| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.0 LAccepted-AOC | ₹6.0 L | 1 | Accepted-AOC lowest price |
| 2 | 2₹6.2 LRejected-Finance | ₹6.2 L | 2 | Rejected-Finance highest price |
| Sl No | Description | Qty | Unit | M M KARTHIKEYAN L2 | H SRI HARI L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Narrow Foundations - First Depth - Upto 2.20m | 16 | M3 | 290 ₹4,640 | 250 ₹4,000 |
| 1.02 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 29.33 | M3 | 450 ₹13,198.50 | 320 ₹9,385.60 |
| 1.03 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2.76 | M3 | 5,598.48 ₹15,451.80 | 5,550 ₹15,318 |
| 1.04Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam | |||||
| 1.05 | Plinth Beam | 13 | M2 | 525 ₹6,825 | 525 ₹6,825 |
| 1.06 | Plain surface | 22 | M2 | 1,085.1 ₹23,872.20 | 1,085.1 ₹23,872.20 |
| 2.00 | for Column | 25 | M2 | 1,302.12 ₹32,553 | 1,302.12 ₹32,553 |
| 2.01 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3. | 8 | M3 | 8,697.88 ₹69,583.04 | 8,697.88 ₹69,583.04 |
| 2.02 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification | 960 | Kg | 105 ₹1.0 L | 91.6 ₹87,936 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
10 Oct 2025, 3:00 pmClosed
The Executive Officer, Paravai Town Panchayat
The Executive Officer, Paravai Town Panchayat
Paravai Town Panchayat Construction of Bus Passenger Shed at Dindigul Main Road North side in Paravai Town Panchayat.
2025_DTP_611463_1
373/2025
Open Tender
Civil Works
90 days
PARAVAI
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,000
13 Mar 2026
4 Oct 2025
10 Oct 2025
4 Oct 2025
10 Oct 2025
4 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_730643.pdf
boq_comp_chart.xlsx
xlsx