Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹17.7 L+₹57,880.61 (3.28%)Accepted-AOC N A | FARIDABAD | HARYANA | 121004 | L2 | Accepted-AOC The bid is rejected as the bid amount for the work was second
Compared to the lowest 1st successful bidder | |
| 2 | L1₹17.7 LRejected-AOC | L1 | Rejected-AOC Bid is awarded as the bidding price was lowest among all bidding contractors | |
| 3 | L3₹18.6 L+₹93,089.61 (5.27%)Rejected-Finance | L3 | Rejected-Finance The Bidder is third lowest | |
| 4 | L4₹18.9 L+₹1.3 L (7.22%)Rejected-Finance | L4 | Rejected-Finance The Bidder is forth lowest | |
| 5 | L5₹21.4 L+₹3.7 L (21.1%)Rejected-Finance BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L5 | Rejected-Finance The Bidder is fifth lowest |
Tender Value
Refer Docs
EMD Value
₹54,200
Closing Date
2 Dec 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. M.G.C.Q.C.D-2, Haridwar
E.E. M.G.C.Q.C.D-2, Haridwar
CONSTRUCTION OF LINED CANAL FROM KM 31.050 TO KM 31.080 OF MAIN CANAL MGC Stage-II
2020_UPIDC_532552_26
03/EE/2020-21
Open Tender
Civil Works - Canal
Item Wise
120 days
Chandpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹54,200
15 Dec 2021
25 Nov 2020
3 Dec 2020
25 Nov 2020
2 Dec 2020
25 Nov 2020
90 days
Amount
Earth work in excavation or digging main canal in all type of soil and disposal of excavated earth to be deposited on spoil bank including all labour, T&P, leads and lifts etc.
Earth work in excavation or digging main canal in all type of soil and disposal of excavated earth to be deposited on spoil bank including all labour, T&P, and lifts and lead up to 200 mtr. etc.
Earth work in lip cutting in all type of soil with all lift & lead 68M and disposal of surplus earth.
Cement concrete (M-15 grade) 1:2:4 with cost of material, labour and T&P
Painting two coat (80/100) of bitumin on top of sleepers including cost of material, labour and T&P
Providing and laying LDPE film 200Micron including cost of material, labour and T&P
Providing and laying 100mm thick CC 1:2:4 (M-15 grade) in Bed by paver machine includingcost of material, labour and T&P
Cement Concrete compressed double tile lining on slope including cost of material, labour and T&P
Filling of groove joints in lining with bitumen (80/100) Maxphalt Powder includingcost of material, labour and T&P
M-100 brick work in 1:4 cement coarse sand mortar includingcost of material, labour and T&P
Supply and adding admixture in concrete lining in bed includingcost of material, labour and T&P
Making curing drain as per drawing i/c concrete masonry includingcost of material, labour and T&P
Making side drain on both side berm as per drawing includingcost of material, labour and T&P
Providing and laying coarse sand in filter includingcost of material, labour and T&P
Providing and laying graded gravel 5–20mm size includingcost of material, labour and T&P
Providing and laying graded gravel 20–40mm size including cost of material, labour and T&P
Making 0-3M×0.3M size porous concrete window in bed and slope
Providing and fixing 150mm dia perforated PVC pipe for longitudinal drain
Shuttering including cost of material, labour and T&P
Dewatering including cost of fuel labour and T&P required for proper compaction of work.
Providing and fixing 100mm dia perforated PVC pipe for longitudinal drain and X-drain in bed including cost of material, labour and T&P
c.c M-10 in base of chanber Proving and laying porous concrete 1:0:8 on chamber size (0.30×0.30) in bed of canal including cost of material, labour and T&P
Handling and fixing 100mm dia or 150mm dia PRV excluding cost of PRV, labour only
Laying interlocking CC Tiles near Daula on both side roads including cost of material, ordinary sand, labour and T&P etc complete but including interlocking tiles
Supplying & laying 75mm thick flat brick soling with 1:3 cement mortar & 1:3 cement mortar flush pointing on top including cost of material, labour and T&P
Turfing with chippi grass i/c nuring & dewatering including cost of material, labour and T&P
Earth work in filling for making bandha in all type of soil i/c all labour material T&p etc complete.
Earth work inremoving bandha in all type of soil i/c all labour material T&p etc complete.
SHEESHPAL SINGH CONTRACTOR
M/S KUNWAR ENGINEERING WORKS
M/S DALCHANDRA CONTRACTOR AND SUPPLIER
MANOJ CHAUDHARY
Nathiram
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .