Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.6 L+₹2.4 L (9.55%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹28.9 L+₹3.7 L (14.8%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M/S P.SWAROOP KUMAR L3 | NEWS CONSTRUCTIONS L1 | VACON INFRASTRUCTURES L2 |
|---|---|---|---|---|---|---|
| 1.00Note: 1. Contractor need to purchase minimum 50% of all items mentioned in this CA within 20 days of getting sample approval and kept in custody so that no delay in work due to non-availability of materials will be faced. Contractor should ensure during the cause of work that he has minimum 25% of materials with him till the completion of item/date. 2. Contractor should buy the exact items which are given with catalogue reference. Other makes will be approved only by submitting non availability Certificate Company. Contractor need to remove all the dismantled items without delay. 3. Rate quoted for demolition/dismantling /taking down is inclusive of removing the same from site and dumping at given locations anywhere inside station. 4. If any painting works, contractor need to clean the area and remove the drop marks from floor, doors, windows, sills, inbuilt furniture items etc. otherwise a recovery of Rs 10.00 per sqm in internal paintings and Rs 5.00 per sqm for external paintings will be made from contractor. 5. Contractor should maintain separate registers for plumbing and carpenter repair works. Day to day complains should be noted in those registers with SI nos of complaints, location, qty of work, status of complaints and signature of incharge and stamp of the office. Format will be given from AGE B/R Office. Contractor should obtain the signature of incharge on the same day of work. These registers to be submitted to JE (Civ) on every weekend without fail. 6. List of complaints will be given to contractor on the first week of every month. Contractor should ensure all the works will be completed within that month itself. 7. Contractor should ensure that plumbing complaints resulting in wastage of water should be attended and rectified within 24 hours. Otherwise, a recovery of 25% of corresponding item will be made from contractor. 8. Contractor will make his own arrangement to store his items. 9. Some places in this contract where the vehicle will not reach the spot directly, the material will be moved manually in these places. The rate quoted will be considered all inclusive on this account. 10. All trade skilled labour required in this contract shall be present daily in working hours, irrespective of complaints received. 11. Complaint for a similar items may be in scattered / different area, quoted rate will be considered all inclusive on this account. 12. Complaint is not attended by contractor, the penality per day Rs. 1000 will be recovered from payment of the contractor. | ||||||
| 1.01 | Dismantling of floor, hearth or wall tiling including cement mortar bedding (but not backing) and removing the rubbish off the premises all as specified and directed. | 210 | Sqm | 40 ₹8,400 | 25 ₹5,250 Lowest | 25 ₹5,250 Lowest |
| 2.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete including disposal of debris at low laying areas as directed by Engr-In- Charge | 6.5 | Cum | 400 ₹2,600 | 400 ₹2,600 | 200 ₹1,300 Lowest |
| 3.00 | M&L, 30mm thick PCC 1:2:4 type B-0 using 12.5mm graded stone aggregate as in flooring, finishing the surface even and smooth using extra cement including necessary formwork complete all as specified and directed. | 270 | Sqm | 140 ₹37,800 | 50 ₹13,500 Lowest | 200 ₹54,000 |
| 4.00 | M&L, light coloured vitrified tiles in floors of size 600 x 600 x 9 to 10mm thick, set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile over and including screed bed or bedding layer 15mm thick in CM 1:4 complete all as specified and as directed complete all as specified and as directed.
Note: Shade and design/pattern of tiles shall be as directed by GE. | 230 | Sqm | 1,100 ₹2,53,000 | 900 ₹2,07,000 Lowest | 1,300 ₹2,99,000 |
| 5.00 | M&L, 9 to 10mm thick light coloured vitrified tiles in skirting of size 600 x 100mm, set and jointed in neat cement slurry and pointed in coloured cement to match shade of tile over and including 10mm thick backing coat in CM 1:3 complete all as specified and as directed. | 20 | Sqm | 1,150 ₹23,000 | 925 ₹18,500 | 700 ₹14,000 Lowest |
| 6.00 | M&L, 7 to 8mm thick coloured, joint free Non skid ceramic tiles of size 400 x 400mm, in floors etc., set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile over and including screed bed or bedding layer 15mm thick in cement mortar 1:4 complete all as specified and as directed.
Note: Shade, design/pattern of tiles shall be as approved by GE | 40 | Sqm | 900 ₹36,000 | 875 ₹35,000 Lowest | 900 ₹36,000 |
| 7.00 | M&L, coloured glazed ceramic tiles of size 300 x 450mm, 6 to 7mm thick in dado etc., set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile over and including 10mm thick backing coat in CM 1:3 complete all as specified and as directed. | 150 | Sqm | 850 ₹1,27,500 Lowest | 900 ₹1,35,000 | 900 ₹1,35,000 |
| 8.00 | Demolition of stone slabs, tiles, cement concrete tiles/paver blocks of any description or thickness in floors, laid and bedded in any mortar including disposal of debris off the premises complete all as directed. | 1.8 | 10 Sqm | 400 ₹720 | 200 ₹360 | 100 ₹180 Lowest |
| 9.00 | M&L, 18 to 20mm thick, approved machine cut, coloured Granite, factory polished, edges rounded in steps, cooking platform and the like laid over and including screed bed or bedding layer 20mm thick in cement mortar 1:4, pointing with white cement (1:2) using marble dust with admixture of pigment to match the shade of granite stone complete all as specified and directed. | 12 | Sqm | 4,000 ₹48,000 | 2,500 ₹30,000 Lowest | 3,300 ₹39,600 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
7 Oct 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) Hakimpet
Secunderabad
COMPREHENSIVE MAINTENANCE OF B/R ITEMS TO OTM ACCN AND ALLIED WORKS AT AFS BEGUMPET UNDER GE (AF) HAKIMPET
2025_MES_729962_1
8830/E8
Open Tender
Civil Works
Item Rate
270 days
Begumpet
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) Hakimpet
₹60,000
Yes
15 Nov 2025
9 Sept 2025
9 Oct 2025
9 Sept 2025
7 Oct 2025
23 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .