Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹69,515.39Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹73,412.50+₹3,897.11 (5.61%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹77,317.42+₹7,802.03 (11.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹77,395.51+₹7,880.12 (11.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹78,000
EMD Value
₹2,340
Closing Date
25 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Const ofP wall near House of Qaiser Ahmad Ganie W.No 3 Lastiyal
2026_RDPR_315510_31
NIT NO 42 OF 2026-27 KALAROOSE ADF
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹2,340
1 Aug 2026
13 Jul 2026
25 Jul 2026
13 Jul 2026
25 Jul 2026
13 Jul 2026
13 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches upto 1.5 m depth i/c disposal | - | Cum | - | - |
| 2 | Providing/Laying of dry stone soling, tightly hand packed including al carriage | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:4:8 using 20mm nominal size aggregate | - | Cum | 1 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 20mm nominal size aggregate | 1 | Cum | - | - |
| 5 | Centring and shuttering incld strutting propping etc and removal of formwork | - | Sm | - | - |
| 6 | carriage of Aggregates with average lead of 25kms | - | Cum | - | - |
| 7 | Add Provision for CIB<Photographs | - | No. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_1023871.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .