| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 CrAccepted-AOC | ₹23.1 Cr | L1 | Accepted-AOC Work Order Issued to L1 Bidder. |
| 2 | L2₹23.6 Cr+₹46.4 L (2.00%)Rejected-Finance | ₹23.6 Cr+₹46.4 L (2.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹25.3 Cr+₹2.1 Cr (9.29%)Rejected-Finance | ₹25.3 Cr+₹2.1 Cr (9.29%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to Insufficient Machinery After Awarding Package No. WB 20 1238 vide NIT NO. 29 PMGSYIII PASMED 2024 25 20 Date 31.12.2024 Sl No 03 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Insufficient Machineries Batch Mix HMP 40 to 60 TPH HMP Drum Mix 40 to 60 TPH 60 to 90 TPH and Pug Mill Not Found. |
Tender Value
₹23.2 Cr
EMD Value
₹46.4 L
Closing Date
5 Feb 2025, 5:00 pmClosed
Superintending Engineer, RRNMU,Medinipur Circle
Superintending Engineer, RRNMU,Medinipur Circle
Upgradation of Road from MLR09 Rantua to Gobindapur under Gopiballavpur II Block in the District of Jhargram vide Package No. WB 24 20
2025_WBSRD_138426_1
WB2420
Open Tender
Civil Works - Roads
Percentage
365 days
JHARGRAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹46.4 L
Office of the Superintending Engineer, Medinipur
23 May 2025
6 Jan 2025
6 Feb 2025
6 Jan 2025
5 Feb 2025
6 Jan 2025
15 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost for Construction of PAVEMENT WORKS | 1 | Nos. | 15,19,41,287.52 | ₹15,19,41,287.52 |
| 2 | Cost for Construction of ROAD SAFETY WORKS | 1 | Nos. | 86,82,152.75 | ₹86,82,152.75 |
| 3 | Cost for Construction of ROAD FURNITURE WORKS | 1 | Nos. | 3,29,611.33 | ₹3,29,611.33 |
| 4 | Cost for Construction of CROSS DRAINAGE WORKS | 1 | Nos. | 68,39,514.88 | ₹68,39,514.88 |
| 5 | Cost for Construction of DRAINAGE | 1 | Nos. | 65,71,969.02 | ₹65,71,969.02 |
| 6 | Cost for Construction of PROTECTIVE WORKS | 1 | Nos. | 27,32,400 | ₹27,32,400 |
| 7 | Add @ 18% GST on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 8 | Add @ 1% Labour Welfare CESS on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 9 | 1st Year Routine Maintenance | 1 | Nos. | 7,33,740.14 | ₹7,33,740.14 |
| 10 | 2nd Year Routine Maintenance | 1 | Nos. | 10,38,240.14 | ₹10,38,240.14 |
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
160208672.xls
BOQ Document • 0.29 MB
CHECKLIST.xls
BOQ Document • 0.06 MB
160208673.pdf
Tender Document • 0.81 MB
SOQWB2420.pdf
Tender Document • 0.73 MB
BIDDERFILE.pdf
Tender Document • 0.17 MB
SBD.pdf
Tender Document • 1.80 MB
160208675.html
Tender Document • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .