| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance | ₹1.2 L | L1 | Accepted-Finance Ok |
| 2 | L2₹1.6 L+₹38,635 (32.9%)Accepted-Finance | ₹1.6 L+₹38,635 (32.9%) | L2 | Accepted-Finance Ok |
| 3 | L3₹1.6 L+₹41,050.90 (34.9%)Accepted-Finance | ₹1.6 L+₹41,050.90 (34.9%) | L3 | Accepted-Finance Ok |
| 4 | L4₹1.6 L+₹47,342 (40.3%)Accepted-Finance | ₹1.6 L+₹47,342 (40.3%) | L4 | Accepted-Finance Ok |
| 5 | L5₹1.9 L+₹73,684.50 (62.7%)Accepted-Finance | ₹1.9 L+₹73,684.50 (62.7%) | L5 | Accepted-Finance Ok |
Tender Value
₹3 L
Closing Date
15 Sept 2022, 6:00 pmClosed
DFO Billawar
Office of the DFO Billawar
Construction of 30 Nos Main Line Boundary Pillars Co. 17/Blr, Trapper
2022_FD_187343_1
68 of 2022-23
Open Tender
Civil Works
Item Rate
30 days
Billawar Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Billawar
Exempted
13 Oct 2022
7 Sept 2022
16 Sept 2022
7 Sept 2022
15 Sept 2022
7 Sept 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal sizeIncl. all carriages lifts complete job.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m Incl. all carriages lifts complete job.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size.Incl. all carriages lifts complete job.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended.
Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts
Suksham Raina
TILAK RAJ VERMA
surishet paul basotra
NARUPAM PARSHAD
SADAM HUSSAIN
SUMARP DEEP PAROTRA
M/S Bishan Singh Govt. Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .