| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.6 L+₹960.02 (0.10%)Rejected-AOC SAHARANPUR NAGAR NIGAM SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹9.6 L+₹960.02 (0.10%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.6 L+₹1,440.04 (0.15%)Rejected-AOC | ₹9.6 L+₹1,440.04 (0.15%) | L3 | Rejected-AOC L3 |
Tender Value
₹9.6 L
EMD Value
₹96,003
Closing Date
25 May 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction of puliya, ramp and cc from chidiya kabadi wali gali to fareed abbas and budhi mai chowk to ansari choqk and chowki shadat to khatiko and primary school to birju wali masjid for khateeko ka mohallah at ward no. 43
2026_NNSAH_1152089_1
6252 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹96,003
3 Aug 2026
22 May 2026
25 May 2026
22 May 2026
25 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old damged cc road inculding in all complete work | 338.09 | M2 | 38 | ₹12,847.42 |
| 2 | Disposal of malwa upto 5km including loading and unloading labour T&P etc in all work complete. | 50.71 | m3 | 130 | ₹6,592.3 |
| 3 | Cemant concrete with 4cm Gauge stone Ballast Fine sand of 1.25 FM and cemant in Proportion of 12:6:1 in Founfation including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 273) | 33.81 | m3 | 2,985 | ₹1,00,922.85 |
| 4 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete | 75.48 | cum | 7,300 | ₹5,51,004 |
| 5 | M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work S.I No.305 a | 9.35 | m3 | 4,690 | ₹43,851.5 |
| 6 | 12mm thick plaster 1:4 cement and Fine sand mortar in all complete (SI. no. 584) | 29.76 | m2 | 165 | ₹4,910.4 |
| 7 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 284(a)) | 4.52 | m3 | 7,400 | ₹33,448 |
| 8 | Mild steel work in all work complete (S.I. No. 504) | 354.82 | kg | 85.29 | ₹30,262.6 |
| 9 | M.S or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating in all complete work | 348.75 | kg | 85.29 | ₹29,744.89 |
| 10 | Add 18%GST | 1 | No | 1,46,442.04 | ₹1,46,442.04 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
BOQ_2158195.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .