| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.9 LAdmitted-Finance | ₹83.9 L | L1 | Admitted-Finance |
| 2 | L2₹84.8 L+₹88,430.10 (1.05%)Admitted-Finance | ₹84.8 L+₹88,430.10 (1.05%) | L2 | Admitted-Finance |
| 3 | L3₹86.8 L+₹2.9 L (3.45%)Admitted-Finance BHU | ₹86.8 L+₹2.9 L (3.45%) | L3 | Admitted-Finance |
| 4 | L4₹87.5 L+₹3.6 L (4.31%)Admitted-Finance HARIYANA BHAWAN NEAR MAA SHARADA MANDIR CHOWK RAM NAGAR COLONY BOKARO JHARKHAND 827013 | BOKARO | JHARKHAND | 827013 | ₹87.5 L+₹3.6 L (4.31%) | L4 | Admitted-Finance |
| 5 | L5₹87.6 L+₹3.7 L (4.41%)Admitted-Finance | ₹87.6 L+₹3.7 L (4.41%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BUILDING SOLUTION L7 | M/S MADONA AND CO L2 | BINOD L4 | NARAYAN DEKA L1 | BUILDRITE CONSTRUCTION L6 | SWEETY PEST CONTROL L3 | Shivkrupa Enterprises L8 | TRICON L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00BLOCK A,B,C | |||||||||||
| 2.00 | Specification – 1
Surface Preparation: Preparing the surface by cleaning the surface for removing loose, laitance, dirt etc. by proper means. All the construction joints should be cut in a Groove and wash the entire surface thoroughly by hi-jet washer and filling the gaps with epoxy putty or Polymer modified mortar. | 4,019.55 | sqm | 200 ₹8,03,910 | 535 ₹21,50,459.25 | 89 ₹3,57,739.95 Lowest | 416 ₹16,72,132.8 | 260 ₹10,45,083 | 200 ₹8,03,910 | 100 ₹4,01,955 | 190 ₹7,63,714.5 |
| 3.00 | Application of Two coats of Epoxy Primer over the entire prepared surface. dilution ratio 1:1:1 component A: B: water (100% by weight of Primer) Application of 2 (Two ) Coats of PU Magnum a Single component Polyurethane, waterproofing liquid membrane over the primed surface as per the company’s Specification | 4,019.55 | sqm | 965 ₹38,78,865.75 | 520 ₹20,90,166 Lowest | 1,000 ₹40,19,550 | 628 ₹25,24,277.4 | 855 ₹34,36,715.25 | 880 ₹35,37,204 | 1,150 ₹46,22,482.5 | 900 ₹36,17,595 |
| 4.00BLOCK D,E,F | |||||||||||
| 5.00 | Specification – 1
Surface Preparation: Preparing the surface by cleaning the surface for removing loose, laitance, dirt etc. by proper means. All the construction joints should be cut in a Groove and wash the entire surface thoroughly by hi-jet washer and filling the gaps with epoxy putty or Polymer modified mortar. | 4,019.55 | sqm | 200 ₹8,03,910 | 535 ₹21,50,459.25 | 89 ₹3,57,739.95 Lowest | 416 ₹16,72,132.8 | 260 ₹10,45,083 | 200 ₹8,03,910 | 100 ₹4,01,955 | 190 ₹7,63,714.5 |
| 6.00 | Application of Two coats of Epoxy Primer over the entire prepared surface. dilution ratio 1:1:1 component A: B: water (100% by weight of Primer) Application of 2 (Two ) Coats of PU Magnum a Single component Polyurethane, waterproofing liquid membrane over the primed surface as per the company’s Specification | 4,019.55 | sqm | 965 ₹38,78,865.75 | 520 ₹20,90,166 Lowest | 1,000 ₹40,19,550 | 628 ₹25,24,277.4 | 855 ₹34,36,715.25 | 880 ₹35,37,204 | 1,150 ₹46,22,482.5 | 900 ₹36,17,595 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
8 Aug 2024, 2:00 pmClosed
HOS MAINTENANCE
IPM SECTION, IIT GUWAHATI
Terrace waterproofing treatment at Lohit Hostel D, E and F Block (Phase-I) and A, B and C Block (Phase-II) at IITG Campus
2024_IITG_817934_1
IITG/IPM/NIT/R/2023-24/84
Open Tender
Civil Works
Works
365 days
IIT GUWAHATI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.2 L
Yes
23 Jan 2025
24 Jul 2024
9 Aug 2024
24 Jul 2024
8 Aug 2024
24 Jul 2024
Amount
BLOCK A,B,C
Specification – 1 Surface Preparation: Preparing the surface by cleaning the surface for removing loose, laitance, dirt etc. by proper means. All the construction joints should be cut in a Groove and wash the entire surface thoroughly by hi-jet washer and filling the gaps with epoxy putty or Polymer modified mortar.
Application of Two coats of Epoxy Primer over the entire prepared surface. dilution ratio 1:1:1 component A: B: water (100% by weight of Primer) Application of 2 (Two ) Coats of PU Magnum a Single component Polyurethane, waterproofing liquid membrane over the primed surface as per the company’s Specification
BLOCK D,E,F
Specification – 1 Surface Preparation: Preparing the surface by cleaning the surface for removing loose, laitance, dirt etc. by proper means. All the construction joints should be cut in a Groove and wash the entire surface thoroughly by hi-jet washer and filling the gaps with epoxy putty or Polymer modified mortar.
Application of Two coats of Epoxy Primer over the entire prepared surface. dilution ratio 1:1:1 component A: B: water (100% by weight of Primer) Application of 2 (Two ) Coats of PU Magnum a Single component Polyurethane, waterproofing liquid membrane over the primed surface as per the company’s Specification
M/S MADONA AND CO (BID ID -3063406)
SWEETY PEST CONTROL (BID ID -3064736)
BINOD (BID ID -3066796)
TRICON (BID ID -3066733)
BUILDRITE CONSTRUCTION (BID ID -3065548)
BUILDING SOLUTION (BID ID -3058582)
Shivkrupa Enterprises (BID ID -3066187)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_859596.xls
BOQ • 0.33 MB
NIT.pdf
Tender Documents • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .