Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L1 | Accepted-AOC OK | |
| 2 | L2₹13.2 L+₹6,600 (0.50%)Rejected-Finance N A | NEW DELHI | DELHI | 110001 | L2 | Rejected-Finance Other than lowest tenderer | |
| 3 | L3₹15.4 L+₹2.3 L (17.3%)Rejected-Finance | L3 | Rejected-Finance Other than lowest tenderer | |
| 4 | L4₹16.3 L+₹3.1 L (24.0%)Rejected-Finance 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L4 | Rejected-Finance Other than lowest tenderer | |
| 5 | L5₹16.5 L+₹3.4 L (25.6%)Rejected-Finance RZ H 5 NANDA BLOCK MAHAVIR ENCLAVE PART 1 PAL AM SOUTH WEST DELHI DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | L5 | Rejected-Finance Other than lowest tenderer |
Tender Value
₹21.7 L
EMD Value
₹43,400
Closing Date
15 Jul 2020, 6:00 pmClosed
GE E/M BASE HOSPITAL DELHI CANTT
GE E/M BASE HOSPITAL DELHI CANTT-110010
MANNING AND OPERATION FOR POWER HOUSE INSTALLATIONS AT CABINET SECTT NEW DELHI UNDER GE (E/M) BASE HOSPITAL DELHI CANTT-10
2020_MES_355542_1
GE/BH-27/2020-21
Open Tender
Electrical and Maintenance Works
Works
334 days
GE E/M BASE HOSPITAL DELHI CANTT
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE E/M BASE HOSPITAL DELHI CANTT
₹43,400
Yes
25 Jul 2020
24 Jun 2020
17 Jul 2020
24 Jun 2020
15 Jul 2020
8 Jul 2020
Amount
Manning and operation for Power House 11 KV electrical sub station (MRS), VCBs, coupler bus bar and related ACBs including rectifying HT/LT fault and operation of DG set along with it's control panel, DC and AC, AMF Panel including rectifyng fault of DG set by deploying skilled manpower to operate installed machinery round the clock, seven days a week incl Sunday/ Holiday (in three shift of 8 Hrs each) Complete all as specified and as directed. (a) First Shift-0600 Hrs to 1400 Hrs - One DG Operator and One Electrician (b) Second shift-1400Hrs to 2200Hrs - One DG Operator and One Electrician (c) Third Shift - 2200Hrs to 0600Hrs - One DG Operator and One Electrician Details of machinery installed in sub station are as under:- (a) HT VCB incommer cap 630 A - 02 Each (b) VCB outgoing - 05 Each (c) Busbar coupler cap - 01 Each (d) ACB Panel - 36 Each (e) DG Sets : (i) 750 KVA -03 Each (ii) 160 KVA -01 Each (f) UPS : (i) 6 KVA with related Bty -01 Each (ii) 60 KVA with related Bty -01 Each
Note:- The estimated cost of the work in respect of BOQ Sr item No 1.00 (as based on minimum wages rates issued vide central/state) is Rs 18,50,000/-. If the quoted amount is found less than the estimated cost of Sr item No 1.00 of BOQ and tender of lowest bidder is considered for acceptance, then the lowest bidder will have to deposit FDR in favour of Accepting officer for the difference in estimated cost and Accepted amount in respect of BOQ Sr item No 1.00 within 30 days from date of acceptance. In case the said FDR is not submitted within 30 days the amount in question shall be recovered from contractor’s first RAR/Final bill whichever is earlier. However the FDR/recovered amount shall be released to the contractor after satisfactory completion of work. (i) Contractor shall submit the nominal roll alongwith their qualification certificate of manpower to be deployed within 5 days of acceptance, after Rs. 500/- per shift shall be recovered. (ii) The DG Operator shall be ITI qualified in concerned trade and shall have minimum 05 years experience in operation of DG set (iii) The electrician shall be ITI qualified in concerned trade or shall have minimum 05 years working experience in operation of HT/LT panel (iv) Engr-in-Charge will interview of the person to be deployed for operation of HT/LT panel and DG set AMF panel. (v) Contractor will ensure attendance of all manpower shift wise if any operator found absent from duty a sum of Rs.1000/- per shift shall be recovered from the contractor. (vi) All necessary T&P for attending/recifying the related HT/LT and DG complaint shall be provided by the contractor to the operators at no extra cost. The rates for the same is deemed to be included in the unit rates of the items.
(vii) The contractor shall provide all the necessary stationery such as log book, attendance register etc to the the operator for maintenance the plant running record. (viii) Suitable reliever shall be provided during off shift. Reliver shall be report to substation before 30 miniutes sarting of shift and present operator not to leave the shift without report of reliver. (ix) Contractor shall submit the payment proof i.e. passbook of bank account at the time of submission of RAR. (x) All Operator shall wear proper uniform, failing which a recovery of Rs 200/- per shift shall be recovered. (xi) Diesel for running the DG set shall be issued free for filling in the DG set. (xi) The Electrician must be capable to do any type of work related to HT /LT fault. (xii) The DG Operator must capable to do any type of work related to DG set up to cap 750KVA.
M/S Rohit Enterprises
jay maa engineers
SANJEEV ENTERPRISES
SM CONSTRUCTION COMPANY
KRISHANA ELECTRIC WORKS
M/S ANIL KUMAR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .