| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | ₹5.7 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.9 LRejected-AOC METTUPALAYAM KOKKALAI | ₹5.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M Thangavel L2 | GOPAL & CO L1 |
|---|---|---|---|---|---|
| 1.00Providing Toilet (Boys and Girls) Rppf Arrangements for Velagoundampatty PUE School H/O .Marukkalampatty in Elachipalayam Block under AALA -2022-2023 | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 0.32 | Cum | 263.78 ₹84.41 | 263.78 ₹84.41 |
| 3.00 | Cement Concrete 1:4:8-using 40mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete. | 0.07 | Cum | 5,430.9 ₹380.16 | 5,430.9 ₹380.16 |
| 4.00 | Cement Concrete 1:2:4-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete. | 0.25 | Cum | 6,740 ₹1,685 | 6,740 ₹1,685 |
| 5.00 | Towards the cost and supply and fixing of Squre Pipe including all charges etc., complete | 553.3 | Sqm | 120 ₹66,396 | 107 ₹59,203.10 |
| 6.00 | Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. . | 34.56 | Sqm | 1,180.2 ₹40,787.71 | 1,080.2 ₹37,331.71 |
| 7.00Renovation of Compound Wall and Gate for Velagoundampatty PUE School H/O .Marukkalampatty in Elachipalayam Block under AALA -2022-2023 | |||||
| 8.00 | Dismantling of Brick Work including all labour Charges etc Complete W-0015 | 2.07 | Cum | 302.96 ₹627.13 | 302.96 ₹627.13 |
| 9.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 0.88 | Cum | 131.89 ₹116.06 | 131.89 ₹116.06 |
| 10.00 | Cement Concrete 1:4:8-using 40mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete. | 0.29 | Cum | 5,430.9 ₹1,574.96 | 5,430.9 ₹1,574.96 |
Tender Value
Refer Docs
EMD Value
₹5,950
Closing Date
12 Dec 2025, 3:00 pmClosed
BDO BP
BDO Office Elachipalayam
4 Construction Works for Velagoundampatti School H/o.Marukkalampatti in Elachipalayam Block of Namakkal District under Arignar Anna Leadership Award 2022-23
2025_RDTN_629287_1
4379/2025
Open Tender
Civil Works
180 days
Marukkalampatti
as per schedule
2 documents required · 2 mandatory
₹0
₹5,950
Yes
9 Feb 2026
5 Dec 2025
12 Dec 2025
5 Dec 2025
12 Dec 2025
6 Dec 2025
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete 1:4:8-using 40mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Cement Concrete 1:2:4-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Towards the cost and supply and fixing of Squre Pipe including all charges etc., complete
Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. .
Renovation of Compound Wall and Gate for Velagoundampatty PUE School H/O .Marukkalampatty in Elachipalayam Block under AALA -2022-2023
Dismantling of Brick Work including all labour Charges etc Complete W-0015
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete 1:4:8-using 40mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Cement Concrete 1:2:4-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc.
Reinforced Cement Concrete 1:1.5:3-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc
Painting two coats of old plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Supply and Fixing of New Gate Including all Labour Charges etc Complete M-0196 + W-0168
Painting the New iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Construction of Sump for Velagoundampatty PUE School H/O .Marukkalampatty in Elachipalayam Block under AALA -2022-2023
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete
Cement Concrete 1:4:8-using 40mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Cement Concrete 1:2:4-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc.
Reinforced Cement Concrete 1:1.5:3-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Plastering with Cement Mortar 1:3 (One cement and three M.Sand), 10mm thick in all floors including curing etc.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete
Supplying and fixing in position C.I.Manhole covers (heavy duty) of various sizes of best approved quality and as per standard specificationsetc.,complete.0.6X0.6M Size etc., complete.
PVC mould CI steps for sump M-0653
Provision for 1.5 Sq.mm cable arrangement charges etc Complete
Supply and Fixing of 63mm PVC Pipe Including all Labour Charges etc
Earth work excavation in all soils with excavated soil after laying pipeline
Laying of PVC Pipes for extention of pipe line
Refilling the trenches with excavated earth
Providing CC Pavement velagoundampatty PUE School H/O Marukkalampatty in Elachipalayam Block under AALA -2022-2023
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8-using 40mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc.
Cement Concrete 1:2:4-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Cement Concrete 1:1.5:3-using 20mm ISS hbgs including cost and conveyance of all materials and labour charges etc.,complete.
Providing PVC Pipe 90mm Dia including cost and conveyance of all materials to site including all labour charges
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_752496.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Schedule_school.pdf
Tender Documents • 1.21 MB
BOQ_752496.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid