Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹3.0 L+₹4,374 (1.49%)Rejected-Finance | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | MUKESH KUMAR SHARMA L2 | M/S BHASKAR SHARMA CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 3,000 | Cum. | 63 ₹1,89,000 | 62 ₹1,86,000 Lowest |
| 2.00 | Earth Work in silt clearance including lift upto 1.5 M and lead upto 200 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 200 | Cum. | 140 ₹28,000 Lowest | 150 ₹30,000 |
| 3.00 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 9,620 | Sqm | 4.3 ₹41,366 | 4 ₹38,480 Lowest |
| 4.00 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 7,415 | Sqm | 4 ₹29,660 Lowest | 4 ₹29,660 Lowest |
| 5.00 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 12 | Nos. | 620 ₹7,440 | 600 ₹7,200 Lowest |
| 6.00 | Painting gauge including all cost of material, labour and T&P etc. | 6 | Rm. | 10 ₹60 Lowest | 10 ₹60 Lowest |
| 7.00 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials. | 23 | Sqm. | 51 ₹1,173 | 50 ₹1,150 Lowest |
| 8.00 | Printing letters including all cost of material, labour and T&P etc. up to 10 cm ht complete . | 45 | Nos | 25 ₹1,125 | 20 ₹900 Lowest |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
17 Nov 2026, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
U.M.B.D.G.C. KHURJA
Silt Clearence of Minors
2026_UPIDC_1187133_44
06/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
U.M.B.D.G.C. KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹6,000
17 Nov 2026
12 Nov 2026
17 Nov 2026
12 Nov 2026
17 Nov 2026
12 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 3,000 | Cum. | - | - |
| 2 | Earth Work in silt clearance including lift upto 1.5 M and lead upto 200 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 200 | Cum. | - | - |
| 3 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 9,620 | Sqm | - | - |
| 4 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 7,415 | Sqm | - | - |
| 5 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 12 | Nos. | - | - |
| 6 | Painting gauge including all cost of material, labour and T&P etc. | 6 | Rm. | - | - |
| 7 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials. | 23 | Sqm. | - | - |
| 8 | Printing letters including all cost of material, labour and T&P etc. up to 10 cm ht complete . | 45 | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2291302.xls
BOQ • 0.25 MB
co07.pdf
Additional Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .