| 1 | 1₹9.1 CrAccepted-AOC | ₹9.1 Cr Quoted ₹7.7 Cr | 1 | Accepted-AOC L1, Senior Most |
| 2 | 1₹7.7 CrRejected-Finance | ₹7.7 Cr | 1 | Rejected-Finance Other than Senior most |
| 3 | 1₹7.7 CrRejected-Finance | ₹7.7 Cr | 1 | Rejected-Finance Other than Senior most |
Tender Value
Refer Docs
Closing Date
15 Mar 2024, 3:00 pmClosed
CMNM
Haldia-Mourigram-Rajbandh-Barauni Pipelines, P.O. Duilya, Andul-Mouri, Mourigram Distt. Howrah 711 302.
Deployment of security personnel for line patrolling and security arrangements in the right of way (ROW) of HMRBPL, ATFPL and PHDPL through DGR in West Bengal.
2024_HMRBM_175891_1
HMRBTS2333
Limited
Administration and Welfare works
Works
730 days
HMRBPL, ATFPL and PHDPL ROW in West Bengal
Please refer tender documents
4 documents required · 4 mandatory
Exempted
15 Apr 2024
6 Mar 2024
16 Mar 2024
6 Mar 2024
15 Mar 2024
6 Mar 2024
Amount
Providing Services of the Ex-Service man for Line patrolling and security Arrangenments of unmanned section of Right of way (ROW) in HMRBPL/PHDPL/ATFPL- Area A as per detailed scope of work and instruction of site Engineer/EIC. This will include all costs as per DGR norms. [Price break-up per person per day calculated as per guidelines of DGR: Refer to SCC Guard Total Cost per head: Rs. 1511.57 Supervisor Total Cost per head: Rs. 1985.62]
Guard
Supervisor
Providing Services of the Ex-Service man for Line patrolling and security Arrangenments of unmanned section of Right of way (ROW) in HMRBPL/PHDPL/ATFPL-- Area B as per detailed scope of work and instruction of site Engineer/EIC. This will include all costs as per DGR norms. [Price break-up per person per day calculated as per guidelines of DGR: Refer to SCC Guard Total Cost per head: Rs. 1320.02 Supervisor Total Cost per head: Rs. 1723.76]
Guard
Supervisor
Group Insurance Cost for two Years excluding GST: Rs 250446.00 Note: Lumsum amount has been kept for this item. Same will be reimbursed by owner on actual basis upon submission of documentary evidence by the contractor. The amount is fixed bidder need not to quote in this item
SISIR KUMAR BAG SECURITY AGENCY
DIPTA RANJAN RAY SECURITY AGENCY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_186005.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .