Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAdmitted-Finance | ₹15.1 L | L1 | Admitted-Finance |
| 2 | L2₹15.3 L+₹20,400 (1.35%)Admitted-Finance 11TH FLOOR TOWER 1B KP TOWERS SECTOR 16B NOIDA GAUTAMBUDDHA NAGAR GAUTAMBUDDHA NAGAR GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹15.3 L+₹20,400 (1.35%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | Hi-M. Solutek India Private Limited L2 | BK AIRCON L1 |
|---|---|---|---|---|---|
| 1.00Comprehensive (Routine, Preventive and Breakdown) maintenance of LG make VRF / VRV Type AC units as per following including its all accessories, condensers, 20 evaporator units (cassette type ceiling mounted & ceiling mounted ductable FCUs), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits, etc. for smooth operation of the entire AC units. Any breakdown shall be attended within 4 hours of reporting. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one month) [Clause 23.1, page-39 and 40 may please read] | |||||
| 1.01 | Cluster - A: 4 Modules,
(Capacity: 22 to 26 HP); Total: 94 HP | 24 | Job | 27,730 ₹6,65,520 | 27,360 ₹6,56,640 Lowest |
| 1.02 | Cluster - B: 7 Modules,
(Capacity: 10 to 20 HP); Total: 122 HP | 24 | Job | 35,990 ₹8,63,760 | 35,510 ₹8,52,240 Lowest |
Tender Value
₹15.7 L
EMD Value
₹31,353
Closing Date
9 Jun 2026, 3:00 pmClosed
Executive Engineer
Assistant Executive Engineer-in-charge, AC Division, Works Department, IIT Delhi, Hauz Khas, New Delhi - 110016
Comprehensive Maintenance of 216 HP VRF ACs of Mittal Sports Complex, IIT Delhi
2026_IIT_909828_1
IITD/WORKS (SP-5308)/2026
Open Tender
Miscellaneous Works
Works
720 days
Indian Institute of Technology Delhi Hauz Khas
As per tender documents
15 documents required · 15 mandatory
₹0
₹31,353
30 Jun 2026
22 May 2026
10 Jun 2026
22 May 2026
9 Jun 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Comprehensive (Routine, Preventive and Breakdown) maintenance of LG make VRF / VRV Type AC units as per following including its all accessories, condensers, 20 evaporator units (cassette type ceiling mounted & ceiling mounted ductable FCUs), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits, etc. for smooth operation of the entire AC units. Any breakdown shall be attended within 4 hours of reporting. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one month) [Clause 23.1, page-39 and 40 may please read] | |||||
| 1.01 | Cluster - A: 4 Modules,
(Capacity: 22 to 26 HP); Total: 94 HP | 24 | Job | 100 | ₹2,400 |
| 1.02 | Cluster - B: 7 Modules,
(Capacity: 10 to 20 HP); Total: 122 HP | 24 | Job | 100 | ₹2,400 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_956240.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .