1) Bagalkot- Kudchi new line project proposed construction of ROB at Ch 35068 in lieu of LC No 1 as 1x18m Composite girder (Railway portion) +2x18.46m PSC Girder and U Type retaining wall + CC block wall in approaches, 2) ROB at Ch:36593 in lieu of LC no.2 as 1x24.0m composite girder+2x18.46m PSC Girder and U type retaining wall + CC block wall in approaches between Kajjidhoni and Lokapur stations. 3) ROB no 107A at Ch: 38173 as 1x18m composite girder (Railway portion) +2x 18.46m PSC girder and U type retaining wall + CC block wall in approaches between Lokapur and Yadawad stations.
ROB107A-LC-1-2-BGK-KUD
ROB107A-LC-1-2-BGK-KUD
Open
18 Months
Bagalkot, Karnataka
₹0
₹27.2 L
11 Apr 2025
11 Apr 2025
C-Supply of Cement
D-Concrete work
E-Supply of reinforcement
F-COE and Blanketing items
G-Super structure steel
M-Non DSR & Non USSOR Items
DECK SHEETING: 1. Designing, supplying, fabricating and providing of trapezoidal roll formed deck sheeting profiles of 50mm depth made of galvanised steel troughed metal decking plate over cross girders/supports for cast-in-situ deck slab of ROB. Thickness of deck plate shall be 1.00mm (minimum) and shall serve as permanent shuttering to deck slab of 250mm (max) thickness measured over crest of metal decking and shall have adequate strength to support the weight of green concrete 8 and imposed loads during concreting over a span of 2000mm between supports. Deck sheets to be embossed to facilitate enhanced sheet to concrete bonding with contractor's all materials, men, equipment, tools and plant, fixing arrangements, all lead and lift and the work to be carried out above Railway tracks and 25 KV OHE electrified area without affecting Railway traffic and damage to Railway properties as directed by Engineerin- charge. NOTE: 1. The rate includes submission of manufacturers design calculations/test reports, technical details and the supply to be taken from reputed manufacturing.
Providing safety barricading as per drawing.no.SWR/CN/BNC/SK/165-2018/R with contractor's materials and labour including all leads and lifts complete as directed by Engineer-in- charge. Note:- 1.Casting of RCC pillars shall be carried out in nominated depot and submerged water 8 curing. 2. The precast RCC posts shall be transported to date duly handing carefully without causing any damage and erect it nominated locations as per drawing duly ensuring safety of running trains. 3. Maintenance of the rope/wire.RCC pillars etc., shall be at the cost of contractor. 4. 90% payment shall be released after erecting fencing to the satisfaction of Engineer-in-charge. 5. Balance 10% will be released after certified date of completion.
Plotting initial levels: Computer Plotting of the theoretical cross section profile based on the initial levels of ground, recorded in the level books for cuttings/embankments at intervals of 8 25m or less including computation of theoretical profile/quantities duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc., and as directed by Engineer-in-charge. NOTES: i) Plottings and calculations are to be submitted to Railway in 3 sets. (ii) One cross section in one A4 size sheet is required.
Plotting final levels: Computer plotting of the theoretical & actual final finished cross section profile, duly indicating different type of strata available/ excavated in the x-section, based on the final levels recorded in the level books for banks/ cuttings at intervals of 25m or less, including 8 computation of theoretical/actual quantities done as per classification of different types of soil/blanketing material as certified by Engineer-incharge duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc., and as directed by Engineer-in-charge. NOTES: i) Plottings and calculations are to be submitted to Railway in 3 sets. ii)One cross section in one A4 sheet is required. iii) For embankments, computation of different soils viz., cut spoils, contractor's own earth, blanketing material are to be shown separately as per measurement recorded.
Fixing reference pegs: Striking out of centre line of railway alignment using total station or any other latest survey equipment and fixing centre line pegs of adequate size with Railway's tie bars/cut rails at every 100m on straight and 25m in curves, at bridges etc., with 8 contractor's surveyor, equipment, all consumables, labour etc. NOTES: (i) The reference pegs shall be fixed along the alignment at appropriate locations to provide information for execution of formation, bridges, ballasting and linking of track throughout the period of construction. (ii) Contractor is responsible for maintaining the reference pegs including shifting in case of shifting of alignment or to facilitate construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required.
Excavation along the alignment of signalling cable/OFC/power cable carefully and exposing the same without any damage, and excavating the new trench along the railway alignment 8 or along the alignment as specified by the railway Engineer-in-charge, laying or removed cable, filling up all complete with sand and laying a layer of brick with contractor's own material, tools and plants etc., as directed by the Engineer-in-charge. NOTE: 1. In case the cable is damaged cost of restoration and the cost of cable will be recovered from the contractor. The decision of the railways with regard the cost to be recovered will be final.
Dismantling of lifting barriers of the level crossing including dismantling of booms (two 8 numbers), winches, wire ropes, winch platform, AC sheet roofing if any complete to the satisfaction of Engineer-in-charge and transporting the same and handing over to SE/PWAY/stores with Contractor's men tools and plants complete. (Note: Both side lifting barrier).
Painting of crash barrier/kerb stones of CC/RCC slabs, stone with approved quality reflective type of enamel paint including one coat of primer with contractor's own labour, materials, etc.,
Supplying and providing UPVC rainwater pipe of 150mm dia of 6kg/sq cm working pressure (type B) conforming to IS13592 including specials as required and jointing with contractors materials and fixing accessories.
COMPLETION DRAWING: Preparation and submission of GAD/Completion drawing for the Major bridges/ROBS/RUBs based on soil exploration and water way calculation for fixing suitable 8 span as per RDSO design and drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer-in-charge to specified scales including submission of check print for proof check to incorporate suggested corrections and modifications and supply final copy in compact disk and 6 copies in ammonia print in A0 size with all contractor's materials, labours, tools, plants etc., complete.
Casting and laying in position M35 grade pre cast concrete facia panel / pre cast CC blocks with architectural finish of suitable size and thickness as per approved drawing, but not less than minimum 140mm thick excluding architectural finishes and including (Earth work excavation for foundation, providing initial leveling pad (minimum 150mm thick and having suitable width) as necessary, using M15 grade plain cement concrete. PCC shall be taken separately as per site 8 situation) necessary connection arrangements for soil reinforcement, necessary coping beam, neoprene sponge joint material between reinforced soil wall facia and crash barriers, the backfill material and the drainage material shall be separated using permeable nonwoven geotextile or synthetic geo grid and approved design, necessary anchor rods at the toe of wall for laying first pre cast CC blocks. Including all materials, labour, lead and lift, hire charges of all plants, machinery, lead lifts, loading, unloading etc., complete as per MORTH specifications and as directed by Engineer-in- charge
Filling coarse grained soil/earth in embankment for road approach as per approved reinforcement earth technology behind the precast facia panels with contractors supply of back fill materials which shall be free from organic or other deleterious materials and shall conform to the mechanical and physio-chemical requirements including mechanical compaction as per MORTH specifications and as directed by Engineer-in-charge
Supplying, Assembling, joining and laying of soil reinforcing elements connecting with 8 precast modular blocks, including connecting arrangements, all materials, labour, lead and lift, hire charges of machinery, complete, complying MORTH specifications and as directed by Engineer- incharge . a) Synthetic Geogrid
Supplying, providing, laying, spreading & compacting specified graded hard granite 8 stone aggregate wet mix macadam as per specifications including pre-mixing the materials with water to OMC in mechanical mixer (pugmill) carriage of mixed material by tipper to site with all lead & lift laying in uniform layers complete as per specifications.
Proof checking for CC Blocks (Two sides)
Item Breakup - A-DSR Items
Item Breakup - C-Supply of Cement
Ordinary Portland Cement 43 grade MT approved brands/makes SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY Total 69068325.00
Item Breakup - D-Concrete work
Extra for 150mm dia. bore in hard Metre Rock/large Boulder at all levels Drilling of NX size borehole (75mm dia.) in all types of hard rock and collection of rock core samples from boreholes and preserving in boxes.
Conducting California Bearing Ratio as per IS:2720
Taking out 100mm dia. & 450mm Each long undisturbed samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720.
Taking out 100mm dia. & 450mm Each long disturbed samples of soil from bore holes, including provision of air tight containers for packing, labeling and transporting the samples to laboratory. Samples shall be collected as per IS:2720.
Conducting standard penetration Each test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge
Collection of water required intervals Conducting laboratory Tests on collected soil samples as per relevant IS code
Moisture Content/Dry Density
Atterberg Limits
Specific Gravity
Grain Hydrometer analysis
Direct Shear Test
Natural Density SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
Consolidation Test
Unconfined Compression Test
Tri-axial Test Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code
Water Absorption & Porosity
Unconfined Compression Test
Point Load Test
Modulus of Elasticity
Abrasion Testing
Conducting chemical analysis of Each ground water samples to determine suitability for concreting and aggressiveness in relation to attack on concrete / reinforcement including determination of pH value.
Conducting chemical analysis of soil Each samples to determine aggressiveness in relation to attack on concrete / reinforcement including determination of pH value Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Soft rock (not requiring blasting)
Hard rock (blasting prohibited ) SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall
Abutment cap, Pier Cap, Inspection cum Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc.
Approach slab at formation level, cum Dirt wall/ ballast wall at formation level SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
Providing and laying Plain Cement cum Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer.
Providing and fixing Weep Holes in Metre Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. Boring, providing and installation of bored cast in-situ Reinforced Cement Concrete piles using Hydraulic piling Rig of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance concrete above cut off level etc., pumping and bailing out water complete in all respect as per approved drawing, specification and direction of the Engineer in charge. Note: 1. Payment for only cement, reinforcement shall be made extra. 2. Length of the pile for payment shall be measured up to the bottom of RCC pile Cap. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
1000mm diameter
Providing, fabricating and installing MT permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY E x t r a for chiselling in addition to boring of piles, if chiselling is required to be resorted to in hard rock or big stone boulders larger than 30cm, manually or by any other means.
1000mm diameter pile Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Routine Load capacity pile
Routine Load Test above 50 ton Each capacity up to 100 ton capacity pile
Routine Load Test above 100 ton Each capacity up to 250 ton capacity pile Lateral load testing of single pile in accordance with "IS Code of practice IS:2911 (Part-IV) for determining safe allowable lateral load of pile" with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification as directed by the Engineer.
Piles with lateral load capacity of Each above 50 ton and up to 100 ton
Pulse Echo Test (PET) for integrity Each testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, Sqm e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height over item Sqm no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
Providing and launching in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Post-tensioned) Concrete Girder/Box Girders/Slabs in contactor's casting yard in the vicinity of worksite, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings, specifications and direction of the Engineer. Note: 1. Payment for Shuttering, Cement, Reinforcement, HTS cables, Sheathing, Anchorage Cones, stressing of cables, grouting of the ducts and launching of girder/slab in position shall be made extra under relevant items. However, deduction shall be made in case of slab as per relevant item. 2. For pre-cast item, loading in transport vehicle in casting yard is included and shall not be paid extra. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
Providing, fabricating & fixing in MT position to exact design profiles, H.T.S. cables of all classification made from Low Relaxation strands conforming to IS:14268- latest version in Prestressed (Post- tensioned) Concrete girders/slabs etc. including supplying, cutting, making into cables with necessary spacers, colour coding, protecting with water soluble oil at all time, anchoring of cables, supplying and placing spiral corrugated type galvanized metal steel ducts sheathing made up of Cold Rolled Cold Annealed (CRCA) mild steel conforming to IS:513 of required diameter/ thickness, vent pipe, placing, bending, routing, fixing, stressing & grouting of cable ducts with cement grout, Anchorage sets in required number with provision for future prestressing if any including all lead and lift with contractor's own materials, labour, equipments etc. complete as per drawings & specifications. Rate also includes covering anchorage pads with epoxy mortar of approved quality to avoid corrosion. Cement for grouting to be paid separately. Payment shall be made in terms of weight of HTS cables as per drawing.
Design, manufacturing, supplying Cubic and fixing in position elastomeric Centimetre b e a r i n g true to line and level conforming to IS:3400, IS:226, BS- 5400 under prestressed concrete girders/ Steel Girders, for Pre-cast as well as cast-in-situ girders as per approved drawing. The rate shall include cost of load test of one no. bearing from Railway approved firms and all fixing materials, equipments, machineries, labour, taxes, loading, unloading, leading, lifting etc. complete. Rates include getting the drawing approved from Railway and cost of inspection during manufacturing from railway approved organization.Note : 1. The rate is for finished item complete and paid only after fixing in position below the girder. 2. The volume shall be as given in the drawing and no deduction shall be made for inserted steel plates etc. Providing and fixing in position of standard preformed sealed and slab type or strip seal elastomeric type expansion joints for Railway bridge or Road Over Bridges as per approved drawings and latest MORTH/IRC specifications complete in all respect as directed by Engineer in-charge.
For 40mm expansion
For 80mm expansion SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading material etc. The load shall be 1.25 times the stipulated design load.
For Span design load up to 100 MT
Extra for every increase of 1 MT or MT part thereof over 100 MT in the span design load capacity up to 800 MT
Supplying and laying 160mm dia. Metre PVC Pipes Class-I, capable for a pressure of 2.5 kg/sqm in footpath of ROB for laying cable with all contractor's materials labour, tools, plant, machinery, vehicles, consumables, lead, lift etc. complete as per specifications and as directed by Engineer in-charge.
Supplying weighing not less than 35 kg each at specified bridge locations.
Providing and laying of filter media cum consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines.
Providing Boulder Backing behind cum wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra.
Dewatering accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY Designing and developing Detailed structural and working Drawings for following items for ROB/RUB/Bridge based on Railway's approved GADs, duly collecting necessary data from Railways and R&B authorities, duly designing members and submission of check plot duly getting proof- checked by Railway approved institutes, submitting for Railway's verification and approval, making corrections duly incorporating suggestions in drawings/designs, further submission of original in transparent film paper and soft copy (CD) for Railways approval etc. with contractor's technical expertise and instruments, labour, consumables, repeatedly attending till final approval etc., complete as directed by Engineer in-charge.
Open / Pile / Well Foundation for Set piers/abutments
Foundation and sub-structure for Set RCC retaining wall, abutment and approach slab Total 111110328.01
Item Breakup - E-Supply of reinforcement
Thermo-Mechanically Treated bars Kg of grade Fe-500D or more of approved brands/makes. Total 232986600.00
Item Breakup - F-COE and Blanketing items
Using Soil Class SQ2 Total 7770900.00
Item Breakup - G-Super structure steel
Plate Girder/Composite Girder (Steel Work)
Extra for using steel conforming to MT Grade Designation E350 instead of Grade Designation E250 of Quality "B0" as per IS: 2062 Metallizing of steel work of girders with sprayed aluminium after surface preparation by Sand/grit blasting, followed by one coat of etch primer (IS:5666) & one coat of Zinc Chrome primer (IS:104) and two coats of aluminium paint (IS:2339) with all labour, T&P and material as a complete job duly conforming to all relevant specifications and process given under Clause 39 of IRS-B1-2001. Note: Nominal Thickness of sprayed Aluminium coating shall be 150 microns. DFT of Zinc chrome primer shall be 25-30 microns and DFT of each coat of Aluminium paint shall be 12-14 microns.
On new girder during fabrication
Supplying, Fabricating and fixing MT access ladders, inspection platforms, Trolley refuges etc., on bridges with structural steel conforming to IS:2062 including welding / bolting, priming painting with one coat of ready mixed paint of Zinc Chromate (IS:104) with DFT of 25-30 microns followed by one coat of Zinc Chrome Red Oxide (IS:2074) with DFT of 25 microns with all material, labour, T&P as a complete job. Note: Painting shall be paid separately under relevant item. Launching in position, by any approved method, pre-fabricated Steel Girders, precast PSC girders/slabs, casted at casting bed developed at site, to correct alignment and level over the bed block / pedestal with all required arrangements, complete in all respect.
PSC girders / slabs Total 47074923.40
Item Breakup - L-Track works
One mobile Gang comprising of 15 Gang Day physically fit labours plus 1 Mate. N o t e : (1) In case, contractor provides less no. of Labour/Mate or for non availability of vehicle, payment will be deducted for each such person or non-availability of vehicle @ 20% of the accepted item rate, separately for each shortfall. (2) The Contractor shall keep one pick up Truck of minimum 1.5T payload capacity with Driver all the time and all expenditures for running at an average of 80 kms per day shall be born by the Contractor.
Dismantling existing check rail of RM Level Crossing, blocks, bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by Engineer in-charge.
Dismantling existing lifting barrier Set along with winch assembly and other components like boom, fringes, locking arrangements, pedestal, boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base and other materials connected with functioning of lifting barrier, removing engineering indicators on track and level crossing road signages without any damage including demolishing concrete base of existing structures, filling, ramming and levelling the ground disturbed during demolition, clearing debris and stacking all released material in a neat and countable manner and clear of infringements, as directed. Note: Barriers on both sides of level crossing constitute one set. SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
Fabrication bending/machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway's approved drawings & specifications for level crossings / trolley paths/inspection lines in yards duly cutting rail flanges, wherever required to correct alignment and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores.
Manufacture of flared portion of Set Guard Rail by cutting and bending to required shape & RDSO's approved drawings. Note: (1) Rails shall be supplied by Railways. (2) One set consists of two rails i.e. both left and right.
Providing and fixing of flared portion Set of guard rails of any rail section over PSC sleepers including fixing of with all fittings, including leading of rails and fittings, squaring and adjusting spacing of sleepers as required, providing nose blocks duly cutting wooden blocks supplied by railways and fixing it with bolts of 16mm dia as directed complete and finished as per RDSO's approved drawing. Note: 1.One set consists of LH & RH side rails of one end. 2.Required P.Way fittings will be supplied at SSE stores depot.
Drilling holes 25mm to 40mm dia. Each with drill twist in the foot of guard rails for fixing guard rails on bridge as directed.
Drilling of 25mm to 40mm dia. holes Each in PSC sleepers with suitable rotary hammer / drilling machine at indicated location for fixing of guard rails on bridges & its approaches as per approved drawing and fixing of contractor's HDPE dowels and adhesive of approved quality to Drawing no. RDSO/T-3002, procured from RDSO's approved sources with contractor's materials and consumable. Total 366532.66