Loading…
Loading…
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
1 Sept 2026, 6:00 pm4d left
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Construction of drain from H/O Farooq Ah Mir to H/O Gh Ahmad Hurra
2026_HAUDD_320714_14
NOTICE INVITING ETENDER No. 27 of 2026-2027 Dated 12.08.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Farooq Ah Mir to H/O Gh Ahmad Hurra
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹210
FA/CAO AC NO 0216010200000007
₹10,000
1 Sept 2026
13 Aug 2026
2 Sept 2026
14 Aug 2026
1 Sept 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labours for site clearance. | 2 | No | 553 | ₹1,106 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge 1:3:6 or richer mix (i/c equivalent design mix) | 9.06 | Cum | 1,725.2 | ₹15,630.31 |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge all kinds of soil | 63.43 | Cum | 187.3 | ₹11,880.44 |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | 15.85 | Cft | 592.9 | ₹9,397.47 |
| 5 | Providing & laying stone soiling including compacting, watering including all carriages of material complete | 13.08 | Cum | 850 | ₹11,118 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 6.54 | Cum | 5,202.9 | ₹34,026.97 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 36 | Cum | 5,733.6 | ₹2,06,409.6 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 2.83 | Cum | 7,788.4 | ₹22,041.17 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 283.17 | Kg | 123.2 | ₹34,886.54 |
| 10 | Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 119.01 | Sqm | 286.35 | ₹34,078.51 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1067556.xls
BOQ • 0.30 MB
Extention1.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].