| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-AOC 520C MAIN ROAD WARD NO 12 METTU STREET ELAMBALUR PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621220 | 1 | Accepted-AOC Work Awarded | |
| 2 | 2₹5.0 L+₹53,980.02 (12.2%)Rejected-Finance | 2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | KDM BUILDERS AND CONTRACTORS L1 | M.Thangaraj L2 |
|---|---|---|---|---|---|
| 1.00Dismantling and clearing away (Corporation limit) from site to the designated place as directed by the engineer at site including labour, lead and lift etc., complete. | |||||
| 1.10 | Floor Finish, Floor tiles & Dadooing | 57.17 | m2 | 72 ₹4,116.24 | 60 ₹3,430.2 Lowest |
| 1.20 | Doors and Windows including removal of frames, hinges and fastenings | 7.92 | m2 | 100 ₹792 Lowest | 153 ₹1,211.76 |
| 1.30 | Dismantling the pressed tiles and clearing away debris (corporation limit) from site to the designated place as directed by the engineer at site including labour, lead and lift etc., complete. | 115.56 | m2 | 54 ₹6,240.24 | 45 ₹5,200.2 Lowest |
| 1.40 | ORDINARY SOIL (SS20A) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth (SS20A) | 30.8 | m3 | 81 ₹2,494.8 Lowest | 90 ₹2,772 |
| 1.50 | Filling with available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc., in layer not exceeding 20cm deapth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.50m | 9.24 | m3 | 45 ₹415.8 Lowest | 50 ₹462 |
| 1.60 | Supply and filling the basement with 'M' sand for foundation and complete basement including watering consolidation etc. | 11 | m3 | 1,620 ₹17,820 | 1,600 ₹17,600 Lowest |
| 1.70 | PCC 1:4:8 using 40mm HB stone for foundation including cost of al materials and labour etc., complete. | 7.7 | m3 | 4,500 ₹34,650 Lowest | 4,500 ₹34,650 Lowest |
| 1.80 | Brick work in CM 1:6 using II nd class country bricks of size 9"x4-3/8"x2-3/4" for ground floor wall including cost of all materials, labour charges etc., complete | 0.47 | m3 | 6,000 ₹2,820 Lowest | 6,600 ₹3,102 |
| 1.90 | Plastering in CM 1:5, 12mm thick for Brick walls including cost of all materials labour charges etc., complete. | 4.05 | m2 | 270 ₹1,093.5 Lowest | 270 ₹1,093.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,954
Closing Date
2 Dec 2025, 2:00 pmClosed
Superintending Engineer/DEDC/Dindigul
O/o the Superintending Engineer, DEDC,Dindigul
Repair and maintenance work at V.Kurumbapatti 110 KV SS control room damaged / settled flooring area, plastering the spalled ceiling area and replace the roof pressed tiles providing new solar reflective tiles,etc.,
2025_EB_624156_1
ETC.NO.17(25-26)
Open Tender
Civil Works
Works
DINDIGUL
Please refer the tender documents.
3 documents required · 3 mandatory
₹0
₹4,954
29 Dec 2025
17 Nov 2025
3 Dec 2025
17 Nov 2025
2 Dec 2025
17 Nov 2025
Amount
Dismantling and clearing away (Corporation limit) from site to the designated place as directed by the engineer at site including labour, lead and lift etc., complete.
Floor Finish, Floor tiles & Dadooing
Doors and Windows including removal of frames, hinges and fastenings
Dismantling the pressed tiles and clearing away debris (corporation limit) from site to the designated place as directed by the engineer at site including labour, lead and lift etc., complete.
ORDINARY SOIL (SS20A) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth (SS20A)
Filling with available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc., in layer not exceeding 20cm deapth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.50m
Supply and filling the basement with 'M' sand for foundation and complete basement including watering consolidation etc.
PCC 1:4:8 using 40mm HB stone for foundation including cost of al materials and labour etc., complete.
Brick work in CM 1:6 using II nd class country bricks of size 9"x4-3/8"x2-3/4" for ground floor wall including cost of all materials, labour charges etc., complete
Plastering in CM 1:5, 12mm thick for Brick walls including cost of all materials labour charges etc., complete.
Special type of plastering with CM 1:3 - 10mm thick by using special bonding agent and repair material including chipping of concrete, cost of materials,curing, labour, lead,lift etc., complete.
Supplying and fixing of Stain Free Nano Polish Vitrified Tiles 600 x 600 x 8mm in CM 1:3 of approved quality and colour including cost of all materials, lead, lift etc complete
Providing good quality of solar reflective ceramic Tiles with a size 305x 305 x7 mm of approved make laid with proper slope to drain off water in CM 1:3,min 20 mm thick including cutting the tiles to the required size wherever necessary, laying in position and pointing with white cement mixed with crude oil including cost of all materials, curing, etc., complete.
Flooring with good quality ceramic tiles/ Non slippery tiles of size 305 mm x 305 mm x 6mm laid over 20mm thick CM 1:3 of approved quality and colour including cost of all materials lead, lift etc complete,
Replacing of damaged door wood with new CW planks of 30 cm wide with 25 mm thick should be fixed in position suitably as instructed by the field engineer at site incluing cost of all labour, lead, lift etc., complete.
Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of single leaf door with half panelled with 12mm thick MDF both side laminated board of exterior grade at bottom and half glazed using 5.50mm thick sun cool glass at top with automatic door closure B3538 and Shutter frame made of section Vertical & Top rail: 50x44.45x2.50mm @ 1.292 kg/m ,Bottom rail: 100 x 44.45 x 2.50mm @ 1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/m, Alu Clips: 17.15x17.27x1.50 mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 Kg/m and necessary accessories such as aluminium clips, rubber beading, PVC felt, handle for a length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 1 No., aluminium tower bolt 200x12mm - 1No., aluminium Hydraulic door closer - 1No ., lock-1No., Door stopper with rubber bush including cost of materials labour charges and power consumption charges required for fabrication including chipping, dismantling and making hole to the required extent in RCC column, beams, masonry with power drill wherever necessary and redoing the damaged portion to the original condition after fixing etc., complete. All the Alu. Section are to be anodised with matt finish under electricaly controlled conditions in accordance with IS 1868/1962 for an average anatic film thickness of 15 microns etc., complete.Aluminium sections,and furniture fittings shall be got approved by the Engineer incharge.
White washing two coats using white cement including cost of all materials, labour, brushes, lead, lift,scaffolding charges, etc., complete.
Supplying and fixing of wash hand basin of size 550mm x 400mm with all accessories such as brackets , waste coupling, waste pipe, etc., including cost of all materials, labour lead, lift, etc., complete.
Supplying, fixing and laying of UPVC pipe SCHEDULE 40 for water supply arrangement including cost of all materials, labour, lead, lift etc complete.
Supplying, fixing and laying of 20 mm dia CPVC pipe SCHEDULE 40 for water supply arrangement including cost of all materials, labour, lead, lift etc complete.
Supply and laying 110mm dia 6Kg PVC pipes jointing, testing etc., complete, including cost of all materials, labour earth work excavation and sand filling etc., complete.(Sewer Line)
Supplying and fixing of PVC down fall pipe of 110 mm dia, 4 kg / cm2 with necessary, leads, lift etc complete.
Supplying and fixing of Brass Chromium Plated Screw Down Tap 15 / 12mm dia (Heavy Type) including cost of all materials, labour lead, lift, etc., complete.
Supplying and fixing 100 x 50mm PVC floor trap in bath room with one pvc door bend shoe of 50mm.dia including cost of all etc., complete
Labour charges for fixing doors alongwith frames in position etc., complete (finished work) as directed by the site engineer.
M.Thangaraj (BID ID -1518492)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_746325.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .