Tender Value
₹2.0 L
EMD Value
₹5,880
Closing Date
2 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O Lane/ XING NHO Shafi sheikh and others at katoo canal dal colony Block Dpora
2026_RDPR_313822_8
ENIT33of2026-27
Open Tender
Civil Works
Percentage
30 days
office of the executive engineer rew ang
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹5,880
3 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
2 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors including cutting of shrubs etc. | 3 | lab | - | - |
| 0.0 | Earthwork in excavation by manual means in trenches for foundations etc (not exceeding 1.5m in width) and not exceeding 10 sqm on plan,depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge,disposed earth to be levelled and neatly dressed. | 1.7 | cum | - | - |
| 0.0 | Providing and laying of stone soling of tightly hand packed by tamping including carriage Lead of 15 KM by MT. | 11.72 | cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 16.42 | cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work forFoundations, footings, bases for columns | 20.45 | sqm | - | - |
| 0.0 | Reinforced cement concrete work in Slab excluding cost of centring, shuttering, finishing and reinforcement,with 1:1.5:3 graded stone aggregate 20mm nominal size | 2.83 | cum | - | - |
| 0.0 | Reinforcement for RCC work including straightening,bending,cutting,placing in position and binding all complete, hot rolled deformed bars.@ 0.90qt/cum | 2.55 | cum | - | - |
| 0.0 | carriage of materials cement/steel | 2 | trip | - | - |
| 0.0 | sand /bajri 20Km by MT | 26.18 | cum | - | - |
| 0.0 | H/L Qnty sand/bajri Lead 100 mtr | 26.18 | cum | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1015851.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .