Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical ADD HANUMAN MANDIR ROAD KRISHNAPURI CHUTIA DORANDA CHUTIYA RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical ADD HANUMAN MANDIR ROAD KRISHNAPURI CHUTIA DORANDA CHUTIYA RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | Admitted-Fee/PreQual/Technical |
Tender Value
₹53.5 L
EMD Value
₹1.1 L
Closing Date
8 Aug 2026, 5:00 pmClosed
EE RMC
RMC
Construction of Community Hall under Ward No-20
2026_UDD_116492_1
300/eng 2026
Open Tender
Civil Works
Works
180 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.1 L
10 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
8 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil... 5.1.1 J.S.R. | 18.5 | cum | 139.58 | ₹2,582.23 |
| 2 | EARTH WORK IN EXCAVATION IN FOUNDATION... Extra for hard soil 5.1.1 J.S.R. + 5.1.2 | 84.39 | cum | 167.33 | ₹14,120.31 |
| 3 | EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH... from excavation 5.1.7 JSR | 34.93 | cum | 55.28 | ₹1,930.82 |
| 4 | EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH... after cutting 5.1.8 JSR | 91.01 | cum | 128.88 | ₹11,728.72 |
| 5 | Providing coarse clean local SAND IN FILLING... 5.1.10 JSR | 18.25 | Cum | 589.51 | ₹10,757.38 |
| 6 | Providing designation 75-B, BRICK FLAT SOLING... 5.6.3 JSR | 228.4 | Sqm | 330.34 | ₹75,448.66 |
| 7 | Providing and laying... cement concrete 1:2:4... 5.3.1.2 JSR | 20.32 | Cum | 4,598.23 | ₹93,449.83 |
| 8 | Centering and shuttering... for Foundations... 5.3.17 JSR | 109.96 | Sqm | 194.5 | ₹21,387.61 |
| 9 | Reinforced cement concrete... upto plinth 1:1.5:3... 5.3.9 JSR | 33.49 | cum | 5,218 | ₹1,74,750.82 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_157463.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .