Tender Value
₹46.9 L
EMD Value
₹93,720
Closing Date
8 Jul 2026, 12:15 pmDue today
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
2026_DOA_171080_1
DSWC/SAN/2026-27/08
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹1,500
₹93,720
1 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
FINANCIAL BID NO.: DSWC/SAN/2026-2027/08
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Rattakhera (C/o 44805/L)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 286.65 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 210 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 161.2 Rupees One Hundred Sixty One and Twenty Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 1 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350 mm) /Riser & Valve 575 Rupees Five Hundared Seventy Five Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 289 Rupees Two Hundred Eighty Nine Only
Fixing of Gate valves with C.C 1:2:4 (350 mm) 0 /Gate Valve 1740.56 Rupees One Thousand Seven Hundred Thirty Six and Fifty Four Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3.00 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3870.2 Rupees Three Thousand Eight Hundred Seventy and Twenty Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5104 Rupees Five Thousand One Hundred Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Forty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.1 Rupees Two Hundred Two and Ten Paise Only
RCC Slab 1:2:4 0.21 cum 8200 Rupees Eight Thousand Two Hundred Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis 44805-L RATTAKHERA
Cost of Other Items Material Contingency Labor Khaal Total Est Pass Amount Difference
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 152673 1069 0 214900
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 7.728 KG 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 18.36 Ton 172.94 Rupees One Hundred Seventy Two and Ninety Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Phulera (C/o 6200/R)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1446.9 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1060 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 160.75 Rupees One Hundred Sixty and Seventy Five Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 10 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350 mm) /Riser & Valve 570.55 Rupees Five Hundared Seventy and Fifty Five Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 288 Rupees Two Hundred Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (350 mm) 2 /Gate Valve 1736.54 Rupees One Thousand Seven Hundred Thirty Six and Fifty Four Paise Only
Fixing of PUMP STAND (900 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 1 /Pump Stand 5592 Rupees Five Thousand Five Hundred Ninety Two Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3.00 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3870.2 Rupees Three Thousand Eight Hundred Seventy and Twenty Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5104 Rupees Five Thousand One Hundred Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Forty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.1 Rupees Two Hundred Two and Ten Paise Only
RCC Slab 1:2:4 0.21 cum 8200 Rupees Eight Thousand Two Hundred Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis 6200/R PHULERA
Cost of Other Items Material Contingency Labor Khaal Total Est Pass Amount Difference
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 5841 0 1174000
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 39.008 KG 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 92.664 Ton 172.94 Rupees One Hundred Seventy Two and Ninety Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 700 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - DASKA, RATTAKHERA (C/o 44000-L)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 14390.08 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 6910 /Mtrs 87 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 388.2 Rupees Three Hundred Eighty Eight and Twenty Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (700 mm) 48 /Cut hole 172 Rupees One Hundred Seventy Two Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 18 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (700 mm) /Riser & Valve 1121.5 Rupees One Thousand One Hundred twenty One and Fifty Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287.88 Rupees Two Hundred Eighty Seven And Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (700 mm) 14 /Gate Valve 2921.68 Rupees Two Thousand Nine Hundared Twenty One And Sixty Eight Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3871 Rupees Three Thousand Eight Hundred Seventy One Only
Plain Cement Concrete 1:2:4 0.14 cum 5106 Rupees Five Thousand One Hundred Six Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Fourty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.25 Rupees Two Hundred Two and Twenty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8202 Rupees Eight Thousand Two Hundred Two Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for SEVEN Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 1092.886 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 2051.968 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency -46366
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - RAIDHARANA (C/o 5847-R)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2115.75 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1550 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 161 Rupees One Hundred Sixty One Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 17 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 5 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350 mm) /Riser & Valve 570.55 Rupees Five Hundred Seventy and Fifty Five Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 288 Rupees Two Hundred Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (350 mm) 8 /Gate Valve 1736 Rupees One Thousand Seven Hundared Thirty Six Only
Fixing of PUMP STAND (900 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 6 /Pump Stand 6631 Rupees Six Thousand Six Hundred Thirty One Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3871 Rupees Three Thousand Eight Hundred Seventy One Only
Plain Cement Concrete 1:2:4 0.14 cum 5106 Rupees Five Thousand One Hundred Six Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Fourty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.25 Rupees Two Hundred Two and Twenty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8202 Rupees Eight Thousand Two Hundred Two Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 57.04 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 135.864 Ton 172.94 Rupees One Hundred Seventy Two and Ninety Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency -18546
Grand Total (A+B+C+D)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
NITUGPL262708.pdf
Tender Documents • 0.52 MB
DNITUGPL262708.pdf
Tender Documents • 1.17 MB
FBUGPL262708.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid