Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified in technical evaluation |
| 2 | Accepted-Technical | Accepted-Technical Qualified in technical evaluation |
| 3 | Accepted-Technical | Accepted-Technical Qualified in technical evaluation |
| 4 | Accepted-Technical ANUVAPADA PO SORISISA PS KENDRAPARA PIN 751210 | KENDRAPARA | KENDRAPARA | ODISHA | 751210 | Accepted-Technical Qualified in technical evaluation |
| 5 | Accepted-Technical AT TAUNTARA PO SASANDA PS BINJHARPUR DIST JAJPUR PIN 755027 | JAJAPUR | ODISHA | 755027 | Accepted-Technical Qualified in technical evaluation |
Tender Value
₹63.0 L
EMD Value
₹63,100
Closing Date
18 Feb 2026, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, Deo Head Works Division, Karanjia
O/o the SE, Deo Head Works Division, Karanjia, AT/Po-Karanjia, Mayurbhanj
Construction of VRB and Missing Structures of Right Main Distributary of DIP
2026_CCEDI_125493_1
04SEDHWD2025-26
Open Tender
Civil Works - Canal
Percentage
Hatibari
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
₹63,100
Yes
7 Jul 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
4 Feb 2026 - 16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| . | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stony earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1 km from the place of excavation complete. | 1,930.58 | Cum. | 82 | ₹1,58,307.56 |
| 2 | Filling in foundation and plinth with approved quality sand and rammed including all lead, lift, cost carriage and royality etc. complete as per direction of the Engineer-in-charge. | 127.12 | Cum. | 1,240.5 | ₹1,57,692.36 |
| . | Cement concrete M15 grade with crushed granite coarse aggregate of size 40mm down graded mixed in batching and mixing plant including cost of all materials, machineries and labour and transportation of mixed concrete within initial lead of 1km by mechanical means and laying in dams, barrages, power house and pen stock with all lifts/delifts upto 1.5m height above average ground level as per direction of Engineer-in-charge. | 267.02 | Cum. | 5,968.1 | ₹15,93,602.06 |
| 4 | Cement concrete M15 grade with crushed granite coarse aggregate of size 20mm and down graded mixed in batching and mixing plant including cost of all materials, machineries and labour and transportation of mixed concrete within initial lead of 1km by mechanical means and laying in dams, barrages, power house and pen stock with all lifts/delifts upto 1.5m height above average ground level in respective blocks as per direction of Engineer-incharge. | 280.97 | Cum. | 6,285.55 | ₹17,66,050.98 |
| . | Plain Cement concrete/Reinforced cement Concrete M20 grade with crushed granite coarse aggregate of size 20mm and down graded mixed in batching and mixing plant including cost of all materials, machineries and labour and transportation of mixed concrete within initial lead of 1km by mechanical means and laying in dams, barrages, power house and pen stock with all lifts/delifts upto 1.5m height above average ground level in respective blocks as per direction of Engineer-incharge. | 80.98 | Cum. | 6,790.5 | ₹5,49,894.69 |
| 6 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. | 78.48 | Qntl. | 8,824.9 | ₹6,92,578.15 |
| . | Providing formwork for concrete with F1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc. with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labor, materials and T & P complete as directed by the Engineer-in-charge. | 1,067.72 | Sqm. | 928.9 | ₹9,91,805.11 |
| 8 | Providing formwork for concrete with F2 finish for all permannetly exposed surfaces not prominently exposed to public view such as in bucket, ogee, pier noses and other curved surfaces with steel shuttering plates including supply of rigid ties and supports with all labour, materials and T & P including finishing complete as directed by the Engineer-in-charge. | 342.26 | Sqm. | 992.6 | ₹3,39,727.28 |
| . | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge. | 375.4 | Cum. | 54.7 | ₹20,534.38 |
| 10 | Supplying, laying and collar jointing R.C.C. spun pipes (NP2) 100 mm dia with necessary twisted & coaltared hemp yarn including caulking and filling with cement mortor (1:1) and finishing the same smooth & curing including cost, conveyance,taxes, royalty etc. of all materials with all leads & lifts complete as per direction of the Engineer-in-charge. | 60 | Rmt. | 328.9 | ₹19,734 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 1.00 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
BOQ_579186.xls
BOQ • 0.40 MB
BidVRB.pdf
Tender Documents • 18.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .