68 inputs / outputs and 06 nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC) (viii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement (Make: SCHNEIDER / ESBEE)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 02 Nos. Pumps, 03 No Ultrasonic level sensor, 02 Nos. Pressure transmitters, 02 Nos. Priming motorised Valves, 02 Nos. Solenoid Valves, 05 Nos. Motorised valves (+07 Nos additional Provision) = 12 Nos. Motorised valves and 03 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 02 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/ L&T) (ii) 01 with following specifications; a). 68 inputs / outputs and 06 nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC) (viii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement (Make: SCHNEIDER / ESBEE)
Supply, Installation Testing & Commissioning of Indoor type Programmable Logic Controller based Pump and Valve Automation, Protection and communication Panel suitable for control and/or monitoring of 03 Nos. Pumps, 01 No Ultrasonic level sensor, 03 Nos. Pressure transmitters, 03 Nos. Priming motorised Valves, 03 Nos. Solenoid Valves, 08 Nos. Motorised valves (+02 Nos additional Provision) = 10 Nos. motorised valves and 03 Nos. Magnetic Sensors. The panel should be of suitable size fabricated from 2.0 mm thick CRCA sheet and properly powder coated with angle iron supports. The Panel should comprise the following items: (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation (all pumps &valves connected to the PLC based Control Panel)
The PLC based Panel shall consist of the following sub systems (i) 03 Nos. Energy meters with inbuilt mod bus communication port (Make: RISHABH/CONZERVE/SELEC/ L&T) (ii) 01 with following specifications; a). 48 inputs / outputs and 04 nos. analog inputs (PLC Make: Mitsubishi/GE Fanuc/Siemens/Rockwell) b). 4 serial ports supporting open communication protocol, 01 No. Ethernet port c). Programming software based on IEC to facilitate building of custom built function blocks d). Expandable up to 192 DI / DOs (iii) 01No. HMI - 7" (min) Graphical Touch screen multicolor having following minimum features a).02 Nos. serial ports and 01 No. USB port b). Floating Point support c). Built in RTC d). Bar Graph and image (bmp, jpeg files) e). Real time and historical Trending, f). Real time and historical alarms, (iv) 01 No. SMPS of 5 A rating (Make: TELEMECANIQUE / NHP) (v) Suitable no. of interposing relays 24 V D.C. coil rating, 4 pole and 2 A contact rating (Make: OEN / OMRON / IDEC / ALLEN BRADLEY) (vi) MCB of rating 10A (Make: Havells/ Schneider) (vii) Single Phase Preventer (Make: MINILEC) (viii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement (Make: SCHNEIDER / ESBEE)
Make of Control Panel: Any PLC based Panel manufacturer with proven track record of having supplied a minimum of 50 (total) PLC based Panels with dual SIM card based GPRS and OFC communication (in the same Panel) in Govt organisations in the last 24 months. Contractor shall produce documentary evidence in the form of performance certificate from an officer of rank not less than Executive Engineer or equivalent confirming the above condition. CPRI approval is mandatory for the panel box.
Supplying & erecting earth pit approved make as per IS 3043 made Copper Bonded rod: Copper coated steel earthing rod made from low carbon Steel & are molecularly coated with 99.9%pure copper. • Copper Bonded Rod help dissipating the leakage current to help any assets being damage from hazards the same. • Copper layer is very helpful in extreme soil conditions such as excessive salt moisture content. where the copper provides superior corrosion resistance and ordinary long life Specifications: Shape - solid round Conductor Size length (mm) - 3000 mm Coating Thickness (micron)- 254 micron Rod Diameter (mm)- 17.2 mm, Purity (%) -99.9 % Number Of Holes - 2 Terminal Hole Size (mm)-15 mm Thread Size (inch) -2 inch Material- Copper bonded Earthing Powder the ERIC Backfill by Compound has elements that help in retaining moisture, reducing soil resistivity and dissipation of fault current. Owing to its hygroscopic nature, the ERIC Backfill Compound swells whenever it comes in contact with water. The ERIC Backfill Compound is known for establishing consistent contacts between soil and electrode surface. The ERIC Backfill Compound is suited for all soil conditions. Special Characteristics of Eric Backfill Compound-
• Positive low resistance electrical connection to earth • Does not contain any hazardous chemicals • Suitable for any kind of soil • Environmentally friendly • Never needs recharging • Offers a stable grounding system • Non corrosive • Reduce soil resistivity • Retain moisture for a long time Product Details: Quantity 50 Kg Usage Industrial Expansion Chemicals Expands 18 to 20 times and removes entrapped air Feature Environmentally safe Leveraging upon our technologically-advanced production facility, we have been able to manufacture, import, trade, export, and supply a qualitative range of Earthing Compound. The offered backfill compound is excellently processed in compliance with market specified standards under the direction of competent experts. We acquire material from consistent vendors to process the offered backfill compound. Apart from this, our expert team of quality controllers tests the whole range of backfill compounds to ensure their quality from our end. Features: • Artificial Treatment Compound • Environmentally safe • Highly hygroscopic Other Details: Artificial Treatment Compound • High corrosion resistance Enhances the life of earth electrode • Highly hygroscopic Mixes homogeneously with soil and one set stable for life • Environments Friendly • Saved Equipment form ground faults • pH Neutral & corrosion inhibitors enhances the life of the electrode • Maintenance free No periodic charging/ treatment / replacement required • Environmentally safe Does not contain any hazardous chemicals • Application suitable for vertical and horizontal strip electrode installations Make: Remedies/Ashlok/U Protect
Note: 1.The quoted rates shall be deemed to include all necessary switchgear/relays etc. to operate the connected motorised valves in automatic / manual mode. 2. The quoted rates shall be deemed to include all necessary switchgear/relays to operate all pumps in manual mode from the respective PLC based panels. 3. PLC and HMI shall be provided with conformal coating on internal components for protection against effects of coastal area. 4. PLC based Panels shall be provided with suitable cooling fan and tube light. 5. PLC Panels designed such that all OFC accessories as required for OFC communication shall be installed in the Panel / Panel stand. 6. All PLC Panels shall have 10% extra digital Inputs / Outputs prewired in the Panel as spares / future expansion. 7. Communication protocol shall be such that the primary mode of communication between the Panel and the SCADA system shall be OFc and the standby / secondary mode shall be GPRS.
Supply, Installation Testing & Commissioning of pressure Transmitter with following specification including necessary power pack for supply of DC : Power supply: 10-36 V DC Process connection: G ½ “ Enclosure: whether proof IP 65 Process temperature: -30 to 120 Celsius Accuracy: 0.25 % Make: Danfoss / Siemens / E & H
Supply, Installation Testing & Commissioning of motor actuated ball valve suitable for 25mm GI pipe for priming of pump including all necessary GI fittings with following specifications: Size: 25 mm Pressure rating: 10 kg / sq. cm. Make: AVCON/ ROTEX/ ASCO/JOHNSON CONTROL/ RITETORK
Supply, Installation Testing & Commissioning of direct acting type release solenoid valve for air release during priming; with following specifications : Size: 10 mm Pressure rating: 10 kg / sq. cm. Type: Normally closed Make: AVCON/ ROTEX/ ASCO/JOHNSON CONTROL/ RITETORK
Supply, Installation, Testing & Commissioning of Motor Actuated Ball Valve consisting of suitable single phase Actuator and ball valve of size 50 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Material of Ball: Stainless Steel Limit Switches : 02 Nos. For open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting :Direct on valve Make: EMTORK / HASEL HOFENER / RITETORK
Supply, Installation Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 80 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting :Direct on valve Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation, Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 80 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting : Extended type SS rod made out of SS-304 with universal joint for installation 18 -24 inches above ground level with angle mounting including raising of existing chamber if required. Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 100 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting :Direct on valve Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation, Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 100 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting : Extended type SS rod made out of SS-304 with universal joint for installation 18 -24 inches above ground level with angle mounting including raising of existing chamber if required. Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 150 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting :Direct on valve Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation, Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 150 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting : Extended type SS rod made out of SS-304 with universal joint for installation 18 -24 inches above ground level with angle / channel mounting including raising of existing chamber if required. Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 200 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting :Direct on valve Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation, Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 200 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting : Extended type SS rod made out of SS-304 with universal joint for installation 18 -24 inches above ground level with angle mounting including raising of existing chamber if required. Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation, Testing & Commissioning of Motor Actuated Butterfly Valve made of SS-304, stem material SS-410, EPDM seat in butterfly valve consisting of Quarter turn single phase Actuator and Wafer type butterfly valve of size 300 mm dia with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure. Specifications & Features Input Voltage: 230 V, A.C. Designed line pressure: 10 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater In built blue tooth transceiver with capability of pairing with any android based smart phone to download logged data. Mounting : Extended type SS rod made out of SS-304 with universal joint for installation 18 -24 inches above ground level with angle mounting including raising of existing chamber if required. Make: EMTORK / HASEL HOFENER / RITETORK / SIEMENS / HONEYWELL / L&T / UNIVERSAL switchgear control
Supply, Installation, Testing and Commissioning of Float type Point Level Sensor with the following specifications; Type: Magnetic Magnet: Ring type Switch: Reed Switch (Epoxy sealed) Connecting Cable: Teflon Make: RECKTRONIC DEVICES AND SYSTEMS / TECHTROL / CRISTAL
Note for item No. 53 to 62: 1.The quoted rates shall be deemed to all installation accessories viz. MS flanges of suitable thickness, any CI / DI fittings as per site requirement, HT nuts & bolts, gland packing. 2. The quoted rates shall be deemed to include all necessary labour charges for excavation in soft / medium soil / hard rock / concrete up to a suitable depth for installation of the valves. 3. The quoted rate shall be deemed to include MS fabricated and powder coated spool / tail piece of suitable thickness and length. 4. The quoted rates shall deemed to include powder coated / polycarbonate / FRP environmental protection covers for all outdoor mounted actuators (not in chambers)
Supply, Installing, Testing and Commissioning of Ultrasonic Level Transmitter Range : 0-5 meters Accuracy : 0.5 % minimum Supply Voltage : 24V dc Output : 4-20 mA Ultrasonic Frequency:75 kHz burst, rep. rate 96 ms Delay at Power-up: 1.5 seconds Temperature Effect: Uncompensated: 0.2% of distance/°C &Compensated: 0.02% of distance/°C Delay at Power-up: 1.5 seconds Resolution: 1.0 mm Output Response Time: 100 ms to 2300 ms Minimum Window Size: 20 mm Environmental Rating: Leak proof design is rated IEC IP67; NEMA 6P Operating Conditions: Temperature: –20 °C to 70 °C (–4 °F to 158 °F) Maximum relative humidity: 100% Indicators Green Power On LED: Indicates power is ON Red Signal LED: Indicates target is within sensing range, and the condition of the received signal Teach/Output indicator (bicolor Amber/Red): Amber – Target is within taught limits; Flashing Amber – Target is outside taught window limits; Red – Sensor is in TEACH mode Makes: Endress+Hauser / Banner / Krohne Marshal / Siemens
Supply, Installation, Testing and Commissioning of Full Bore Electro magnetic Flow Meter with 4-20 mA output on Modbus, convertor and digital display along with Flow totaliser suitable for Line size of 400 mm dia. Flow Sensor:, Type: Pulse DC excitation, Electrode : SS 316/Ha-C, Electrode type: Round Head Electrodes Meter Tube: SS Liner: Hard Rubber, Accuracy : ±0.5 % of MV inclusive of linearity, Flow Transmitter / Converter :Type : Micro processor based & Modular, Display language : English, Display Two line back lit LCD for indication of actual flow rate, forward, reverse &sum totalizer., Output : One current output (4 – 20 mA),Enclosure: Die cast Al. with polyurethane finish, Power Supply : 240 V AC, 50 Hz, The work includes modification of pipeline including for installation of flow meter such that the section of pipeline in which the flow meter is installed is always full., Note: The Flow meter shall be calibrated at FCRI / any Laboratory accredited by NABL or equivalent Make: Ritmeyer/ Krohne Marshall/Siemens/ ABB
Supply & Fixing on wall or drawing through PVC Pipe 2 x 1.5 sq. mm PVC sheathed and PVC insulated, armored, FRLS, Copper cable multistranded. (Make: POLYCAB/FINOLEX/RR CABLE)
Supply & Fixing on wall or drawing through PVC Pipe 4 x 1.5 sq. mm PVC sheathed and PVC insulated, armored, FRLS, Copper cable multistranded. (Make: POLYCAB/FINOLEX/RR CABLE)
Supply & Fixing on wall or drawing through PVC Pipe 6 x 1.5 sq. mm PVC sheathed and PVC insulated, armored, FRLS, Copper cable multistranded. (Make: POLYCAB/FINOLEX/RR CABLE)
Supply & Fixing on wall or drawing through PVC Pipe 7 x 1.5 sq. mm PVC sheathed and PVC insulated, armored, FRLS, Copper cable multistranded. (Make: POLYCAB/FINOLEX/RR CABLE)
Supply & Fixing on wall or drawing through PVC Pipe 5 pair 0.5 sq. mm PVC sheathed and PVC insulated, armored, FRLS, Copper cable multistranded. (Make: POLYCAB/FINOLEX/RR CABLE)
Excavation in trenches not exceeding 1.5 Mtr wide and exc 1.5 Mtr in depth in soft /loose soil getting out and leveling of bottom surface to required level for laying all as specified.
Excavation in trenches not exceeding 1.5 Mtr wide and exc 1.5 Mtr in depth in hard/loose soil getting out and leveling of bottom surface to required level for laying all as specified.
Returning, filling, including spreading, leveling, watering and well ramming in layer not exceeding 25 cm thick after laying and testing of cable complete all as specified.
Removing of excavated material to a distance not exceeding 50 mtr and depositing where directed at level not exceeding 1.5 mtr above the starting point complete all as specified and as directed.
Supply/Fixing in repair/replacement of internal steel water tubing of dia 50mm, galvanised, light grade with all fittings in shafts such as nipple, union, socket, elbow, bends, fixed to wall / laid in ground including necessary fixing arrangement such as GI clamps, wooden shadle, Screws. as directed by Engr in Charge.
Construction of brick masonry valve chamber of size 1.2m x 1.2m x 1.2m (internal dimensions) (above GL 0.30m) suitable for fixing sluice valve, 15mm thick foundation using PCC 1:4:8 type D2 using 40mm graded stone aggregate over 15cm thick hard core of broken stone, 23cm thick brick walls built in CM (1:4), 15mm thick internal & external plaster finished even and smooth without using extra cement, 5mm thick MS cover plate on 50mm x 50mm x 6mm angle iron frame work embedded in PCC arrangement, hold fasts, suitable locking arrangement etc. applying one coat of red oxide primer & two coats of synthetic enamel paint on steel surfaces including earth work & excavation in any type of soil including disposal of debris outside MD land complete all as specified and directed by Engineer-in-Charge.
Construction of brick masonry valve chamber of size 1.0m x 1.0m x 1.0m (internal dimensions) (above GL 0.30m) suitable for fixing sluice valve, 15mm thick foundation using PCC 1:4:8 type D2 using 40mm graded stone aggregate over 15cm thick hard core of broken stone, 23cm thick brick walls built in CM (1:4), 15mm thick internal & external plaster finished even and smooth without using extra cement, 5mm thick MS cover plate on 50mm x 50mm x 6mm angle iron frame work embedded in PCC arrangement, hold fasts, suitable locking arrangement etc. applying one coat of red oxide primer & two coats of synthetic enamel paint on steel surfaces including earth work & excavation in any type of soil including disposal of debris outside MD land complete all as specified and directed by Engineer-in-Charge.
SITC of 3 Phase Vacuum Pumps as per below specifications: Flow: 20.4 m3/hr HP: 1 RPM: 2700 SIZ: 20/20 MM Make: KBL / Mather & Platt / Crompton Scope work includes all necessary accessories, foundation etc. as required
Cutttting the existing road for laying of cable under in pipe under roads, pavements and hard standing by excavation and making good after laying of cable all as specified and as directed by Engr-in-charge.
COMPREHENSIVE MAINTENANCE, MANNING AND OPERATION
Manning and operation of the SCADA based centralised monitoring and control water supply pumping and distribution system with trained manpower during 1st year after completion of the work as described below.
(a) 1st Shift (0100 Hrs to 0900 Hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(b) 2nd Shift (0900 hrs to 1700 hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(c) 3rd Shift (1700 hrs to 0100 hrs) (i) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (ii) 01 Nos helper,
Manning and operation of the SCADA based centralised monitoring and control water supply pumping and distribution system with trained manpower during 2nd year after completion of the work as described below.
(a) 1st Shift (0100 Hrs to 0900 Hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(b) 2nd Shift (0900 hrs to 1700 hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(c) 3rd Shift (1700 hrs to 0100 hrs) (i) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (ii) 01 Nos helper,
Manning and operation including comprehensive maint (AMC) of the SCADA based centralised monitoring and control water supply pumping and distribution system with trained manpower during 3rd year after completion of the work as described below.
(a) 1st Shift (0100 Hrs to 0900 Hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(b) 2nd Shift (0900 hrs to 1700 hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(c) 3rd Shift (1700 hrs to 0100 hrs) (i) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (ii) 01 Nos helper,
The scope of work shall include : (a) Servicing and maintenace / repair and replacemet of defective components/ spare parts. The cost of spares if any shall be deemed to be included in the quoted rates (b) Any changes to the programmable logic controller (PLC) i.e., changes in ladder logic of programme, changes in operational timing etc., (e) Any changes in Command control station software and related software i.e., change in report format, changes in operational screens, creation of soft keys etc., (f) All necessary reports related to all the systems to be mailed to AGE/ JE on weekly. NOTE : (i) All the breakdown shall be attended within 08 hours failing which a penal recovery of Rs 1,000/- per day shall be recovered from Contractors due payment till system repairs completed satisfactorily for partial breakdown and Rs, 5000/- per day for whole breakdown of system till system repairs completed satisfactorily. (ii) The quoted rate is deemed inclusive of all the charges for communication including broadband with static IP at Central Command Control Centre, broadband at the local Command Control Centre and GPRS enabled data cards used in all PLC based panel related to scope of work.
Manning and operation including comprehensive maint (AMC) of the SCADA based centralised monitoring and control water supply pumping and distribution system with trained manpower during 4th year after completion of the work as described below.
(a) 1st Shift (0100 Hrs to 0900 Hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(b) 2nd Shift (0900 hrs to 1700 hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(c) 3rd Shift (1700 hrs to 0100 hrs) (i) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (ii) 01 Nos helper,
The scope of work shall include : (a) Servicing and maintenace / repair and replacemet of defective components/ spare parts. The cost of spares if any shall be deemed to be included in the quoted rates (b) Any changes to the programmable logic controller (PLC) i.e., changes in ladder logic of programme, changes in operational timing etc., (e) Any changes in Command control station software and related software i.e., change in report format, changes in operational screens, creation of soft keys etc., (f) All necessary reports related to all the systems to be mailed to AGE/ JE on weekly. NOTE : (i) All the breakdown shall be attended within 08 hours failing which a penal recovery of Rs 1,000/- per day shall be recovered from Contractors due payment till system repairs completed satisfactorily for partial breakdown and Rs, 5000/- per day for whole breakdown of system till system repairs completed satisfactorily. (ii) The quoted rate is deemed inclusive of all the charges for communication including broadband with static IP at Central Command Control Centre, broadband at the local Command Control Centre and GPRS enabled data cards used in all PLC based panel related to scope of work.
Manning and operation including comprehensive maint (AMC) of the SCADA based centralised monitoring and control water supply pumping and distribution system with trained manpower during 5th year after completion of the work as described below.
(a) 1st Shift (0100 Hrs to 0900 Hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(b) 2nd Shift (0900 hrs to 1700 hrs) (i) 01 Nos ITI qalified SCADA operators with knowledge of operation of the system on SCADA (ii) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (iii) 01 Nos helper,
(c) 3rd Shift (1700 hrs to 0100 hrs) (i) 01 Nos ITI qalified techncians trained by manufacturer of the PLC based control panel with knowledge of operation of the system on SCADA and trouble shooting with respect to all sub sysytems viz., computers, all software, motorised and solenoid valves, pressure transmitters, ultrasonic and magnetic level sensors, communication equipment etc., of the automated system (ii) 01 Nos helper,
The scope of work shall include : (a) Servicing and maintenace / repair and replacemet of defective components/ spare parts. The cost of spares if any shall be deemed to be included in the quoted rates (b) Any changes to the programmable logic controller (PLC) i.e., changes in ladder logic of programme, changes in operational timing etc., (e) Any changes in Command control station software and related software i.e., change in report format, changes in operational screens, creation of soft keys etc., (f) All necessary reports related to all the systems to be mailed to AGE/ JE on weekly.
NOTE : (i) All the breakdown shall be attended within 08 hours failing which a penal recovery of Rs 1,000/- per day shall be recovered from Contractors due payment till system repairs completed satisfactorily for partial breakdown and Rs, 5000/- per day for whole breakdown of system till system repairs completed satisfactorily. (ii) The quoted rate is deemed inclusive of all the charges for communication including broadband with static IP at Central Command Control Centre, broadband at the local Command Control Centre and GPRS enabled data cards used in all PLC based panel related to scope of work.
Recktronic Devices and Systems
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .