Loading…
Loading…
Tender Value
₹3.4 L
EMD Value
₹6,780
Closing Date
10 Jul 2026, 4:00 pmDue today
XEN REW kathua
XEN REW kathua
Const. of (i) culvert in Choi Nallah on road of Gujjar Moh and Taal Moh. w.no.4 and (ii) Lane to the house of Ram Dass Supolia and others w.no.4, Pyt. Pallan, Block Billawar
2026_RDPR_314587_9
e-NIT No.76/REW/K of 2026-27 Dated 04/07/2026
Open Tender
Civil Works
90 days
Billawar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹6,780
4 Jul 2026
4 Jul 2026
11 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in All kinds of soil. | 16.72 | sqm | 24.12 | ₹403.29 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc., including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : | 1.2 | cum | 479.3 | ₹575.16 |
| 3 | Providing and layinng Dry stone agg. 40mm stone agg. | 2.99 | cum | 1,700 | ₹5,083 |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 Mix using 20% boulders. | 31 | cum | 4,774.46 | ₹1,48,008.26 |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 Mix | 1.45 | cum | 5,733.6 | ₹8,313.72 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 | 5 | cum | 7,788.4 | ₹38,942 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 500 | kg | 123.2 | ₹61,600 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundation. | 59.29 | sqm | 286.35 | ₹16,977.69 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Roofs | 11.15 | sqm | 718.2 | ₹8,007.93 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Edge of slab | 15.24 | sqm | 262.2 | ₹3,995.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.02 MB
BOQ_1018678.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid