| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.6 L+₹33,990.24 (4.71%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K.Arunachalam L1 | Subbaiah L2 |
|---|---|---|---|---|---|
| 1.00Main Estimate | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 26.58 | Cum | 250.6 ₹6,660.95 Lowest | 262.4 ₹6,974.59 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. | 8.48 | Cum | 5,136.65 ₹43,558.79 Lowest | 5,379.95 ₹45,621.98 |
| 4.00 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum | 9.56 | Cum | 5,476.25 ₹52,352.95 Lowest | 5,735.6 ₹54,832.34 |
| 5.00 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 30.12 | Cum | 5,815.75 ₹1,75,170.39 Lowest | 6,091.1 ₹1,83,463.93 |
| 6.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 30.37 | Sqm | 1,040.25 ₹31,592.39 Lowest | 1,089.55 ₹33,089.63 |
| 7.00 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete.( Super Structure) | 3.65 | Cum | 8,808.15 ₹32,149.75 Lowest | 9,225.3 ₹33,672.35 |
| 8.00 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 0.3 | MT | 87,272.55 ₹26,443.58 Lowest | 91,406.5 ₹27,696.17 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine etc., complete. | 19.56 | Sqm | 293.98 ₹5,750.25 Lowest | 307.9 ₹6,022.52 |
| 10.00 | Plastering with cement 1:5-12mm thick including cost and conveyance of all materials to site and all labour charges etc complete. | 251.43 | Sqm | 270.1 ₹67,911.24 Lowest | 282.85 ₹71,116.98 |
Tender Value
Refer Docs
EMD Value
₹7,850
Closing Date
28 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO(V.PT), KEELAPAVOOR
BLOCK DEVELOPMENT OFFICER (VILLAGE PANCHAYAT)
Construction of community sanitary Complex in venniyoor village at sivanadanoor panchayat
2026_RDTN_703338_1
BDOKVR/215/2026-B2
Open Tender
Civil Works
Works
KEELAPAVOOR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹7,850
Yes
29 Oct 2026
10 Sept 2026
29 Sept 2026
10 Sept 2026
28 Sept 2026
10 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Main Estimate | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 26.58 | Cum | 263.78 | ₹7,011.27 |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. | 8.48 | Cum | 5,406.97 | ₹45,851.11 |
| 4 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum | 9.56 | Cum | 5,764.45 | ₹55,108.14 |
| 5 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 30.12 | Cum | 6,121.83 | ₹1,84,389.52 |
| 6 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 30.37 | Sqm | 1,095 | ₹33,255.15 |
| 7 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete.( Super Structure) | 3.65 | Cum | 9,271.72 | ₹33,841.78 |
| 8 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 0.3 | MT | 91,865.86 | ₹27,835.36 |
| 9 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine etc., complete. | 19.56 | Sqm | 309.45 | ₹6,052.84 |
| 10 | Plastering with cement 1:5-12mm thick including cost and conveyance of all materials to site and all labour charges etc complete. | 251.43 | Sqm | 284.27 | ₹71,474.01 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_845471.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_845471.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .