| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.6 LAdmitted-Fee/PreQual/Technical/Finance AT JAMUNABAHAL PO DADPUR PS BHAWANIPATNA DIST KALAHANDI 766002 | KALAHANDI | ODISHA | 766002 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹13.8 L+₹15,559.27 (1.14%)Admitted-Fee/PreQual/Technical/Finance AT PO M RAMPUR DIST KALAHANDI ODISHA | M RAMPUR | KALAHANDI | ODISHA | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹14.0 L+₹41,491.38 (3.04%)Admitted-Fee/PreQual/Technical/Finance DURGPAL KAMARDA BALASORE | BALASORE | BALASORE | ODISHA | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹14.4 L+₹73,906.52 (5.42%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹14.5 L+₹84,927.67 (6.23%)Admitted-Fee/PreQual/Technical/Finance AT PO KESINGA BAGAD WARD NO 01 DIST KALAHANDI | KALAHANDI | ODISHA | 766001 | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.6 L
EMD Value
₹21,700
Closing Date
22 Jul 2026, 4:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, KESINGA
PWD Road- Sundipada _Road_RCC culvert -1x3x2-m, Protection wall,Approach road -20 mtr-_At 2.450 km
2026_CERWI_135338_1
RWKSNG-online-2/26-27
Open Tender
Civil Works - Roads
Percentage
60 days
Kalahandi
2 documents required · 2 mandatory
₹6,000
₹21,700
Yes
22 Jul 2026
10 Jul 2026
22 Jul 2026
10 Jul 2026
22 Jul 2026
10 Jul 2026
10 Jul 2026 - 20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads & lifts including dressing the sides & leveling the bed of the foundation to the required width & depth & stacking the excavated materials away from the working areas as directed by Engineer -in-Charge. | 249.21 | cum | 282.9 | ₹70,501.51 |
| 2 | Providing filling foundation and plinth with sand well watered and rammed with all leads and lifts including cost , conveyance, royality of materials labour . T & P etc. complete as per direction of Engineer -in-Charge. | 24.07 | cum | 734.5 | ₹17,679.42 |
| 3 | Cement concrete (1:3:6) in foundation and plinth using 4cm size hard granite metal of approved quality from aproved quarry including hoisting,lowering and laying concrete in layers,each layer not exceeding 15cm in depth watering curing ramming to proper level including cost, conveyance, taxes and royalty of all materials cost of all labour, T & P required for the work etc. complete as per specification and direction of Engineer -in-Charge | 109.45 | cum | 6,567.6 | ₹7,18,823.82 |
| 4 | Cement concrete (1:3:6) in Sub structure and plinth using 4cm size hard granite metal of approved quality from aproved quarry including hoisting,lowering and laying concrete in layers,each layer not exceeding 15cm in depth watering curing ramming to proper level including cost, conveyance, taxes and royalty of all materials cost of all labour, T & P required for the work etc. complete as per specification and direction of Engineer -in-Charge | 95.84 | cum | 6,614.8 | ₹6,33,962.43 |
| 5 | Cement concrete (1:2:4) with 12mm. Size hand/crusher broken hard granite chips of approved quality from approved quarry including hoisting,lowering and laying in position in layers not exceeding 15cm thick with proper packing and ramming by means of vibrator to proper slope & level including curring with cost, conveyance, royalty & taxes of all materials required for the work , T&P articles, finishing the exposed surface smooth as per specification & direction of the Engineer in charge | 2.25 | cum | 8,049.2 | ₹18,110.7 |
| 6.1 | R.C.C work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction Deck Slab | 9.45 | cum | 12,034.75 | ₹1,13,728.39 |
| 6.2 | Abutment Cap | 2.1 | cum | 8,015.9 | ₹16,833.39 |
| 6.3 | Dirt wall | 4.49 | cum | 11,711.5 | ₹52,584.64 |
| 7 | Proving R.C.C M-30 Casting in Wearing Coat including cost canveyance rayality & taxes of all materials cost of all labour T&P etc, complete. | 18.91 | cum | 6,940.85 | ₹1,31,251.47 |
| 8 | Supplying, fitting and placing uncoated HYSD reinforcement bars for RCC work including cutting, bending, binding, tying the grill with 18 to 20 gauge binding wire and placing in position including cost, conveyance taxes of reinforcement bars, binding wire etc and with all labours T&P Sundries complete as per drawing technical specificationand direction of Engineer- in - charge | 25.68 | qtl | 8,096.1 | ₹2,07,907.85 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Tendernotice_2.pdf
PDF • 4.30 MB
BOQ_600930.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .