Tender Value
₹4.6 L
EMD Value
₹5,000
Closing Date
9 Mar 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC ALIGARH
LAL DIGGI ALIGARH
Complete erection and commissioning of additional 40 MVA 132 33 KV Transformer III at 132 KV Substation Aligarh V under ETD I Aligarh
2020_UPTCL_539815_2
ETC-91/2020-21
Open Tender
Electrical Works
Item Rate
30 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹708
SE ETC ALIGARH
₹5,000
17 Mar 2021
20 Feb 2021
10 Mar 2021
20 Feb 2021
9 Mar 2021
20 Feb 2021
120 days
Amount
Shifting of main tank of 40 MVA, 132/33 KV Transformer from plinth upto 25 meters distance including turning of tank, if required, including all T&P and all other works required to complete the job satisfactority.
Proper packing of all HV/LV bushing of 40 MVA transformer in separate wooden crates to ensure safety of bushing in loading/ unloading and shifting including cost of packing and wrapping material. Bushing crate provided by department.
Loading of following capacity transformer tank, including all accessories, on trailor / trucks. The job includes jacking the transformer tank for placing the wooden sleeper under the tank and simultaneously lifting the tank by jacking and placing sleepers continuously under the tank till the wooden platform comes in the alignment of trailor bed and then shifting the tank from wooden platform to trailor bed. Removal of rails etc. from under the tank, proper tightening of tank on trailor bed with the help of wire rope and heavy turn buckle for safe transportation:-
Safe Carriage of following capacity transformer’s tanks and accessories on suitable capacity trailor / trucks to be arranged by the contractor at his own cost from (132 KV Substation Sarsol to 132 KV Substation Aligarh-V around 50 Km distance). Insurance shall be got done by the contractor as per direction of supervising engineer ,if required, which shall be reimbursed on actual.
Unloading the following capacity transformer tank including all accessories from trailor/trucks and their proper stacking at the designated place. The job includes opening of laces, jacking the transformer tank for placing the rails under the tank, shifting it to wooden sleeper platform, to be prepared adjacent to the trailor, removing the rails from under the tank on wooden platform of sleepers, lowering the tank towards ground by slowly removing the sleepers from under the tank:-
Shifting of main tank of 40 MVA, 132/33 KV Transformer from plinth upto 25 meters distance including turning of tank, if required, including all T&P and all other works required to complete the job satisfactority.
Additional shifting of above transformer 5 mtrs or thereof
Replacement of gasket of all the HV/LV/ neutral bushing, piping, main holes, radiators excluding top cover and OLTC cover only of 40 MVA transformer including cost of gasket of appropriate size 6/8/10 mm arrangement of men, material and T&P will be done by contractor.
Complete erection of 40 MVA, 132/33 KV Transformer by erection of radiators, conservator tanks, all bushings, their turrets, connecting all pipe lines, cooling fans, motor drive machanzm of tap changer, RTCC panels,oil pumps and associated oil pipe lines etc. to complete the job satisfactorily including first filling of oil and topping up of transformer oil in tank radiators, oil pipe lines, conservator tank etc. and attending the oil leakage, if any, and all other associated works for satisfactorily completion of work. No deparmental crane/T&P shall be provided.
Centrifuging of transformer oil in main tank of the 40 MVA transformer, taking the IR/BDV value of the transformer oil at an interval of 4 hours as per norms till the desired value of BDV/PPM are obtained. (Centrifuging machine arrange by the contractor at his own cost).
Spray painting of 40 MVA power transformer with one coat of red oxide primer and two coats of standard make light gray 608-4 synthetic enamel paint of 1st.quality after cleaning of rust ,dust and oily surface including cost of all material labour and T&P as per Technical specification
To provide Delta earthing for Transformers' neutral including fabrication of 3 no. 3.00 Mt. long electrodes, their placing 500 mm below ground level, interconnections using 75x10 mm MS flat.
Earthing of Transformers' neutrals with 75 X 10 mm MS flat run on ladder including cost of fabrication, connecting with delta with angle and flat and painting.
Carriage of oil tank of capacity 20 KL from 220/132 KV S/S Boner to 132 KV S/S Aligarh-V including loading and unloading & shifting.
Carriage of oil tank of capacity 20 KL from 132 KV S/S Aligarh-V to 220/132 KV S/S Boner including loading and unloading & shifting.
GARIMA AGENCIES
Reliance Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .